Renato Elias Nunes Moraes

Prof. Renato Elias Nunes Moraes

Universidade Federal do Espírito Santo, Vitória, Espírito Santo, Brazil
orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 January 2023 in Swarm and Evolutionary Computation
Verified
Journal Article
Closed access
ISIsrael Pereira Souza
Israel Pereira Souza
MBMaria Claudia Silva Boeres
Maria Claudia Silva Boeres
RMRenato Elias Nunes Moraes
Renato Elias Nunes Moraes

30 September 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LMLaurence Colares Magalhães
Laurence Colares Magalhães
LMLuciano C. Magalhães
Luciano C. Magalhães
JRJhonatan B. Ramos
Jhonatan B. Ramos
LMLuciano R. Moura
Luciano R. Moura
RMRenato Elias Nunes Moraes
Renato Elias Nunes Moraes
JFJoão Carlos Espíndola Ferreira
João Carlos Espíndola Ferreira
Digitization and virtualization represent key factors in the era of Industry 4.0. Digital twins (DT) can certainly contribute to increasing the efficiency of various productive sectors as they can contribute to monitoring, managing, and improvement of a product or process throughout its life cycle. Although several works deal with DTs, there are gaps regarding the use of this technology when a Flexible Manufacturing System (FMS) is used. Existing work, for the most part, is concerned with simulating the progress of manufacturing without providing key production data in real-time. Still, most of the solutions presented in the literature are relatively expensive and may be difficult to implement in most companies, due to their complexity. In this work, the digital twin of an FMS is conceived. The specific module of an ERP (Enterprise Resources Planning) system is used to digitize the physical entity. Production data is entered according to tryouts performed in the FMS. Sensors installed in the main components of the FMS, CNC (computer numerical control) lathe, robotic arm, and pallet conveyor send information in real-time to the digital entity. The results show that simulations using the digital twin present very satisfactory results compared to the physical entity. In time, information such as production rate, queue management, feedstock, equipment, and pallet status can be easily accessed by operators and managers at any time during the production process, confirming the MES (manufacture execution system) efficiency. The low-cost hardware and software used in this work showed its feasibility. The DT created represents the initial step towards designing a metaverse solution for the manufacturing unit in question, which should operate in the near future as a smart and autonomous factory model.

8 June 2019 in Wireless Networks
Verified
Journal Article
Closed access
PDF file
RMRenato Elias Nunes Moraes
Renato Elias Nunes Moraes
WRWelber W. F. dos Reis
Welber W. F. dos Reis
HRHelder R. O. Rocha
Helder R. O. Rocha
DCDaniel J. C. Coura
Daniel J. C. Coura

1 June 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
ÁLÁlvaro Lopes
Álvaro Lopes
HRHelder Roberto de Oliveira Rocha
Helder Roberto de Oliveira Rocha
MJMarcos Wagner Jesus Servare Junior
Marcos Wagner Jesus Servare Junior
RMRenato Elias Nunes Moraes
Renato Elias Nunes Moraes
JSJair Adriano Lima Silva
Jair Adriano Lima Silva
José Leandro SallesJosé Leandro Salles
José Leandro Salles
Stockyard–port planning is a complex combinatorial problem that has been studied primarily through simulation or optimization techniques. However, due to its classification as non-deterministic polynomial-time hard (NP-hard), the generation of optimal or near-optimal solutions in real time requires optimization techniques based on heuristics or metaheuristics. This paper proposes a deterministic simulation and a meta-heuristic algorithm to address the stockyard–port planning problem, with the aim of reducing the time that ships spend in berths. The proposed algorithm is based on the ore handling operations in a real stockyard–port terminal, considering the interaction of large physical equipment and information about the production processes. The stockyard–port system is represented by a graph in order to define ship priorities for planning and generation of an initial solution through a deterministic simulation. Subsequently, the Variable Neighborhood Descent (VND) meta-heuristic is used to improve the initial solution. The convergence time of VND ranged from 1 to 190 s, with the total number of ships served in the berths varying from 10 to 1000 units, and the number of stockyards and berths varying from 11 to 15 and 3 to 5, respectively. Simulation results demonstrate the efficiency of the proposed algorithm in determining the best allocation of stockpiles, berths, car-dumpers, and conveyor belts. The results also show that increasing the number of conveyor belts is an important strategy that decreases environmental impacts due to exposure of the raw material to the atmosphere, while also increasing the stockyard–port productivity. This positive impact is greater when the number yards and ship berths increases. The proposed algorithm enables real-time decision-making from small and large instances, and its implementation in an iron ore stockyard–port that uses Industry 4.0 principles is suitable.

8 July 2016 in International Transactions in Operational Research
Verified
Journal Article
Closed access
PDF file
RMRenato Elias Nunes Moraes
Renato Elias Nunes Moraes
CRCelso C. Ribeiro
Celso C. Ribeiro
GRGlaydston Mattos Ribeiro
Glaydston Mattos Ribeiro

4 August 2022
Verified
Book Chapter
Closed access
PDF file
ISIsrael Pereira de Souza
Israel Pereira de Souza
MBMaria Claudia Silva Boeres
Maria Claudia Silva Boeres
RMRenato Elias Nunes Moraes
Renato Elias Nunes Moraes
JTJoão Vinicius Corrêa Thompson
João Vinicius Corrêa Thompson