David John Greenwood

Prof. Dr. David John Greenwood

Northumbria University, Newcastle upon Tyne, UK
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 January 2018 in Construction Innovation
Verified
Journal Article
Closed access
MZMohamed Zaher
Mohamed Zaher
David John GreenwoodDavid John Greenwood
David John Greenwood
Mohamed MarzoukMohamed Marzouk
Mohamed Marzouk
Purpose: The purpose of this paper is to facilitate the process of monitoring construction projects. Classic practice for construction progress tracking relies on paper reports, which entails a serious amount of manual data collection as well as the effort of imagining the actual progress from the paperwork. Design/methodology/approach: This paper presents a new methodology for monitoring construction progress using smartphones. This is done by proposing a new system consisting of a newly-developed application named “BIM-U” and a mobile augmented reality (AR) channel named “BIM-Phase”. “BIM-U” is an Android application that allows the end-user to update the progress of activities onsite. These data are used to update the project’s 4D model enhanced with different cost parameters such as earned value, actual cost and planned value. The “BIM-Phase” application is a mobile AR channel that is used during construction phase through implementing a 4D “as-planned” phased model integrated with an augmented video showing real or planned progress. Findings: The results from the project are then analysed and assessed to anticipate the potential of these and similar techniques for tracking time and cost on construction projects. Originality/value: The proposed system through “BIM-U” and “BIM Phase” exploits the potential of mobile applications and AR in construction through the use of handheld mobile devices to offer new possibilities for measuring and monitoring work progress using building information modelling.

20 November 2017 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
Barry GledsonBarry Gledson
Barry Gledson
David John GreenwoodDavid John Greenwood
David John Greenwood
Purpose: British construction industry KPI data collected over recent years shows a trend in projects exceeding their time schedules. In 2013, the UK Government set a target for projects timeframes to reduce by 50 per cent. Proposed interventions included more rapid project delivery processes, and consistent improvements to construction delivery predictions, deployed within the framework of 4D Building Information Modelling (BIM). The purpose of this paper is to use Rogers’ Innovation Diffusion theory as a basis to investigate how this adoption has taken place. Design/methodology/approach: In total, 97 construction planning practitioners were surveyed to measure 4D BIM innovation take-up over time. Classic innovation diffusion research methods were adopted. Findings: Results indicated an increasing rate of 4D BIM adoption and reveal a time lag between awareness and first use that is characteristic of this type of innovation. Research limitations/implications: Use of a non-probability sampling strategy prevents the results being generalisable to the wider construction population. Future research directions and methods are suggested, including qualitative investigations into decision-making processes around 4D BIM, and case studies exploring the consequences of 4D BIM adoption. Practical implications: Recommendations of how to facilitate the adoption of 4D BIM innovation are proposed, which identify the critical aspects of system compatibility and safe trialling of the innovation. Originality/value: This paper reinforces 4D BIM as an innovation and records its actual UK industry adoption rate using an accepted diffusion research method. By focusing on UK industry-wide diffusion the work also stands apart from more typical research efforts that limit innovation diffusion exploration to individual organisations.

1 August 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Omar DoukariOmar Doukari
Omar Doukari
ESEl Hadji Boubacar SECK
El Hadji Boubacar SECK
David John GreenwoodDavid John Greenwood
David John Greenwood
Building Information Modelling (BIM) is now a globally recognised phenomenon, though its adoption remains inconsistent and variable between and within the construction sectors of different countries. BIM technology has enabled a wide range of functional applications, one of which, ‘4D BIM’, involves linking the tasks in a project’s construction schedule to its object-orientated 3D model to improve the logistical decision making and delivery of the project. Ideally, this can be automatically generated but in reality, this is not currently possible, and the process requires considerable manual effort. The level of maturity and expertise in the use of BIM amongst the project participants still varies considerably; adding further obstacles to the ability to derive full benefits from BIM. Reflecting these challenges, two case studies are presented in this paper. The first describes a predominantly manual approach that was used to ameliorate the implementation of 4D BIM on a project in Paris. In fact, there is scope for automating the process: a combination of BIM and Artificial Intelligence (AI) could exploit newly-available data that are increasingly obtainable from smart devices or IoT sensors. A prerequisite for doing so is the development of dedicated ontologies that enable the formalisation of the domain knowledge that is relevant to a particular project typology. Perhaps the most challenging example of this is the case of renovation projects. In the second case study, part of a large European research project, the authors propose such an ontology and demonstrate its application by developing a digital tool for application within the context of deep renovation projects.

18 August 2022 in Health & Place
Verified
Journal Article
Open access
JXJie Xiao
Jie Xiao
Jianfeng ZhaoJianfeng Zhao
Jianfeng Zhao
ZLZhiwen Luo
Zhiwen Luo
FLFang Liu
Fang Liu
David John GreenwoodDavid John Greenwood
David John Greenwood
Tackling mental health has become a priority for governments around the world because it influences not only individuals but also the whole society. As people spend a majority of their time (i.e., around 90%) in buildings, it is pivotal to understand the relationship between built environment and mental health, particularly during COVID-19 when people have experienced recurrent local and national lockdowns. Despite the demonstration by previous research that the design of the built environment can affect mental health, it is not clear if the same influence pattern remains when a ‘black swan’ event (e.g., COVID-19) occurs. To this end, we performed logistic regression and hierarchical regression analyses to examine the relationship between built environment and mental health utilising a data sample from the United Kingdom (UK) residents during the COVID-19 lockdown while considering their social demographics. Our results show that compared with depression and anxiety, people were more likely to feel stressed during the lockdown period. Furthermore, general house type, home workspace, and neighbourhood environment and amenity were identified to have significantly contributed to their mental health status. With the ensuing implications, this study represents one of the first to inform policymakers and built environment design professionals of how built environment should be designed to accommodate features that could mitigate mental health problems in any future crisis. As such, it contributes to the body of knowledge of built environment planning by considering mental health during the COVID-19 lockdown.

12 May 2020 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
JCJames Charlton
James Charlton
KKKenneth Kelly
Kenneth Kelly
David John GreenwoodDavid John Greenwood
David John Greenwood
LMLeo Moreton
Leo Moreton
Purpose: The adoption of building information modelling (BIM) in managing built heritage is an exciting prospect, but one that presents complexities additional to those of modern buildings. If challenges can be identified and overcome, the adoption of historic BIM (HBIM) could offer efficiencies in how heritage buildings are managed.Design/methodology/approach: Using Durham Cathedral as a case study, we present the workflows applied to create an asset information model to improve the way this unique UNESCO World Heritage Site is managed, and in doing so, set out the challenges and complexities in achieving an HBIM solution.Findings: This study identifies the need for a better understanding of the distinct needs and context for managing historic assets, and the need for heritage information requirements (HIR) that reflect this.Originality/value: This study presents first-hand findings based on a unique application of BIM at Durham Cathedral, a UNESCO World Heritage Site. The study provides a better understanding of the challenges and drivers of HBIM adoption across the heritage sector and underlines the need for information requirements that are unique to historical buildings/assets to deliver a coherent and relevant HBIM approach.

27 May 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
TLTheo Lynn
Theo Lynn
Pierangelo RosatiPierangelo Rosati
Pierangelo Rosati
AEAntonia Egli
Antonia Egli
Stylianos KrinidisStylianos Krinidis
Stylianos Krinidis
KAKomninos Angelakoglou
Komninos Angelakoglou
Omar DoukariOmar Doukari
Omar Doukari
The building stock accounts for a significant portion of worldwide energy consumption and greenhouse gas emissions. While the majority of the existing building stock has poor energy performance, deep renovation efforts are stymied by a wide range of human, technological, organisational and external environment factors across the value chain. A key challenge is integrating appropriate human resources, materials, fabrication, information and automation systems and knowledge management in a proper manner to achieve the required outcomes and meet the relevant regulatory standards, while satisfying a wide range of stakeholders with differing, often conflicting, motivations. RINNO is a Horizon 2020 project that aims to deliver a set of processes that, when working together, provide a system, repository, marketplace and enabling workflow process for managing deep renovation projects from inception to implementation. This paper presents a roadmap for an open renovation platform for managing and delivering deep renovation projects for residential buildings based on seven design principles. We illustrate a preliminary stepwise framework for applying the platform across the full-lifecycle of a deep renovation project. Based on this work, RINNO will develop a new open renovation software platform that will be implemented and evaluated at four pilot sites with varying construction, regulatory, market and climate contexts.