Dmitriy Karamov

Dr. Dmitriy Karamov

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2019 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
Denis SidorovDenis Sidorov
Denis Sidorov
IMIldar Muftahov
Ildar Muftahov
Nikita TominNikita Tomin
Nikita Tomin
DKDmitriy Karamov
Dmitriy Karamov
DPDaniil Panasetsky
Daniil Panasetsky
Aoife FoleyAoife Foley
Aoife Foley
Energy storage systems will play a key role in the power system of the twenty first century considering the large penetrations of variable renewable energy, growth in transport electrification and decentralisation of heating loads. Therefore reliable real time methods to optimise energy storage, demand response and generation are vital for power system operations. This paper presents a concise review of battery energy storage and an example of battery modelling for renewable energy applications and second details an adaptive approach to solve this load levelling problem with storage. A dynamic evolutionary model based on the first kind Volterra integral equation is used in both cases. A direct regularised numerical method is employed to find the least-cost dispatch of the battery in terms of integral equation solution. Validation on real data shows that the proposed evolutionary Volterra model effectively generalises conventional discrete integral model taking into account both SoH and the availability of generation/storage.

6 March 2020 in Energies
Verified
Journal Article
Open access
PDF file
Denis SidorovDenis Sidorov
Denis Sidorov
DPDaniil Panasetsky
Daniil Panasetsky
Nikita TominNikita Tomin
Nikita Tomin
DKDmitriy Karamov
Dmitriy Karamov
AZAleksei Zhukov
Aleksei Zhukov
YLYong Li
Yong Li
Tourism development in ecologically vulnerable areas like the lake Baikal region in Eastern Siberia is a challenging problem. To this end, the dynamical models of AC/DC hybrid isolated power system consisting of four power grids with renewable generation units and energy storage systems are proposed using the advanced methods based on deep reinforcement learning and integral equations. First, the wind and solar irradiance potential of several sites on the lake Baikal’s banks is analyzed as well as the electric load as a function of the climatic conditions. The optimal selection of the energy storage system components is supported in online mode. The approach is justified using the retrospective meteorological datasets. Such a formulation will allow us to develop a number of valuable recommendations related to the optimal control of several autonomous AC/DC hybrid power systems with different structures, equipment composition and kind of AC or DC current. Developed approach provides the valuable information at different stages of AC/DC hybrid power systems projects development with stand-alone hybrid solar-wind power generation systems.

13 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
DKDmitriy Karamov
Dmitriy Karamov
Pavel Vladimirovich IlyushinPavel Vladimirovich Ilyushin
Pavel Vladimirovich Ilyushin
Konstantin SuslovKonstantin Suslov
Konstantin Suslov
The current stage of development of autonomous energy systems is characterized by a rapid increase in renewable energy sources’ installed capacity. Such growth is observed both in centralized and isolated energy systems. Renewable energy sources show high efficiency in the electrification of rural remote settlements around the world. The power of such power complexes varies from several kilowatts to tens of megawatts. When solving the problems of rural remote settlements electrification, the main issues of optimizing the composition of equipment and the structure of the energy systems play an extremely important role. Moreover, depending on the specifications of the problem being solved, criteria for evaluating efficiency are used, which are different. For example, the following are used as objective functions: minimization of the levelized cost of energy and fossil fuel consumption; maximizing the standard of people living and reliability indicators; the payback period of the project and other indicators. Various combinations of objective functions and the solution to the multi-criteria optimization problem are possible. Moreover, an important stage in the development of renewable energy in remote rural areas is the availability of new mechanisms to support an environmentally friendly generation. These mechanisms can be used in solving problems of optimizing the structure and composition of energy equipment in remote power systems. The main purpose of this article is to demonstrate the world practices of optimal design of isolated energy systems. The review includes both the main questions that arise when solving such problems, and specific problems that require a more detailed analysis of the object of study.

30 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
Pavel Vladimirovich IlyushinPavel Vladimirovich Ilyushin
Pavel Vladimirovich Ilyushin
SFSergey P. Filippov
Sergey P. Filippov
AKAleksandr Leonidovich Kulikov
Aleksandr Leonidovich Kulikov
Konstantin SuslovKonstantin Suslov
Konstantin Suslov
DKDmitriy Karamov
Dmitriy Karamov
Gas-fired reciprocating engine plants (GREPs) are widely used in power supply systems of industrial facilities, which allows for ensuring the operation of electrical loads in case of accidents in the power system. Operating experience attests to the fact that during islanded operations, GREPs are shut down by process protections or protective relays in the event of severe disturbances. This leads to complete load shedding, which is accompanied by losses and damage to industrial facilities. Severe disturbances include the following ones: large load surges on GREPs due to one of them being switched off, the group starting of electric motors, and load shedding (more than 50%) during short circuits or disconnection of process lines. Energy storage systems (ESS) have the ability to compensate for instantaneous power imbalances to prevent GREPs from switching off. The authors of this study have developed methods for intelligent control of the ESS that allow one to solve two problems: prevention of GREPs shutdowns under short-term frequency and voltage deviations as well as preservation of the calendar and cycling lifetime of battery storage (BS) of the GREP. The first method does not require performing the calculation of adjustments of control actions for active and reactive power on the ESS online but rather determines them by the value of frequency deviations and the voltage sag configuration, which greatly simplifies the system of automatic control of the ESS. The second method, which consists in dividing the steady-state power/frequency characteristic into sections with different droops that are chosen depending on the current load of the ESS and the battery state of charge, and offsetting it according to a specified pattern, allows for preventing the premature loss of power capacity of the ESS BS.

15 August 2022 in Machines
Verified
Journal Article
Open access
PDF file
Pavel Vladimirovich IlyushinPavel Vladimirovich Ilyushin
Pavel Vladimirovich Ilyushin
SFSergey P. Filippov
Sergey P. Filippov
AKAleksandr Leonidovich Kulikov
Aleksandr Leonidovich Kulikov
Konstantin SuslovKonstantin Suslov
Konstantin Suslov
DKDmitriy Karamov
Dmitriy Karamov
The creation of a decentralized low-carbon energy infrastructure is the main trend in the development of the electric power industry in many countries. Distributed generation facilities (DGs) based on gas reciprocating units (GRUs) are often built by industrial entities for the efficient utilization of secondary energy resources in order to minimize the environmental impact. Modern GRUs have some advantages, but they have design features that should be factored in when connecting them to the internal power systems of industrial entities. Incorrect consideration of possible operating conditions of GRU in their design can lead to their damage, excessive shutdowns, and disruptions in power supply to essential power consumers with significant damage and losses from undersupply of their products. Excessive shutdowns of GRUs are often caused by a non-selective choice of settings for relay protection devices or by load surges that exceed the allowable ones. With high availability factors, GRUs are disconnected five to eight times more often compared to large gas turbine and steam turbine power units. The large total power consumed by electric motors, as part of the load of an industrial entity, determines the nature and parameters of electromechanical transient processes during emergency disturbances. The presented analysis of issues facing real DG facilities relies on the acts of investigation into the causes of accidents. Calculations have shown that the action of the “Load Agreement Module” in the GRU excitation controller can provoke the occurrence of a voltage avalanche in the internal power system with a complete shutdown of the load. The paper presents recommendations on the choice of control algorithms and voltage settings for the GRU excitation controller. Technical solutions are given to prevent damage and excessive shutdowns of GRU in various operating conditions of the system, and to help ensure a reliable power supply to power consumers. The change in approaches to the design of DG facilities is substantiated in the light of their significant differences from other electric power facilities.

1 July 2019
Verified
Conference Paper
Closed access
Denis SidorovDenis Sidorov
Denis Sidorov
QTQing Tao
Qing Tao
IMIldar Muftahov
Ildar Muftahov
AZAleksei Zhukov
Aleksei Zhukov
DKDmitriy Karamov
Dmitriy Karamov
FLFang Liu
Fang Liu