Mohamed Ahmed Ahmed Said

Dr. Mohamed Ahmed Ahmed Said

university of Hail -college of Engineering architectural Engineering department

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 March 2019 in Water
Verified
Journal Article
Open access
PDF file
Umar Lawal DanoUmar Lawal Dano
Umar Lawal Dano
ABAbdul-Lateef Balogun
Abdul-Lateef Balogun
AMAbdul-Nasir Matori
Abdul-Nasir Matori
KYKhmaruzzaman Wan Yusouf
Khmaruzzaman Wan Yusouf
Ismaila Rimi AbubakarIsmaila Rimi Abubakar
Ismaila Rimi Abubakar
Biswajeet PradhanBiswajeet Pradhan
Biswajeet Pradhan
Understanding factors associated with flood incidence could facilitate flood disaster control and management. This paper assesses flood susceptibility of Perlis, Malaysia for reducing and managing their impacts on people and the environment. The study used an integrated approach that combines geographic information system (GIS), analytic network process (ANP), and remote sensing (RS) derived variables for flood susceptibility assessment and mapping. Based on experts’ opinion solicited via ANP survey questionnaire, the ANP mathematical model was used to calculate the relative weights of the various flood influencing factors. The ArcGIS spatial analyst tools were used in generating flood susceptible zones. The study found zones that are very highly susceptible to flood (VHSF) and those highly susceptible to flood (HSF) covering 38.4% (30,924.6 ha) and 19.0% (15,341.1 ha) of the study area, respectively. The results were subjected to one-at-a-time (OAT) sensitivity analysis to verify their stability, where 6 out of the 22 flood scenarios correlated with the simulated spatial assessment of flood susceptibility. The findings were further validated using real-life flood incidences in the study area obtained from satellite images, which confirmed that most of the flooded areas were distributed over the VHSF and HSF zones. This integrated approach enables network model structuring, and reflects the interdependences among real-life flood influencing factors. This accurate identification of flood prone areas could serve as an early warning mechanism. The approach can be replicated in cities facing flood incidences in identifying areas susceptible to flooding for more effective flood disaster control.

MAMohamed Aichouni
Mohamed Aichouni
MTMabrouk Touahmia
Mabrouk Touahmia
SASerhan Alshammari
Serhan Alshammari
MSMohamed Ahmed Ahmed Said
Mohamed Ahmed Ahmed Said
Ahmed Baha Eddine AichouniAhmed Baha Eddine Aichouni
Ahmed Baha Eddine Aichouni
HAHamzah Aljohani
Hamzah Aljohani
Working to ensure a safe and secure work environment for workers and employees has become an essential component of achieving organizational excellence in modern organizations. Occupational safety and health (OSH) programs help in attracting and retaining the workforce and human competencies, thus improving the operational and organizational performance of these organizations. Total quality management (TQM) is a management philosophy adopted by successful organizations to achieve sustainable business performance. This study aims to assess the level of implementation of total quality management and occupational safety and health in Saudi organizations and investigates the relationship between total quality management practices and occupational safety and health performance. Data were collected from a number of random organizations during the period November to December 2021. Based on a sample of 99 valid responses, empirical results were obtained through descriptive and advanced statistical analysis, indicating that TQM practices and OHS are highly implemented in Saudi organizations. The statistical results also showed that TQM practices have a significant positive impact on OSH performance in the surveyed organizations. The seven TQM fundamental pillars and the five OSH program components can be considered as essential success factors and fundamental pillars for TQM implementation in organizations and for OSH performance improvement.