S. M. Masum Ahmed

Mr. S. M. Masum Ahmed

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2020 in Solar Energy
Verified
Journal Article
Closed access
S. M. Masum AhmedS. M. Masum Ahmed
S. M. Masum Ahmed
RARahmatullah Al-Amin
Rahmatullah Al-Amin
SAShakil Ahammed
Shakil Ahammed
FAFoysal Ahmed
Foysal Ahmed
ASAhmed Mortuza Saleque
Ahmed Mortuza Saleque
ARAbdur Rahman
Abdur Rahman

1 June 2022 in Clean Energy
Verified
Journal Article
Open access
PDF file
DMDewan Mahnaaz Mahmud
Dewan Mahnaaz Mahmud
S. M. Masum AhmedS. M. Masum Ahmed
S. M. Masum Ahmed
SHSayeed Hasan
Sayeed Hasan
Mohammad ZeyadMohammad Zeyad
Mohammad Zeyad
Global demand for electricity is growing significantly in developing nations. Renewable energy accounts for barely 3% of total energy consumption in Bangladesh. Sources of renewable energy, e.g. solar, are increasingly being acknowledged as viable supply-side choices for microgrids. This article presents a grid-connected microgrid design based on meteorological data for a local community situated in Mohammadpur, Dhaka. This study presents a feasible design of a system that gives the lowest cost of energy production and emissions that is evaluated using software named Hybrid Optimization Multiple Energy Resources (HOMER Pro). Comparison and assessment of the net present cost, cost of energy, operating cost and environmental emission for five different feasible microgrids are analysed concerning real-time data. Also, a suitable case is sorted out and proposed for the local community for electrification. The proposed case offers a $0.0442/kWh cost of energy, which is ~32% cheaper than the current rate with a 57.5% renewable fraction and a payback period of 16.86 years. People of this local community will have access to considerably more clean energy at a lower price by this study; also this design could sell the excess energy to the grid to avoid frequent electricity outages.

10 August 2023 in Energy Conversion and Management
Verified
Journal Article
Closed access
SHSayeed Hasan
Sayeed Hasan
Mohammad ZeyadMohammad Zeyad
Mohammad Zeyad
S. M. Masum AhmedS. M. Masum Ahmed
S. M. Masum Ahmed
DMDewan Mahnaaz Mahmud
Dewan Mahnaaz Mahmud
SASadik Tasrif Anubhove
Sadik Tasrif Anubhove
EHEftakhar Hossain
Eftakhar Hossain

31 March 2023 in Environmental Progress & Sustainable Energy
Verified
Journal Article
Open access
SHSayeed Hasan
Sayeed Hasan
Mohammad ZeyadMohammad Zeyad
Mohammad Zeyad
S. M. Masum AhmedS. M. Masum Ahmed
S. M. Masum Ahmed
SASadik Tasrif Anubhove
Sadik Tasrif Anubhove
World population growth and increased energy demand are taking a heavy toll on the environment. Aside from developed countries, the adverse effects are far more apparent in third‐world countries, which are also affected by climate change, pollution, and fuel scarcity. One of the primary solutions to this challenge is the implementation of cleaner and more sustainable energy resources. Building scale renewable integration is one of the solutions included in hybrid energy systems. The article aims to design a grid‐tied hybrid energy system for a residential complex in Dhaka, Bangladesh. The design includes several combinations of the photovoltaic system, diesel generator, and battery energy storage system (BESS). The key objectives of the analysis are to minimize system costs, reduce grid dependency, and reduce emissions. Various models were simulated in Hybrid optimization of multiple energy resources (HOMER Pro) to obtain a suitable system with maximum renewable usage. Several systems were compared based on different parameters such as net present cost (NPC), operating cost, cost of energy (COE), and carbon emissions. A grid‐tied system with PV and lithium battery storage was found to be the most suitable system for powering the residential load. From the analysis, the preferred system can reduce COE by 53%, NPC by 26%, and operating costs by 54%. Also, the total emission is reduced by 31%. Aside from being cost‐effective, the proposed system is also convenient and sustainable, with fewer salvageable parts owing to its use of lithium‐based BESS.

26 August 2022 in International Journal of Information Management Data Insights
Verified
Journal Article
Open access
AWAbul Ala Walid
Abul Ala Walid
S. M. Masum AhmedS. M. Masum Ahmed
S. M. Masum Ahmed
MZMohammad Zeyad
Mohammad Zeyad
SGS. M. Saklain Galib
S. M. Saklain Galib
MNMeherun Nesa
Meherun Nesa

2 December 2022 in Urban Climate
Verified
Journal Article
Open access
SRSk Nafiz Rahaman
Sk Nafiz Rahaman
S. M. Masum AhmedS. M. Masum Ahmed
S. M. Masum Ahmed
MZMohammad Zeyad
Mohammad Zeyad
AZAbid Hasan Zim
Abid Hasan Zim