The paper presents a review of testing methods and a classification of strategies and tools in terms of technologies and techniques applied to the monitoring of tunnels. In particular, the topic is contextualized through a brief introduction in Chapter 1, followed by defect taxonomy and degradation mechanisms in Chapters 2 and 3, respectively. Chapters 4 and 5 are related to monitoring strategies and technologies. The former consists of purpose‐based categorization of monitoring policies, while the latter consists of classification of monitoring methods including nondestructive and semidestructive techniques as well as of classification of various types of sensors also based on the physical or chemical quantity measured. General rules of implementation and operation of tunnel monitoring systems are presented taking into account international expert knowledge as well as contemporary practical experience in Austria. Considered issues are related to the fib Model Code 2020 (MC2020) focused on evaluation of structural performance assisted by monitoring and testing. Chapter 6 presents challenges related to the monitoring implementation and operation. Chapter 7 discusses about monitoring characteristics in new tunnel, including data acquisition‐transmission and specific monitoring techniques. Chapter 8 instead treats a particular topic related to considerations related to monitoring characteristics of existing tunnel under investigation. Concluding remarks and references finally close the paper.
In the construction industry, especially in tunneling or large-scale earthworks projects, huge quantities of excavation material are generated as a by-product. Although at first glance such material is undesirable, in many cases this material, if suitably treated and processed, can be recycled and reused on the construction site and does not necessarily need to be removed and deposited as waste at a landfill. In the simplest case, the material can be used as filling material with the least demanding requirements with regard to rock quality. Material of better quality often can be recycled as aggregate and be used as a substitute for conventional mineral aggregates. This approach generates numerous benefits regarding the costs for material procurement, storage and transport. In addition, reduction in environmental impact and demand for landfill volume can be achieved. The challenge lies in the fact that excavation material is not a standard aggregate in terms of geometric, physical and chemical characteristics and is subject to quality deviations during tunnel driving, mainly depending on the varying geology and applied excavation method. Therefore, preliminary research and experimental testing as well as specific evaluation and continuous examination of the rock quality during tunnel driving is necessary as well as ongoing adjustment of the rock processing plant to finally accomplish a high-quality level of recycled aggregates. This article illustrates the material investigations and treatment processes for the specific example of the Brenner Base Tunnel, the longest underground railway line in the world that is currently under construction. There, material recycling has already been successfully implemented.
Clinker production is very energy-intensive and responsible for releasing climate-relevant carbon dioxide (CO2) into the atmosphere, and the exploitation of aggregate for concrete results in a reduction in natural resources. This contrasts with infrastructure development, surging urbanization, and the demand for construction materials with increasing requirements in terms of durability and strength. A possible answer to this is eco-efficient, high-performance concrete. This article illustrates basic material investigations to both, using eco-friendly cement and recycled aggregate from tunneling to produce structural concrete and inner shell concrete, showing high impermeability and durability. By replacing energy- and CO2-intensive cement types by slag-pozzolanic cement (CEM V) and using recycled aggregate, a significant contribution to environmental sustainability can be provided while still meeting the material requirements to achieve a service lifetime for the tunnel structure of up to 200 years. Results of this research show that alternative cements (CEM V), as well as processed tunnel spoil, indicate good applicability in terms of their properties. Despite the substitution of conventional clinker and conventional aggregate, the concrete shows good workability and promising durability in conjunction with adequate concrete strengths.
29 August 2023 in Bulletin of Engineering Geology and the Environment
Even after decades of intensive research, assessing rock slope stability remains a challenge. One reason for this is the spatial variability of rock bridges (RBs) related to non-persistent, pre-existing geological structures, especially as the detection of RBs is generally limited to the post-failure period. Thus, the identification and classification of RBs and their inclusion in numerical studies are demanding, yet essential, since even small quantities of RBs can be decisive for rock slope stability. In our study, we demonstrate how brittle RB failure and pre-existing geological structures control the mechanisms of a polyphase rock slope failure. Therefore, we present a case study in the Austrian Alps, where three rock falls with a failure volume of 30,000 m3 occurred in 2019. Based on detailed process reconstructions, high-resolution terrain models, and comprehensive geological and rock mechanical investigations, we derived high-quality input for our distinct element model (DEM). By applying asymmetric Voronoi tessellation in the DEM, we modelled the coalescence of pre-existing geological structures by brittle RB failure. As a result, we identified toppling as the predominant failure mechanism at the study site. Distinctive geological structures decisively affected the failure mechanism. However, the toppling failure was only reproducible by incorporating RBs in the DEM in their pre-failure position. Finally, we found that joint persistence, and consequently the presence of potential RBs, controls which initial rock fall failure mechanism was developed. In conclusion, we state that the initial toppling failure of the Hüttschlag rock falls is controlled by non-persistent geological structures in interplay with RBs.