Yong Siang Lee

Dr. Yong Siang Lee

Faculty of Civil Engineering Technology, Universiti Malaysia Pahang, Kuantan, Pahang, Malaysia
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 November 2022 in Buildings
Verified
Journal Article
Open access
PDF file
MOMazen Omer
Mazen Omer
NMN. M. Adeeq Mohd-Ezazee
N. M. Adeeq Mohd-Ezazee
YLYong Siang Lee
Yong Siang Lee
Mohammad Sadra RajabiMohammad Sadra Rajabi
Mohammad Sadra Rajabi
RRRahimi A. Rahman
Rahimi A. Rahman
Building information modeling (BIM) implementation is expanding over time, and collaboration is becoming more critical in construction projects. Leadership characteristics may contribute to or hinder the effectiveness of these collaborations in BIM-based construction projects. However, the current body of knowledge lacks information on the leadership characteristics that can be constructive or destructive for BIM-based construction projects. Therefore, this study aims to determine the constructive and destructive leadership behaviors, skills, styles, and traits in BIM-based construction projects. An explorative qualitative study was conducted by interviewing twenty architecture, engineering, and construction (AEC) professionals. Then, the thematic analysis approach was used to analyze the interview data. The study findings suggest that common constructive leadership behaviors are tolerant and committed. Furthermore, the common constructive leadership trait and style is reliability. On the contrary, the common destructive leadership behavior is intolerant. This study provides the literature with a novel list of constructive and destructive leadership characteristics for BIM-based construction projects. Understanding these characteristics would assist industry professionals and policymakers in increasing the performance of BIM-based construction projects.

10 January 2023 in Infrastructures
Verified
Journal Article
Open access
PDF file
AFAbdelrahman M. Farouk
Abdelrahman M. Farouk
AZAhmad Zhahiruddin Zulhisham
Ahmad Zhahiruddin Zulhisham
YLYong Siang Lee
Yong Siang Lee
Mohammad Sadra RajabiMohammad Sadra Rajabi
Mohammad Sadra Rajabi
RRRahimi A. Rahman
Rahimi A. Rahman
Implementing building information modeling (BIM) in construction projects can provide team members with an effective collaboration process. Therefore, organizations are implementing BIM to acquire the benefits. However, project members still use traditional collaborative approaches due to the lack of trust. Therefore, this study aims to identify the factors, challenges, and strategies of trust in BIM-based construction projects. To achieve this aim, semi-structured interviews were conducted with twenty industry professionals, and thematic analysis was used to analyze the collected data. The results suggest that the factors affecting trust in BIM-based construction projects are knowledge, skills, awareness, behavior, policy, system, cost, and management. Moreover, the challenges to creating trust in BIM-based construction projects are policy, cost, cooperation, system, service, behavior, expertise, and knowledge. Finally, the strategies used to create trust in BIM-based construction projects are management, preparation, capability, cooperation, awareness, individuals, education, and government. In summary, this study provides insights that can help industry practitioners to improve construction projects by reducing unnecessary distrust among team members.

29 July 2024 in PLANNING MALAYSIA
Verified
Journal Article
Open access
PDF file
NANor Helmie Shahreen Mohd Ali
Nor Helmie Shahreen Mohd Ali
YLYong Siang Lee
Yong Siang Lee
AAAhmad Rizal Alias
Ahmad Rizal Alias
RRRahimi A. Rahman
Rahimi A. Rahman
Despite the high demands of infrastructures, circular economy (CE) is among the best solution that seeks holistic sustainability goals through a zero-waste culture and to boost economic growth by investing in eco-innovations, secondary raw materials, recycling processes, and industrial symbiosis. Therefore, this study aims to identify the barriers and countermeasures for integrating the CE concept into design and construction of infrastructure projects in Malaysia. For data collection, an open-ended interview has been carried out with twenty-three (23) respondents of clients, contractors, and consultants. Then, the thematic analysis was performed to analyse the data. The findings suggested that the main barriers of CE integration are consisted of internal and external factors; technical, organisational, economic, political, social and environmental aspects. Then, the countermeasures of CE integration are categorized into the hard and soft strategies; raising the awareness of CE, encouraging stakeholder’s collaboration and creating financial incentives, and investment opportunities. As a result, the outcome of the findings can serve as a guideline for stakeholders to integrate CE concept into design and construction of infrastructure projects in order to achieve sustainability development goals (SDG). Through the outcome of this study, stakeholders will have a new approach and new paradigm, which will be useful for future decision-making on the infrastructure with the CE concept.


2 October 2024 in Journal of Advanced Research in Applied Mechanics
Verified
Journal Article
Open access
PDF file
NANurin Arissa Noor Azmi
Nurin Arissa Noor Azmi
MAMuhammad Fahmi Ariffin
Muhammad Fahmi Ariffin
NYNoor Yahida Yahya
Noor Yahida Yahya
YLYong Siang Lee
Yong Siang Lee
In recent, one of the available energy sources is biogas where it is suitable for necessities of the future with the appropriate application of digestion technology. However, the technology used which is anaerobic digestion (AD) faces some challenges especially for food waste including low biogas productivity due to unstable operation efficiency. In order to overcome this shortcoming, spent coffee ground (SCG) derived biochar is introduced as an additive in AD process to enhance the production. To promote the efficiency of the AD, the optimum condition of biochar dosage, the amount of feedstock and pH value were studied. The experimental findings revealed that 13.528ml/g of biogas yield was achieved under optimum condition of 7g of biochar, 500g of feedstock at pH 7 for 14 days. The characterization analysis of biochar showed that, the carbon content and surface area as well as several functional groups of SCG biochar has led to the enhancement of the biogas production during AD process of food waste. The outcomes shows that the addition of SCG biochar can solve the instability issues of AD process yet increase the production of biogas.

18 January 2024 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
CTCarmen Y. M. Tan
Carmen Y. M. Tan
RRRahimi A. Rahman
Rahimi A. Rahman
YLYong Siang Lee
Yong Siang Lee