The modeling of battery energy storage systems (BESS) remains poorly researched, especially in the case of taking into account the power loss due to degradation that occurs during operation in the power system with a large penetration of generation from renewables and stochastic load from electric vehicles (EV). Meanwhile, the lifetime varies considerably from the manufacturer’s claim due to different operating conditions, and also depends on the level of renewable energy sources (RES) penetration, cyclic operation, temperature, discharge/charge rate, and depth of discharge. Choosing a simplistic approach to the degradation model can lead to unreliable conclusions in choosing the best management strategy and significant investment and operating costs. Most existing BESS models in stationary applications either assume zero degradation costs for storage or simplify battery life to a linear function of depth of discharge (DOD), which can lead to additional error in estimating the cost of BESS degradation. The complexity of constructing a lifetime model of BESS is due to the presence of nonlinear degradation of BESS at the beginning and at the end of the lifetime, as well as the difficulty in obtaining a large amount of experimental data that are close to the real-world operating conditions for the construction of most models. This article analyzes the features of BESS that are specific to their operation in microgrids in terms of the influence of the main stress factors on the degree of BESS degradation. This study also provides a review of existing models for assessing battery degradation.
The current stage of development of autonomous energy systems is characterized by a rapid increase in renewable energy sources’ installed capacity. Such growth is observed both in centralized and isolated energy systems. Renewable energy sources show high efficiency in the electrification of rural remote settlements around the world. The power of such power complexes varies from several kilowatts to tens of megawatts. When solving the problems of rural remote settlements electrification, the main issues of optimizing the composition of equipment and the structure of the energy systems play an extremely important role. Moreover, depending on the specifications of the problem being solved, criteria for evaluating efficiency are used, which are different. For example, the following are used as objective functions: minimization of the levelized cost of energy and fossil fuel consumption; maximizing the standard of people living and reliability indicators; the payback period of the project and other indicators. Various combinations of objective functions and the solution to the multi-criteria optimization problem are possible. Moreover, an important stage in the development of renewable energy in remote rural areas is the availability of new mechanisms to support an environmentally friendly generation. These mechanisms can be used in solving problems of optimizing the structure and composition of energy equipment in remote power systems. The main purpose of this article is to demonstrate the world practices of optimal design of isolated energy systems. The review includes both the main questions that arise when solving such problems, and specific problems that require a more detailed analysis of the object of study.
The rather high distributed generation (DG) ramp-up observed in the world is largely associated with the progress in low-power generation technologies and the measure of state support for...
Distributed generation facilities are normally connected to distribution electrical networks or internal electrical networks of entities where automatic transfer switches (ATS) are widely used. Commissioning of generating capacities changes significantly the topology and operation, in which case the distributed generation facility can create conditions when the transfer switch does not operate, its response time increases, or a voltage avalanche occurs at the load node and ATS operation is unacceptable. The characteristic areas of post-emergency conditions are identified for the cases of emergency switching after voltage decline, which should be analyzed in the projects aimed at connecting distributed generation to existing electrical networks. The recommendations are made to improve the speed, change the operation algorithms and settings of the ATS fault detectors.
The development of AC distribution systems provides for the seamless integration of low-voltage microgrids with distributed energy resources (DERs). This poses new challenges for the control of normal, emergency, and post-emergency states of microgrids, calling for the creation and development of information and communications technology infrastructure. Power converters/inverters that are used to integrate renewable DERs lack inertia. Along with them, fossil fuel-fired generation units are also being integrated into microgrids. These include gas generator sets, diesel generator sets, and microturbines, having small (up to 1–2 s) values of mechanical inertia constants—Tj. This leads to an increase in the rate of transients by a factor of 5–10. Under these conditions, the technical requirements for the speed of automatic power flow control systems, as well as the methods they rely on, have to be reconsidered. Microgrids include DC microgrids, AC microgrids, and hybrid (AC-DC) microgrids. In the case of hybrid microgrids, DERs are connected to the DC grid and are integrated into the AC grid through a common inverter. The complexity of the task of microgrid control is due to the need to choose properly the type and extent of control actions so as to prevent the emergence and development of accidents. The employed control methods must ensure the reliable power supply to consumers and the quality of power in microgrids, as well as the reliable operation of the external distribution systems into which they are integrated. The article gives an overview of control methods for low-voltage AC and AC-DC microgrids, which allow one to tackle effectively solve the tasks.
The paper presents an analysis of islanding automation application for modern hydrocarbon based power stations connected to distribution power grids. The main features of power plants islanding with auxiliary loads and customer loads at 6-20 kV feeders are considered. It is shown that the results of transient conditions calculation for generator unit islanding sufficiently depends upon a variation of the load power. The regularities for the different grid circuits and conditions are revealed. The study includes the choice of emergency control automation for the islanded power grid part subject to ensure its load stability. Also, the requirements for the speed of unloading given the forced islanding of the power plant off the grid are developed.