The study aimes at identification of the difficulties in choosing the correct concept of the main building process. The use of a proper BIM design may help the user avoid mistakes and make the building process faster as well as less financial resource intensive. The authors focused on literature review, analysing the difficulties of the BIM design software technology in construction project planning. The biggest flaws in BIM design are inherent in three building process stages: 1) the preparation of a building investment project, and the analysis of the existing situation; 2) the preparation of the building execution technology project; 3) the existing standard processing and information collection in building exploitation period. The analysis shows a persistent need for a deeper BIM design research, to improve information interchange formats that would ensure as much design information saved as possible with ensured feedback. As well as in BIM design, the software packages must be improved by supplementing them with deficient tools or programme codes. After the research of BIM design software, it was determined that architectural, constructional and MEP programs work best interdependently and get analysed the most. These programs work best as they make the least number of mistakes when the model is created in one setting and has many tools. This type of design software data is kept internally, and they are converted into IFC or other information interchange format. Without changing the format, the data is not lost, and this is the reason behind fluent information interchange.
20 January 2025 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
This study investigates the reliability of monodiscipline IFC/BIM models in public construction projects of educational facilities through advanced clash detection and quantitative analysis. Data were collected from BIM models of two kindergartens and a school in Vilnius, Lithuania, representing different design disciplines. A mixed-methods approach was employed to analyse the number, types, and geometric characteristics of detected clashes. The research introduces innovative metrics, such as the Relative Quality Coefficient (RQC), Relative Uncertainty Coefficient (RUC), and Modified Relative Quality Coefficient (MRQC), to assess model quality and reliability quantitatively. The findings reveal a direct relationship between model complexity, clash detection precision, and the number of identified clashes, underscoring the importance of enhanced quality control measures in IFC/BIM models for public procurement. The study concludes that the implementation of these novel metrics can enhance the reliability of IFC/BIM models, thereby optimizing the design and construction process.
3 January 2023 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
This article tackles the problem of rational and effective planning of the entire construction site, including the planning of mechanisms, equipment, warehouse space, temporary buildings, temporary engineering networks, etc. The authors propose the principles of creating a mathematical model to calculate the needs of construction objects, using the photogrammetry model. The problems raised can be solved with the use of BIM in the preparation for construction planning stage. The prototype mathematical model presented in this article addresses these issues: identify current situation, using photogrammetry model, define optimal number and location of construction site objects, avoid conflicts between cranes, detect possible hoisting problem, avoid overload of cranes, and of course construction site planning. Therefore, it becomes possible to perform a multicriteria decision-making analysis. Extensive analysis in the pre-construction stage is often abandoned due to the lack of data on the current situation, difficult calculations of the need for mechanisms, equipment and simply due to the lack of time to analyze all possible rational solutions. The data received from the created mathematical prototype could also be used in further construction stages for planning human and material resources, the project schedule and cost estimate.
27 February 2023 in Bulletin Of The Polish Academy Of Sciences-Technical Sciences
Due to the organization of construction works, one of the most difficult situations is when a building is planned in a heritage or a densely built-up location. Fixing an existing situation manually takes a lot of time and effort and is usually not accurate. For example, it is not always possible to measure the exact spacing between buildings at different levels and to consider all outside elements of an existing building. Improper fixation of the existing situation causes mistakes and collisions in design and the use of inappropriate construction solutions. The development and progress in technologies such as BIM, laser scanning, and photogrammetry broaden the options for supporting the management of construction projects. It is important to have an effective fast collection and processing of useful information for management processes. The purpose of this paper is to analyze and present some aspects of photogrammetry to collect and process information about existing buildings. The methodology of the study is based on the comparison of two alternative approaches, namely photogrammetry and BIM modelling. Case studies present an analysis of the quantity take-offs for selected elements and parts of the buildings based on the two approaches. In this article, the specific use of photogrammetry shows that the error between the detailed BIM model and the photogrammetry model is only 1.02% and the accuracy is 98.98%. Moreover, physical capabilities do not always allow us to measure every desired element in reality. This is followed by a discussion on the usability of photogrammetry.
The main aim of this article is to dynamically evaluate the sustainable development of transportation as an important economic sector in each member state of the European Union. Furthermore, the authors tried to identify underdeveloped spatial areas and indicate related trends in particular countries. To address this research topic, a multivariate-order statistical measure was implemented. The data sources of the study were Eurostat databases. The rankings of the chosen European Union countries for transport sustainability and its individual components (pillars and orders) were obtained for 2016–2019. This allowed the underdeveloped space regions and their individual pillars in the field of transportation sustainability to be identified in an appropriate manner. Then, the total (general) synthetic measures applicable to the entire period of analysis were constructed. It should be noted that the initial set of diagnostic variables and its classification in certain sequences were implemented. Furthermore, the taxonomic method applied with Weber’s multivariate median was first used to dynamically assess aspects of traffic sustainability. Such synthetic methods allow for analysis of the interaction of different areas of complex transportation systems and allow distortions of the diagnostic variables.
1 June 2022 in Engineering Management in Production and Services
Modern construction technologies strongly affect the environment. Therefore, design and building construction should also follow the sustainable development principle. In this case, design and construction work based on the sustainable development principle should aim at creating a safe and healthy living environment, the economical use of natural resources, and the stimulation of economic development to create the welfare for humans and favourable natural conditions. The article proposes a mathematical algorithm as a comprehensive solution for engineering management of the planning construction site, from the calculation of the earthworks to the automated creation of the engineering geological cross-sections. The paper integrates engineering management, mathematical modelling, and BIM technology. The application of the building information model is undoubtedly one of the most advanced technologies used in the engineering management field, whose advantages have been shown by researchers. In the preliminary stage of construction and production management, decisions should be made regarding material and human resources, schedules, and estimates. The main purpose of this article is the optimisation of the excavation. Other issues important to the organisation and management of the construction are the planning of safe work on the construction site, depending on the soil type. Geotechnical sections allow ascertaining the need for additional fortifications and the depth of the fortifications for safe work. The paper describes the principal mathematical model developed by the authors to design a construction site using BIM technologies. It presents the main formulas of a mathematical algorithm aimed at selecting the objects used on the building site and the need for them. It also gives the main principles of engineering management and methods for selecting the mechanisms used on the construction site. Understandably, a specialist’s visit to the construction site will not be avoided, and it is difficult to present the entire current situation only with a review report or photographs. Using a photogrammetric model, the expert has the opportunity not only to visually evaluate the current condition but also to perform measurements (length, width, and volume) directly in the photogrammetric model. Important and new information about the construction site indicates all relevant obstacles, i.e., plants, surrounding constructions, and other objects.