Compaction quality is directly related to the structure and seepage stability of a rockfill dam. To timely and accurately test the compaction quality of the rockfill material, four real‐time test indexes were chosen to characterize the soil compaction degree based on the analysis of roller vibratory acceleration, including acceleration peak value (ap), acceleration root mean square value (arms), crest factor value (CF), and compaction meter value (CMV). To determine which of these indexes is the most appropriate, a two‐part field compaction experiment was conducted using a vibratory roller in different filling zones of the dam body. Data on rolling parameters, real‐time test indexes, and compaction quality indexes were collected to perform statistical regression analyses. Combined with the spectrum analysis of the acceleration signal, it was found that the CF index best characterizes the compaction degree of the rockfill material among the four indexes. Furthermore, the quantitative relations between the real‐time index and compaction quality index were established to determine the control criterion of CF, which can instruct the site work of compaction quality control in the rockfill rolling process.
With regard to the high anti-scouring and abrasion-resistant performance requirements and great temperature control difficulties of lining concrete for large-sized spillway tunnels, in this study, a performance test was conducted on anti-scouring and abrasion-resistant concrete. The finite element method was used to analyze the temperature change rules of sidewall C9050 (design strength of concrete is 50 MPa at 90 days) lining concrete for the spillway tunnel. Further, a new cooling measure was proposed for adopting “early-throughput, high-flow and short-duration”. As indicated by the results of this study, fly ash could reduce water consumption and micro-cracks via its “morphological effect”. Silica fume could improve the early strength of cement concrete and make up for the strength loss caused by fly ash. Polyvinyl alcohol (PVA) fiber could enhance concrete durability. The doping of these three additives reinforced the strength and abrasion resistance of concrete. The results showed that the temperature of the lining concrete presented a change trend of “rapid increase first, followed by a slow decrease”. The peak temperature was reached roughly 2 days after casting. In addition, properly increasing throughput flow or decreasing throughput temperature in the early stage of casting could significantly reduce the highest temperature and maximum temperature difference of concrete. Based on the results from the numerical simulation of temperature control effect, it was proposed to adopt “early-throughput, high-flow, and short-duration” for temperature control and cracking prevention. Specifically, within 2 days after casting, cooling water at roughly 12 °C was guided in at a flow of approximately 3.5 m3/h. Within 3–7 days after casting, river water at around 17 °C was guided in at a flow rate of approximately 1.8 m3/h. After 7 days, the cooling effect can be well achieved by only using the surface flowing water for curing. According to the field monitoring data, the changes in measured temperature were basically consistent with those from numerical simulations, and detection on the temperature of the sidewall lining concrete showed that a qualification rate of >91% was satisfactorily obtained by using the proposed approach.
1 January 2024 in Structural Control and Health Monitoring
The compaction quality is directly related to the deformation and stability of the rockfill dam. Measuring the test pit volume efficiently and accurately is the most critical step during the compaction quality inspection. A new method for calculating the test pit volume based on point cloud data is proposed. An auxiliary device that can change the scanning distance and angle of the handheld 3D laser scanner is developed to collect the initial point cloud. The segmentation method of the initial point cloud data including the test pit and the compaction surface outside the pit is to divide the data into two parts according to the order number of the segmentation point, after slicing and sorting point clouds, which is the key to ensuring the computational precision. The segmentation points are the adjacent two points with the greatest order number difference in these point clouds whose distance from the line connecting the end points of the slicing point clouds is less than dz. The compaction surface point clouds are used to construct a plane by the least‐squares algorithm so that the closed three‐dimensional model is formed by registering it with the test pit point clouds. After converting the test pit surface to the horizontal plane by the Rodrigues formula, the test pit point clouds are divided into n2 parts with equal projection areas on the horizontal plane, and n2 prisms are constructed using them and their projection areas. The test pit volume is the sum of the intersection space volumes of all prisms and the test pit model, and the intersection space is determined by comparing the Z‐values of point clouds. The new method was programmed in MATLAB and applied to the Shuangjiangkou rockfill dam with a height of 315 m. The relative error of volume results between the new method and the old water‐filling method is 0.14–2.31%. The cause of the error is analyzed, and it is proved that the results of the new method are closer to the real volume of the test pit in theory. This method reduces the inspection cost but greatly improves the level of precision, efficiency, and intelligence for compaction quality inspection.
The dam piers undertake crucial tasks of structural support, surface overflow management, and dynamic gate operation under load. Any occurrence of cracks poses risks to their safe and efficient operation. Given the large‐volume characteristics of dam pier concrete, controlling cracks is challenging. The existing analytical methods for dam pier concrete still have certain limitations in revealing the causes of cracks under complex environmental conditions. In particular, when accounting for the coupled effects of early‐age temperature, humidity, and stress fields, further refinement of analytical models and methods is essential to develop more precise active crack control strategies. This study applied a hygro–thermo–mechanical coupling modeling method for early‐age dam pier concrete. Comprehensive physical and mechanical experiments were conducted to calibrate the coupling model parameters to align with actual conditions. An experiment was conducted in a real dam pier to optimize the construction process to control cracks proactively, rather than applying remedial measures postcrack occurrence. The results show that the proposed method effectively analyzes the causes of cracks, and the proactive control measures targeting these causes are proven to be effective. This study provides a reference for proactive crack control of mass concrete structures.
Blasting vibration comfort evaluation (BVCE) is an emerging interdisciplinary multilayer and multifactor issue that involves explosion mechanics, structural dynamics, biodynamics, statistics, psychology, and many other disciplines. The evaluation index system of blasting vibration comfort is divided into three levels: target level, criterion level, and index level. The absorption blasting vibration energy (ABVE) value is calculated based on triangular membership function, while the value of residual subjective evaluation index is obtained based on evaluation standard. The weight of each index is determined using the analytic hierarchy process. By developing the mathematical models, defining and quantifying the BVCE indices, and analyzing the factors that influence blasting vibration comfort in a hierarchical manner, this study proposes an exploratory fuzzy AHP‐based method for comprehensive BVCE. The feasibility\reliability of this method is verified on the basis of 166 groups of comfort survey data. It is found that more than 85% and 62% of forecast results had an error of less than 1.0 and 0.5, respectively. The aim of combining qualitative and quantitative approaches to evaluate and forecast blasting vibration comfort can be initially realized. Further sensitivity analyses show that the absorbed blasting vibration energy (ABVE) index had the most significant influence, followed by environmental vibration, environmental noise, blasting noise, and lastly other factors on blasting vibration comfort. The presented results can provide a reference and guidance for actively creating the favorable conditions in blasting construction practice to improve the resident comfort and to realize the goal of “undisturbing, safe, and harmonious blasting construction.”