Rahimi A. Rahman

Dr. Rahimi A. Rahman

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 July 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Mohammad Sadra RajabiMohammad Sadra Rajabi
Mohammad Sadra Rajabi
ARAfiqah R. Radzi
Afiqah R. Radzi
MRMohammad Rezaeiashtiani
Mohammad Rezaeiashtiani
Alireza FamiliAlireza Famili
Alireza Famili
MRMohammad Emad Rashidi
Mohammad Emad Rashidi
RRRahimi A. Rahman
Rahimi A. Rahman
Building information modeling (BIM) is an emerging process for managing the design, construction, operation, and maintenance of a facility. While BIM has developed in diverse aspects, the lack of organizational BIM capabilities remains a barrier to its implementation across the global architecture, engineering, and construction (AEC) industry. Accordingly, AEC organizations need to understand their organizational BIM capabilities and those of other organizations to realize the benefits of implementing BIM. This study examines the key criteria for assessing organizational BIM capabilities across two countries—Malaysia and Iran. For this purpose, the study compares the assessment criteria for BIM capabilities among the two countries based on the following elements: (1) criticality of the criteria; (2) degree of centrality of the criteria; and (3) underlying groups of the criteria. A systematic literature review of 26 articles and semi-structured interviews with BIM professionals provided nineteen criteria. A total of 121 and 126 BIM professionals evaluated the criticality of the criteria through a survey in Malaysia and Iran. The collected data were analyzed using the contextual disparities test (Mann–Whitney U test, Kruskal–Wallis H test, and rank agreement factor), network analysis, and exploratory factor analysis (EFA). The leading key criteria in both countries are “the company has the necessary infrastructure to implement BIM”, “the company has a good attitude towards new technology”, and “the company understands its expertise”. However, the subsequent key criteria differ between countries. Furthermore, while the level of agreement on the ranking of the criteria is at a neutral level, the Mann–Whitney U test indicates that the level of criticality significantly differs between countries for most criteria. There are also changes in the level of criticality of the criteria between countries. Finally, criteria with a high degree of centrality differ between countries. On the contrary, although the criteria slightly differ between countries, the overarching groups of the criteria are similar (i.e., the criteria are related to organizational BIM capabilities and organizational capabilities). Understanding these criteria can help researchers and industry practitioners develop the optimal tool for assessing organizational BIM capabilities for the local industry.

1 May 2022 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
PMPraveena Munianday
Praveena Munianday
ARAfiqah R. Radzi
Afiqah R. Radzi
MEMuneera Esa
Muneera Esa
RRRahimi A. Rahman
Rahimi A. Rahman
Building information modeling (BIM) is an emerging approach to managing the design, construction, operation, and maintenance of projects. However, the lack of organizational BIM capabilities prevents BIM from being generally adopted across the architecture, engineering, and construction (AEC) industry. Therefore, AEC organizations must develop strategic plans to support BIM implementation and ensure that the anticipated benefits of BIM are realized. This study identifies the underlying factors and strategies related to organizational BIM capabilities and develops a structural equation model to establish their causal relationships. A systematic literature review of 26 articles and semi-structured interviews with BIM practitioners provided 19 factors and 14 strategies. A total of 121 BIM practitioners evaluated the criticality of the factors and strategies through a survey. The collected data were analyzed using the Kruskal–Wallis test, exploratory factor analysis (EFA), and partial least-squares structural equation modeling (PLS-SEM). The factor analysis classified the factors into two groups (organizational BIM capabilities and organizational capabilities) and strategies into three groups (capability requirement, organizational culture, and organizational competitiveness). The structural equation model revealed that organizational culture positively affects both organizational and BIM capabilities. Moreover, organizational competitiveness is shown to positively influence organizational capabilities. These results provide evidence for the development of strategies for implementing BIM. Practitioners may use these strategies to develop strategic plans and prioritize efforts in a more effective manner. With the findings of this research, users will have a better understanding of the relationships between factors and strategies that are associated with organizational BIM capabilities.

4 June 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Hafnidar A. RaniHafnidar A. Rani
Hafnidar A. Rani
AFAbdelrahman M. Farouk
Abdelrahman M. Farouk
K. S. AnandhK. S. Anandh
K. S. Anandh
SASaud Almutairi
Saud Almutairi
RRRahimi A. Rahman
Rahimi A. Rahman
The COVID-19 pandemic has affected the whole world, including India, especially in the construction sector. The study aims to identify, compare, and analyze the critical pandemic impacts (CPI) on construction projects in India. To achieve this, 40 interviews with industry professionals, are followed by a systematic review to identify the CPI. The data collected was used to develop a survey, sent to industry professionals all over India, with a return of 92 valid responses. The data were analyzed using reliability analysis, mean score ranking, overlap analysis, agreement analysis, and correlation analysis. The overall critical pandemic impact includes ‘labor scarcity,’ ‘supply chain disruption,’ ‘decreased construction productivity,’ ‘increased project financing rejection rate,’ and ‘reduced foreign investment in the construction industry.’ The findings could aid authorities and policymakers in taking suitable actions toward solving the current CPI in India. Project managers and owners could consider the current CPI in order to formulate better plans. Overcoming CPI could lead to an economic leap in India.

25 November 2022 in Buildings
Verified
Journal Article
Open access
PDF file
MOMazen Omer
Mazen Omer
NMN. M. Adeeq Mohd-Ezazee
N. M. Adeeq Mohd-Ezazee
YLYong Siang Lee
Yong Siang Lee
Mohammad Sadra RajabiMohammad Sadra Rajabi
Mohammad Sadra Rajabi
RRRahimi A. Rahman
Rahimi A. Rahman
Building information modeling (BIM) implementation is expanding over time, and collaboration is becoming more critical in construction projects. Leadership characteristics may contribute to or hinder the effectiveness of these collaborations in BIM-based construction projects. However, the current body of knowledge lacks information on the leadership characteristics that can be constructive or destructive for BIM-based construction projects. Therefore, this study aims to determine the constructive and destructive leadership behaviors, skills, styles, and traits in BIM-based construction projects. An explorative qualitative study was conducted by interviewing twenty architecture, engineering, and construction (AEC) professionals. Then, the thematic analysis approach was used to analyze the interview data. The study findings suggest that common constructive leadership behaviors are tolerant and committed. Furthermore, the common constructive leadership trait and style is reliability. On the contrary, the common destructive leadership behavior is intolerant. This study provides the literature with a novel list of constructive and destructive leadership characteristics for BIM-based construction projects. Understanding these characteristics would assist industry professionals and policymakers in increasing the performance of BIM-based construction projects.

28 September 2021 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
AFAbdelrahman M. Farouk
Abdelrahman M. Farouk
RRRahimi A. Rahman
Rahimi A. Rahman
NRNOOR SURAYA ROMALI
NOOR SURAYA ROMALI
Purpose: Sustainability involves ensuring that sufficient resources are available for current and future generations. Non-revenue water (NRW) creates a barrier to sustainability through energy and water loss. However, a comprehensive overview of NRW reduction strategies is lacking. This study reviews the existing literature to identify available strategies for reducing NRW and its components and discusses their merits. Design/methodology/approach: A systematic literature review was conducted to identify and analyze different strategies for reducing NRW. The initial search identified 158 articles, with 41 of these deemed suitably relevant following further examination. Finally, 14 NRW reduction strategies were identified from the selected articles. Findings: The identified NRW reduction strategies were grouped into strategies for reducing (1) apparent losses (AL), (2) real losses (RL) and (3) water losses, with the latter involving the combination of AL and RL. The strategies adopted most frequently are “prevent water leakage” and “control water pressure.” In addition, water distribution network (WDN) rehabilitation has additional benefits over other RL reduction strategies, including saving water and energy, increasing hydraulic performance and enhancing reliability. Finally, utilizing decision support systems is the only strategy capable of reducing multiple NRW categories. Originality/value: This review provides insights into the overall NRW problem and the strategies best equipped to address it. Authorities can use these findings to develop case-specific NRW reduction action plans that save water and energy, while providing other economic benefits. In addition, NRW reduction can improve WDN reliability.

10 January 2023 in Infrastructures
Verified
Journal Article
Open access
PDF file
AFAbdelrahman M. Farouk
Abdelrahman M. Farouk
AZAhmad Zhahiruddin Zulhisham
Ahmad Zhahiruddin Zulhisham
YLYong Siang Lee
Yong Siang Lee
Mohammad Sadra RajabiMohammad Sadra Rajabi
Mohammad Sadra Rajabi
RRRahimi A. Rahman
Rahimi A. Rahman
Implementing building information modeling (BIM) in construction projects can provide team members with an effective collaboration process. Therefore, organizations are implementing BIM to acquire the benefits. However, project members still use traditional collaborative approaches due to the lack of trust. Therefore, this study aims to identify the factors, challenges, and strategies of trust in BIM-based construction projects. To achieve this aim, semi-structured interviews were conducted with twenty industry professionals, and thematic analysis was used to analyze the collected data. The results suggest that the factors affecting trust in BIM-based construction projects are knowledge, skills, awareness, behavior, policy, system, cost, and management. Moreover, the challenges to creating trust in BIM-based construction projects are policy, cost, cooperation, system, service, behavior, expertise, and knowledge. Finally, the strategies used to create trust in BIM-based construction projects are management, preparation, capability, cooperation, awareness, individuals, education, and government. In summary, this study provides insights that can help industry practitioners to improve construction projects by reducing unnecessary distrust among team members.