Emad Abdelsalam

Dr. Emad Abdelsalam

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2021 in Science of The Total Environment
Verified
Journal Article
Closed access
Muhammad TawalbehMuhammad Tawalbeh
Muhammad Tawalbeh
Amani Al-OthmanAmani Al-Othman
Amani Al-Othman
Feras KafiahFeras Kafiah
Feras Kafiah
EAEmad Abdelsalam
Emad Abdelsalam
Fares ALMOMANIFares ALMOMANI
Fares ALMOMANI
Malek AlkasrawiMalek Alkasrawi
Malek Alkasrawi

7 October 2020 in International Journal of Energy Research
Verified
Journal Article
Closed access
PDF file
EAEmad Abdelsalam
Emad Abdelsalam
FKFeras Kafiah
Feras Kafiah
Muhammad TawalbehMuhammad Tawalbeh
Muhammad Tawalbeh
Fares ALMOMANIFares ALMOMANI
Fares ALMOMANI
AAAhmad Azzam
Ahmad Azzam
Malek AlkasrawiMalek Alkasrawi
Malek Alkasrawi

1 June 2020 in Energies
Verified
Journal Article
Open access
PDF file
EAEmad Abdelsalam
Emad Abdelsalam
Feras KafiahFeras Kafiah
Feras Kafiah
Malek AlkasrawiMalek Alkasrawi
Malek Alkasrawi
IAIsmael Al-Hinti
Ismael Al-Hinti
AAAhmad Azzam
Ahmad Azzam
This work provides technical and economic feasibility of installing a solar chimney power-water distillation plant (SCPWDP) in the port of Aqaba in Jordan. A mathematical model for the SCPWDP has been developed and validated. A full year of weather conditions data has been processed, where water and electricity productions have been estimated. The results show that the SCPWDP can produce 481,440 kWh of electricity and 123,753 ton of distilled water yearly simultaneously. The economic analysis shows that the levelized cost of energy (LCOE) for the SCPWDP is $1.86/kWh. The cost estimate seems reasonable once compared with other studies. However, from economical point of view the LCOE of SCPWDP requires a further decrease in order to make it economically feasible. The sensitivity analysis shows that increasing the chimney height of the SCPWDP would increase the production of electricity, and hence, decreases the LCOE. However, increasing the chimney height would have a marginal improvement since it increases both capital and operation expenditures.

29 November 2021 in Processes
Verified
Journal Article
Open access
PDF file
Malek AlkasrawiMalek Alkasrawi
Malek Alkasrawi
EAEmad Abdelsalam
Emad Abdelsalam
HAHamza Alnawafah
Hamza Alnawafah
Fares ALMOMANIFares ALMOMANI
Fares ALMOMANI
Muhammad TawalbehMuhammad Tawalbeh
Muhammad Tawalbeh
AMAya Mousa
Aya Mousa
This work explores the technical possibilities of increasing the efficiency of a standard solar chimney power plant (SCPP) by integrating it with photovoltaic (PV) panels. The integration is possible by using the collector circumference to install the PV collectors, which provide a heat sink, allow for the better harvesting of the solar radiation, and increase energy production. The new design led to an increase in the annual electricity production from 380 to 494 MWh and water production from 278 to 326 k tons/year compared with the standard SCPP, marking an increase of 30% and 17%, respectively. The results also show that the integration reduced the greenhouse gas emissions (GHG), the localized cost of energy, and the capital cost of investment by 30%, 36%, and 20%, respectively. The proposed design supports the sustainable replacement of the existing desalination plants with zero operational costs and an excellent reduction in greenhouse gas emissions.

2 November 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
EAEmad Abdelsalam
Emad Abdelsalam
Fares ALMOMANIFares ALMOMANI
Fares ALMOMANI
Feras KafiahFeras Kafiah
Feras Kafiah
EAEyad Almaitta
Eyad Almaitta
Muhammad TawalbehMuhammad Tawalbeh
Muhammad Tawalbeh
Malek AlkasrawiMalek Alkasrawi
Malek Alkasrawi
This study presents a case study of a novel hybrid solar chimney power plant (HSCPP) design’s performance in the city of Doha, Qatar. The HSCPP construction is similar to the traditional solar chimney power plant (SCPP) but with the addition of water sprinklers installed at the top of the chimney. This allowed the solar chimney (SC) to operate as a cooling tower (CT) during the nighttime and operate as an SC during the daytime, hence providing a continuous 24-h operation. The results showed that the HSCPP produced ~633 MWh of electrical energy per year, compared to ~380 MWh of energy produced by the traditional SCPP. The results also showed that the HSCPP was able to produce 139,000 tons/year of freshwater, compared to 90,000 tons/year produced by the traditional SCPP. The estimated CO2 emission reduction (~600 tons/year) from the HSCPP is twice that of the traditional SCPP (~300 tons/year). The results clearly show that the HSCPP outperformed the traditional SCPP.

12 September 2023 in International Journal of Hydrogen Energy
Verified
Journal Article
Closed access
EAEmad Abdelsalam
Emad Abdelsalam
Fares ALMOMANIFares ALMOMANI
Fares ALMOMANI
FKFeras Kafiah
Feras Kafiah
HAHamza Alnawafah
Hamza Alnawafah
Adel JuaidiAdel Juaidi
Adel Juaidi
RARamez Abdallah
Ramez Abdallah