kyong min ro

Ms. kyong min ro

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2023 in Materials
Verified
Journal Article
Open access
PDF file
KRkyong min ro
kyong min ro
MKMin Sook Kim
Min Sook Kim
YLYoung Hak Lee
Young Hak Lee
The concrete jacketing method for retrofitting old reinforced concrete (RC) columns should secure confinement and seismic performance under torsion as well as unidirectional later loads. In a previous study, a hybrid concrete jacketing method was proposed using steel wire mesh (SWM), steel grid reinforcement (SGR), which can replace reinforcement of existing concrete jacketing method, and using steel fiber non-shrinkage mortar (SFNM). These details can simplify the retrofitting process of the existing concrete jacketing method, and seismic performance was evaluated by conducting a cyclic loading test under unidirectional loading. In this paper, the torsional behavior of RC columns retrofitted with the hybrid concrete jacketing method was investigated. Four specimens were fabricated and conducted cyclic loading tests under two types of loading schemes, unidirectional and bidirectional loading, to examine the effect of the loading path. The strength and energy dissipation capacity of retrofitted columns with hybrid concrete jackets increased approximately eight times compared to the old RC columns under torsional loading. Therefore, the hybrid concrete jacketing method can improve torsional resistance.

27 April 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KRkyong min ro
kyong min ro
MKMin Sook Kim
Min Sook Kim
YLYoung Hak Lee
Young Hak Lee
This paper evaluated the validity of a design method for anchorage zones in post-tensioned concrete members using Grade 2400 strands from American Concrete Institute (ACI) Building Code, ACI 318-19 and Association of State Highway and Transportation Officials (AASHTO) codes. For this purpose, the behaviors of anchorage zones in ten specimens were investigated and compared with ACI 318-19 and AASHTO codes, considering the jacking force and ultimate flexural load. The anchor shape, number of strands, and reinforcement details of the anchorage zone were considered as variables. The test results showed that ACI 318-19 and AASHTO codes could not predict where the maximum bursting force would occur. In addition, they calculated bursting force by summation of the pre-stressing forces from the individual strands, whereas the experimental results were not linearly proportional to the number of strands. The ACI 318-19 and AASHTO standards were inadequate to calculate bearing force of post-tensioned members using high-strength strands. Furthermore, additional stress in the anchorage zone occurred as the flexural load increased, which may have been caused by a failure in the anchorage zone. The experimental results indicated that the method used to predict stress and design of anchorage zone in current codes should be improved to consider stress distribution and additional stress in post-tensioned concrete members using high-strength strands.

12 October 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KRkyong min ro
kyong min ro
MKMin Sook Kim
Min Sook Kim
YLYoung Hak Lee
Young Hak Lee
Buildings constructed with non-seismic details are at risk of damage and collapse when an earthquake occurs due to a lack of strength, stiffness, and ductility. For reinforced concrete (RC) moment-resisting frames, seismic retrofitting methods that can enhance strength or ductility should be applied. However, such strategies have many disadvantages related to constructability, serviceability, securing integrity, and cost. In this paper, a welded concrete-filled steel tube (WCFST) system was examined in order to resolve the problems of the existing seismic retrofitting methods for RC moment-resisting frames. To evaluate the seismic performance of the proposed system, two specimens, one with non-seismic details and another reinforced with a WCFST seismic system, were manufactured for the cyclic loading tests. As a result of the experiments, the specimen retrofitted with the WCFST system showed maximum load, effective stiffness, and energy dissipation capacity values approximately 3, 2, and 2.5 times greater, respectively, than those obtained from the existing reinforced concrete frame specimen. The experimental results indicate that the proposed WCFST system is expected to be effective at improving the seismic performance by enhancing both the strength of the existing reinforced concrete frame structures and the dissipation of the seismic energy.

26 April 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KRkyong min ro
kyong min ro
MKMin Sook Kim
Min Sook Kim
CCChang-Geun Cho
Chang-Geun Cho
YLYoung Hak Lee
Young Hak Lee
Recently, interest in using precast concrete (PC) modules has increased due to their better seismic performance than steel modules. However, they must be joined by additional elements to ensure structural integration between the modules. The essential aim of the precast concrete module is to ensure structural performance with appropriate connection methods. However, the technical problem of connecting PC modules still needs to be improved. This study proposed a PC modular beam system for improved structural and splicing performance, and simple construction. This modular system consisted of modules with steel plates inserted to improve integrity of modules, ease of construction, and low cost. The structural performance of the proposed PC modular beam system was evaluated by flexural test on one reinforced concrete (RC) beam specimen consisting of a monolithic beam, and two PC specimens with the proposed modular system. The results demonstrated that the proposed PC modular beam system achieved approximately 80% of the structural performance compared to the monolithic specimen, with approximately 1.3-fold greater ductility.

19 December 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KRkyong min ro
kyong min ro
MKMin Sook Kim
Min Sook Kim
CCChang-Geun Cho
Chang-Geun Cho
YLYoung Hak Lee
Young Hak Lee
In modular structures, prefabricated modular units are joined at the construction site. Modular structures must ensure splicing performance by connecting modular units sufficiently. The bolted connection using steel plates may suffer from alignment issues and corrosion problems. In a precast concrete (PC) modular system, there is difficulty grouting the sleeves when splicing reinforcing bars. This study proposed a PC modular beam using a bolted connecting plate to deal with issues in typical steel modules and PC modules. The structural performance was evaluated by flexural and shear tests on two monolithic beams and two proposed PC specimens. The test results showed that the structural performance of the PC modular specimen was 88% of that of the monolithic reinforced concrete (RC) beam specimen and 102% of the strength calculated by ACI 318-19. Therefore, the proposed PC modular system using bolted connecting plates can solve the problems observed in typical steel and PC modules and improve the structural performance.

21 November 2023 in Structures
Verified
Journal Article
Open access
KRkyong min ro
kyong min ro
MKMin Sook Kim
Min Sook Kim
YLYoung Hak Lee
Young Hak Lee