Energy system optimization models used for capacity expansion and dispatch planning are established tools for decision-making support in both energy industry and energy politics. The ever-increasing complexity of the systems under consideration leads to an increase in mathematical problem size of the models. This implies limitations of today’s common solution approaches especially with regard to required computing times. To tackle this challenge many model-based speed-up approaches exist which, however, are typically only demonstrated on small generic test cases. In addition, in applied energy systems analysis the effects of such approaches are often not well understood. The novelty of this study is the systematic evaluation of several model reduction and heuristic decomposition techniques for a large applied energy system model using real data and particularly focusing on reachable speed-up. The applied model is typically used for examining German energy scenarios and allows expansion of storage and electricity transmission capacities. We find that initial computing times of more than two days can be reduced up to a factor of ten while having acceptable loss of accuracy. Moreover, we explain what we mean by “effectiveness of model reduction” which limits the possible speed-up with shared memory computers used in this study.
REMix is a framework for modeling energy systems of almost any temporal, spatial, and technological scale and detail. It can be used to model processes of extraction, storage, conversion, transfer and demand for any commodity, usually representing energy carriers such as electricity, gases, or heat, and to flexibly link them with each other. All processes can be characterized by indicators such as costs or CO 2 emissions. The mathematical core of the framework allows integer and continuous decision variables and the objective function includes one or more indicators. Energy system infrastructures can be considered for both economic dispatch and capacity expansion planning along either single target years or full infrastructure pathways. Research subjects are usually regional to continental systems, and their transformation to a climate-neutral energy supply.
In this paper we introduce FAME-Core, a Java library supporting development and execution of agent-based simulation models (ABM). It is a main component of the open Framework for distributed Agent-based Models of Energy systems. FAME-Core offers rapid development and fast simulation execution capabilities while reducing required programming skills and efforts for creating and running complex ABM.
The accelerated urbanization and industrialization in China is leading to major challenges due to rising energy demand and emissions. Cities in particular play an important role in the decision-making and implementation processes for the energy transition. However, they often have only limited local energy potential and are heavily dependent on supply regions. We therefore assess how a predominantly renewable power supply can be implemented based on the availability of local or imported renewable resources. We present a case study in which an advanced energy system model is parametrized and applied to address questions which are relevant to the transformation of the energy system in China. The model is capable of simultaneously optimizing investment decisions and hourly power balances of a scenario year, taking into account different storage technologies, regional power exchange and policy constraints such as carbon cap, carbon price and renewable portfolio standards. The study takes the Beijing-Tianjin-Hebei metropolitan region with Inner Mongolia as a supply region—considered as exemplary regions characterized by heterogeneous infrastructures, resources and consumption—as its model. Starting from a context-related normative energy scenario, we analyze a possible future electricity system under various assumptions using the Renewable Energy Mix (REMix) energy system model developed at the DLR (German Aerospace Center). Depending on the estimated potentials of renewable energies, technology costs and the projected electricity demand, the metropolitan region is mainly supplied with imported wind and solar power. A sensitivity analysis considers installed capacities, annual generation, CO2 emissions and costs. The results indicate that the assumption of storage costs is of great importance for the future total costs of an electricity system. Variations in other parameters led to different generation portfolios with similar system costs. Our results provide insights into future regional infrastructure needs, and underline the importance of regional coordination and governance for the energy transition in China.