The-Quan Nguyen

Dr. The-Quan Nguyen

Hanoi University of Civil Engineering, Hanoi, Hà Nội, Vietnam
orcid
For a smarter and more sustainable built environment.

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 August 2020 in International Journal of Civil Engineering
Verified
Journal Article
Closed access
PDF file
TDTHUY-NINH DAO
THUY-NINH DAO
Po-Han ChenPo-Han Chen
Po-Han Chen
The-Quan NguyenThe-Quan Nguyen
The-Quan Nguyen

23 January 2024 in Journal of Environmental Management
Verified
Journal Article
Closed access
DLDinh Linh Le
Dinh Linh Le
Roberta SalomoneRoberta Salomone
Roberta Salomone
The-Quan NguyenThe-Quan Nguyen
The-Quan Nguyen

31 July 2024 in Journal of Environmental Management
Verified
Journal Article
Closed access
DLDinh Linh Le
Dinh Linh Le
Roberta SalomoneRoberta Salomone
Roberta Salomone
The-Quan NguyenThe-Quan Nguyen
The-Quan Nguyen
AVAlexis M.P.M.G. Versele
Alexis M.P.M.G. Versele
CPChiara Piccardo
Chiara Piccardo

11 July 2018 in Environment and Planning B: Urban Analytics and City Science
Verified
Journal Article
Open access
Alexis ComberAlexis Comber
Alexis Comber
KCKhanh Chi
Khanh Chi
MHMan Q Huy
Man Q Huy
The-Quan NguyenThe-Quan Nguyen
The-Quan Nguyen
Binbin LuBinbin Lu
Binbin Lu
Paul HarrisPaul Harris
Paul Harris
This paper explores the impact of different distance metrics on collinearity in local regression models such as geographically weighted regression. Using a case study of house price data collected in Hà Nội, Vietnam, and by fully varying both power and rotation parameters to create different Minkowski distances, the analysis shows that local collinearity can be both negatively and positively affected by distance metric choice. The Minkowski distance that maximised collinearity in a geographically weighted regression was approximate to a Manhattan distance with (power = 0.70) with a rotation of 30°, and that which minimised collinearity was parameterised with power = 0.05 and a rotation of 70°. The results indicate that distance metric choice can provide a useful extra tuning component to address local collinearity issues in spatially varying coefficient modelling and that understanding the interaction of distance metric and collinearity can provide insight into the nature and structure of the data relationships. The discussion considers first, the exploration and selection of different distance metrics to minimise collinearity as an alternative to localised ridge regression, lasso and elastic net approaches. Second, it discusses the how distance metric choice could extend the methods that additionally optimise local model fit (lasso and elastic net) by selecting a distance metric that further helped minimise local collinearity. Third, it identifies the need to investigate the relationship between kernel bandwidth, distance metrics and collinearity as an area of further work.

26 January 2022 in International Journal of Building Pathology and Adaptation
Verified
Journal Article
Closed access
The-Quan NguyenThe-Quan Nguyen
The-Quan Nguyen
Eric LouEric Lou
Eric Lou
BNBao Ngoc Nguyen
Bao Ngoc Nguyen
Purpose: This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?Design/methodology/approach: The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.Findings: Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.Research limitations/implications: This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.Originality/value: A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

6 February 2025 in Journal of Environmental Management
Verified
Journal Article
Closed access
DLDinh Linh Le
Dinh Linh Le
Roberta SalomoneRoberta Salomone
Roberta Salomone
The-Quan NguyenThe-Quan Nguyen
The-Quan Nguyen
AVAlexis M.P.M.G. Versele
Alexis M.P.M.G. Versele
CPChiara Piccardo
Chiara Piccardo
TNTrung Kien Nguyen
Trung Kien Nguyen