Siavash H. Khajavi

Dr. Siavash H. Khajavi

Department of Industrial Engineering and Management, Aalto University, 02150 Espoo, Finland
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2014 in Computers in Industry
Verified
Journal Article
Closed access
SKSiavash H. Khajavi
Siavash H. Khajavi
JPJouni Partanen
Jouni Partanen
JHJan Holmström
Jan Holmström

9 October 2019 in IEEE Access
Verified
Journal Article
Open access
SKSiavash H. Khajavi
Siavash H. Khajavi
NMNaser Hossein Motlagh
Naser Hossein Motlagh
AJAlireza Jaribion
Alireza Jaribion
LWLiss C. Werner
Liss C. Werner
JHJan Holmström
Jan Holmström

18 January 2016 in Operations Management Research
Verified
Journal Article
Closed access
PDF file
JHJan Holmström
Jan Holmström
MHMatthias Holweg
Matthias Holweg
SKSiavash H. Khajavi
Siavash H. Khajavi
JPJouni Partanen
Jouni Partanen

9 June 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Mika SalmiMika Salmi
Mika Salmi
Jan Sher AkmalJan Sher Akmal
Jan Sher Akmal
Eujin PeiEujin Pei
Eujin Pei
JWJan Wolff
Jan Wolff
AJAlireza Jaribion
Alireza Jaribion
SKSiavash H. Khajavi
Siavash H. Khajavi
The COVID-19 pandemic has caused a surge of demand for medical supplies and spare parts, which has put pressure on the manufacturing sector. As a result, 3D printing communities and companies are currently operating to ease the breakdown in the medical supply chain. If no parts are available, 3D printing can potentially be used to produce time-critical parts on demand such as nasal swabs, face shields, respirators, and spares for ventilators. A structured search using online sources and feedback from key experts in the 3D printing area was applied to highlight critical issues and to suggest potential solutions. The prescribed outcomes were estimated in terms of cost and productivity at a small and large scale. This study analyzes the number and costs of parts that can be manufactured with a single machine within 24 h. It extrapolates this potential with the number of identical 3D printers in the world to estimate the global potential that can help practitioners, frontline workers, and those most vulnerable during the pandemic. It also proposes alternative 3D printing processes and materials that can be applicable. This new unregulated supply chain has also opened new questions concerning medical certification and Intellectual property rights (IPR). There is also a pressing need to develop new standards for 3D printing of medical parts for the current pandemic, and to ensure better national resilience.

12 October 2018 in Rapid Prototyping Journal
Verified
Journal Article
Closed access
SKSiavash H. Khajavi
Siavash H. Khajavi
JHJan Holmström
Jan Holmström
JPJouni Partanen
Jouni Partanen
Purpose: Innovative startups have begun a trend using laser sintering (LS) technology patents expiration, namely, by introducing LS additive manufacturing (AM) machines that can overcome utilization barriers, such as the costliness of machines and productivity limitation. The recent rise of this trend has led the authors to investigate this new class of machines in novel settings, including hub configuration. There are various supply chain configurations to supply spare parts in industrial operations. This paper aims to explore the promise of a production configuration that combines the benefits of centralized production with the flexibility of local manufacturing without the huge costs related to it. Design/methodology/approach: This study quantitatively examines the feasibility of different AM-enabled spare parts supply chain configurations. Using cost data extracted from a case study, three scenarios per AM machine technology are modeled and compared. Findings: Results suggest that hub production configuration depending on the utilized AM machines can provide economic efficiency and effectiveness to reduce equipment downtime. While previous studies have suggested the need for AM machines with efficiency for single part production for a distributed supply chain, the findings in this research illustrate the positive relationship between multi-part production capability and the feasibility of a hub manufacturing configuration establishment. Originality/value: This study explores the promise of a production configuration that combines the benefits of centralized production with the flexibility of local manufacturing without the huge costs related to it. Although the existing body of knowledge contains research on production decentralization, research on various levels of decentralization is lacking. Using a real-world case study, this study aims to compare the feasibility of different levels of decentralization for AM-enabled spare parts supply chains.

24 April 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SKSiavash H. Khajavi
Siavash H. Khajavi
MTMüge Tetik
Müge Tetik
AMAshish Mohite
Ashish Mohite
APAntti Peltokorpi
Antti Peltokorpi
MLMingyang Li
Mingyang Li
JHJan Holmström
Jan Holmström
The construction industry is facing increasing pressure to improve productivity and decrease its environmental impact. Additive manufacturing (AM) technologies, especially three-dimensional concrete printing (3DCP) technology, have provided many benefits for construction. However, holistic comparative studies of the competitiveness of 3DCP and conventional methods, from cost and time perspectives, are lacking. Choosing between the methods is difficult for practitioners. In this study, we investigated the current state of 3DCP in the construction industry using seven distinct scenarios. Our analysis was performed to illustrate the impact of design and supply chain configurations on performance. The results prove the notable competitiveness of 3DCP. In contrast to the conventional construction method, the more complex round design had a positive impact on the cost and process time in 3DCP scenarios. Additionally, we show that on-site 3DCP using a robotic arm was more cost-effective than off-site 3DCP.