In South Korea, Honam High-Speed Railway has a relatively large residual settlement issue and high fines content has been pointed out as one of the causes. Design guidelines regulate not to use soils containing fines content higher than 25%. However, there is no background information on the effect of fines content on settlement. Therefore, this paper aims to investigate compressional behavior according to fines content using sand and kaolinite. Oedometer test results showed that the compression index is lowest with fines content of 15% to 20% at which the mixture produced maximum density. The optimum fines content for inducing low settlement would be 15% to 20% for the sand–kaolinite mixture. Transition fines content (TFC), which shows sand-like to claylike behavior, was observed to have between 21% and 26% of fines content. Critical fines content (fcrit) where a minimum void ratio occurs was estimated as 21.67%. These behavioral changes appear when fines content is greater than the optimum fines content. SEM also shows that the kaolinite particles were overlapped, creating flat surfaces with a fines content higher than 30%, and showing clay-like behavior. Based on the analysis results, engineers can simply identify the behavior of embankment materials to ensure optimum fines content and consequently minimize long-term settlement potential.
The condition of the ballast is a critical factor affecting the riding quality and the performance of a track. Fouled ballast can accelerate track irregularities, which results in frequent ballast maintenance requirements. Severe fouling of the ballast can lead to track instability, an uncomfortable ride and, in the worst case, a derailment. In this regard, maintenance engineers perform routine track inspections to assess current and future ballast conditions. GPR has been used to assess the thickness and fouling levels of ballast. However, there are no potent procedures or specifications with which to determine the level of fouling. This research aims to develop a GPR analysis method capable of evaluating ballast fouling levels. Four ballast boxes were constructed with various levels of fouling. GPR testing was conducted using a GSSI (Geophysical Survey Systems, Inc.) device (400, 900, 1600 MHz), and a KRRI (Korea Railroad Research Institute) GPR device (500 MHz), which was developed for ballast tracks. The dielectric permittivity, scattering of the depth (thickness) values, signal strength at the ballast boundary, and area of the frequency spectrum were compared against the fouling level. The results show that as the fouling level increases, the former two variables increase while the latter two decrease. On the basis of these observations, a new integrated parameter, called a ballast condition scoring index (BCSI), is suggested. The BCSI was verified using field data. The results show that the BCSI has a strong correlation with the fouling level of the ballast and can be used as a fouling-level-indicating parameter.
27 December 2017 in KSCE Journal of Civil Engineering
Groundwater drawdown is one of the factors that inducoe settlement in soft ground. However, the drawdown usually does not lead to a large settlement, and thus is not considered at the design stage. A few sites along the Honam High-Speed Railway experienced relatively large residual settlements, judging from residual settlement criterion of 30 mm in Korea. This settlement occurred during the dry season in Korea; accordingly, groundwater drawdown was pointed out as a cause of the settlement. This study focuses on the effect of groundwater level variation on residual settlement by field measurement and numerical analysis. The numerical simulation produced reasonably similar settlement behavior to that of the field measurements, which proves that the numerical analysis represents field performance. The comparison of numerical analysis between the constant and variable groundwater level clearly shows the effect of groundwater variation on the settlement of soft ground. The drawdown only leads to additional residual settlements of 7.3 and 8.3 mm at the surface of the natural ground and embankment. The total residual settlement is approximately 21.9 mm; thus, more than 33% of the settlement was caused by groundwater drawdown. Therefore, the groundwater variation should be considered at the design and construction stages to reduce residual settlement in the case of strict criterion.
Currently, maintenance work for ballasted track is performed based on the Track Quality Index (TQI) without a fundamental cause investigation for track irregularity. In this study, a new evaluation standard for ballasted track status is proposed to overcome the limitations of current maintenance work. The new evaluation standard is based on the stiffness index. The stiffness index is defined as the difference between the average and standard deviation of the apparent track stiffness determined by a light falling weight deflectometer (LFWD). After some field tests and analysis, it is shown that the stiffness index has a strong correlation not only with TQI but also with maintenance history. In verification results, the new evaluation standard estimated the ballasted track status quite well.
30 April 2017 in Journal of the Korean society for railway
The advancement in digital image analysis methods has led to the development of various techniques, i.e., quantification of ballast gravel abrasion. In this study, the recognition rate of gravel aggregates has been significantly increased by improving the image analysis methods. The correlation between the track quality index (TQI), which is the standard deviation of vertical track irregularity and represents the condition of a high-speed railway, and the number of maintenance works was analyzed by performing an image analysis on the samples collected from various locations of a high-speed railway. The results revealed that roundness has the highest correlation with the TQI, whereas sphericity has the highest correlation with the number of maintenance works. The ballast replacement would be performed to improve maintenance efficiency if the abrasion of the ballast aggregates becomes approximately 10%.