A large integration of renewable energy sources such as wind power generation and photovoltaic generation causes some problems in power systems, e.g., distribution voltage rise and frequency fluctuation. Battery energy storage system (BESS) is one of the effective solutions to these problems. Due to a high cost of the BESS, an application of controllable loads such as electric vehicle (EV) and heat pump water heater (HPWH) to the power system control is considered in this paper for reduction of the required capacity of the BESS. This paper proposes a new supplementary load frequency control (LFC) method by use of a number of both the EVs and the HPWHs as controllable loads. The effectiveness of the proposed LFC method is shown by numerical simulations conducted on the power system model with a large integration of wind power generation and photovoltaic generation.
1 April 2011 in Journal of International Council on Electrical Engineering
Power imbalances such as power shortfalls and photovoltaic (PV) curtailments have become a major problem in conventional power systems due to the introduction of renewable energy sources. There can be large power shortfalls and PV curtailments because of PV forecasting errors. These imbalances might increase when installed PV capacity increases. This study proposes a new scheduling method to reduce power shortfalls and PV curtailments in a PV integrated large power system with a battery energy storage system (BESS). The model of the Kanto area, which is about 30% of Japan’s power usage with 60 GW grid capacity, is used in simulations. The effect of large PV power integration of 50 GW and 100 GW together with large BESS capacity of 100 GWh and 200 GWh has been studied. Mixed integer linear programming technique is used to calculate generator unit commitment and BESS charging and discharging schedules. The simulation results are shown for two months with high and low solar irradiance, which include days with large PV over forecast and under forecast errors. The results reveal that the proposed method eliminates power shortfalls by 100% with the BESS and reduce the PV curtailments by 69.5% and 95.2% for the months with high and low solar irradiance, respectively, when 200 GWh BESS and 100 GW PV power generation are installed.
In future power systems with extremely large integration of photovoltaic (PV) generation, it is necessary to not only properly maintain supply–demand balance without power shortfall but also utilize as much PV energy as possible. The application of PV power forecast and energy storage devices to power system operation is necessary. In this study, we propose a method for determining and modifying the charging and discharging schedule of a battery energy storage system (BESS) and the unit commitment of thermal generators based on the PV power forecast. The proposed method is evaluated by numerical simulations for one year. The results show that both the energy shortfall and PV curtailment can be reduced by the proposed method.
With recent development of power electronics technology, power system stability enhancement and optimal power flow control by using flexible AC transmission system (FACTS) devices have so far been studied. The FACTS devices to relieve multiple constraints can also make it possible to enhance Available Transfer Capability (ATC) without construction of new transmission lines. In this paper, a new method for improving transient stability by unified power flow controller (UPFC) is proposed. Then the proposed method is applied to an OPF control by using UPFC for avoiding multiple constraints. The new OPF method is used for enhancement of ATC taking into account transient stability constraints as well as overload and steady-state stability constraints. The OPF problem is formulated to minimize total inverter capacity of UPFC. Effectiveness of the proposed method is shown by numerical examples for 3-machine 9-bus system and 10-machine 47-bus system.