Jarosław Malara

Dr. Jarosław Malara

Faculty of Civil Engineering, Cracow University of Technology, 31-155 Kraków, Poland
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 September 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Edyta PlebankiewiczEdyta Plebankiewicz
Edyta Plebankiewicz
JMJarosław Malara
Jarosław Malara
The aim of the article is to present the results of preliminary research of the defects in residential buildings occurring during the warranty period. Due to the small amount of data, the research results cannot be generalized but allow for the formulation of research hypotheses that will be verified in future studies. The data collected included reports of defects in three multifamily residential buildings constructed by the developer in one of the big cities in Poland, which were then examined. For the examination of defects, statistical analysis was used, which revealed that more than half of the reports contained reasonable defects. The results of the preliminary research also indicate that, on the one hand, owners are very active in making warranty claims in the first three months from the date of commissioning, and, on the other hand, with time, the percentage of reasonable defects increases. In terms of the significance of defects, the largest percentage was significant defects. The results showed little activity on the part of property managers in the initial phase of the operation of the buildings, which is the opposite of that of apartment owners. Reports of faults in windows and door joinery, moisture, scratches on walls, and in the area of balconies and terraces are characterized by a relatively low number of cases reported in the first half of the year after the building is commissioned and a gradual increase in the subsequent warranty period. On the other hand, reports related to electrical installation defects are most frequent in the initial period of the warranty, but, with time, their number decreases.

26 November 2019 in Buildings
Verified
Journal Article
Open access
PDF file
JMJarosław Malara
Jarosław Malara
Edyta PlebankiewiczEdyta Plebankiewicz
Edyta Plebankiewicz
Michał JuszczykMichał Juszczyk
Michał Juszczyk
The aim of this study is to build a mathematical model of the productivity of construction workers. It does so by selecting 17 factors that influence the productivity of construction workers and categorising them into five groups. For the mathematical description of the factors, fuzzy logic was used. A formula for calculating the work productivity of construction workers is proposed. The novelty of the approach proposed by the authors is rooted in the consideration of various factors that have the potential to influence the productivity of construction workers. To present the way the formula operates, a single assessment of ceiling formwork was undertaken. The verification of a model confirmed its capability of analyzing, evaluating, and predicting the productivity of construction workers with satisfying accuracy.

26 August 2026 in Przegląd Budowlany
Verified
Journal Article
Closed access
Edyta PlebankiewiczEdyta Plebankiewicz
Edyta Plebankiewicz
JMJarosław Malara
Jarosław Malara
PKPatrycja Karcińska
Patrycja Karcińska
Artykuł przedstawia analizę przyczyn wypadkuśmiertelnego, który miał miejsce na placu budowy podczasprzestawiania i napełniania silosu cementowego. Studium przypadkuukazuje złożoność organizacyjną inwestycji budowlanejoraz trudności w jednoznacznym przypisaniu odpowiedzialności.Główne przyczyny wypadku to nieprawidłowe przygotowaniepodłoża pod silos, brak jednoznacznych procedur i wytycznychtechnicznych oraz niedostateczna komunikacja międzyuczestnikami procesu budowlanego. Artykuł podkreśla koniecznośćwłaściwego zarządzania bezpieczeństwem pracy, wyraźnegoprzypisania odpowiedzialności oraz nadzoru nad realizacją robótbudowlanych w celu zapobiegania podobnym tragediom.

24 May 2022 in MATERIAŁY BUDOWLANE
Verified
Journal Article
Closed access
Krzysztof ZimaKrzysztof Zima
Krzysztof Zima
JMJarosław Malara
Jarosław Malara
SBSebastian Biel
Sebastian Biel
Celem artykułu jest przedstawienie liczby, rodzaju i lokalizacji usterek budowlanych na podstawie analizy protokołów odbioru dwóch wielorodzinnych budynków mieszkalnych. Dokonano przeglądu literatury oraz przedstawiono analizę statystyczną najczęściej występujących usterek, biorąc pod uwagę różne kryteria. Najwięcej usterek zgłoszonych przez inspektorów dotyczyło rys na ścianach i parapetach oraz zarysowań szyb okiennych.