In order to control the tower deviation in the cable hoisting process of long-span concrete-filled steel tubular arch bridge during construction monitoring, a practical method of tower deviation correction was studied and established. In the paper, based on the studies about the deviation error formation mechanism of tower in the process of cable lifting, the relevant formulas of the arch rib elevation changes caused by the change of tower state were deduced. The traditional control methods including increase of tower stiffness and strength of the anchor cable, are not effective, costly, and require a longer construction period. To overcome these defects, in virtue of the Beidou GNSS measurement system and hydraulic jack active control system, the active control technology of the CFST (Concrete Filled Steel Tube) arch bridge tower deviation was thoroughly studied. Besides, a perfect active control theory was established. Finally, the author puts forward the idea of reverse pulling tower deviation. The field measurement and comparative study show that after the optimization of this method, the tower deviation is within 2 cm, and the error meets the specification requirements. The proposed method can accurately control the tower deviation in the process of arch bridge cable hoisting, and establish a set of perfect active control related systems and theories, which is especially suitable for the construction monitoring and adjustment in the construction stage of arch bridge, and can provide reference for the construction control of tower deviation of the same type of bridge.
This paper presents a numerical study on the high‐temperature mechanical properties of a long‐span double‐deck suspension bridge. The main focus of this paper is the behavior analysis of Wuhan Yangtze River Bridge. A three‐dimensional thermal model of the bridge was established by the Fire Dynamics software (FDS) to obtain the 3D temperature field distribution, and the thermal analysis result was then applied to the three‐dimensional finite element model of the suspension bridge. The shortest failure time of the main cable and sling was determined to obtain the rescue time of a bridge fire. According to the calculation results of the suspension bridge under a tanker fire initiated at the upper deck of the bridge, the middle lane in the upper deck of the suspension bridge was determined to be a safe lane. Thus, the tanker should be guided to go in this lane of the bridge. The numerical analysis of the experimental results shows that when the fuel tanker is located on the upper and lower floors of the bridge, the bridge structure is affected by the fire. When the oil tanker burns in the outermost lane of the upper bridge, it will have a great impact on the main cables and slings of the bridge. When the fuel tanker burns in the lower nonmotorized lane of the bridge, it will have a great impact on the upper stiffening beam steel plates and truss rods.
10 January 2019 in Advances in Structural Engineering
It is the basic characteristics of bridge weigh-in-motion technology to directly identify the vehicle weight based on the bridge dynamic response. At present, bridge weigh-in-motion technology tends to be mature in identification of gross vehicle weighing, but there is no breakthrough in identification of single-axle weighing. Therefore, a new axle-weight identification method is proposed using bridge weigh-in-motion technology in this article, in which the idea of bridge weigh-in-motion technology is introduced first. The numerical expression of the single-axle weight and the identification expression of axle space and vehicle speed are presented thereafter. Furthermore, the accuracy of the presented method is further reinforced through a series of practical model experiments of simply supported and continuous beam. The experimental result indicated that the proposed method is feasible in practical application.
For complex structures, the existing optimization method for suspender cable forces involves extensive matrix operations during the solution process, requiring high computational power and time. As a result, obtaining a more accurate solution becomes challenging. To address this issue and improve the stress distribution of suspenders in the completed state, while minimizing the need for frequent cable force adjustments and grid beam elevation changes during construction, a novel method for cable force optimization is proposed. In this study, the Pingnan Third Bridge, which is the world’s longest large span arch bridge with a span of 575 m, is taken as the engineering background. This study combines finite element analysis and multi-objective optimization methods to develop a cable force optimization approach for real-time correction during the panel girder lifting of long-span concrete-filled steel tube (CFST) arch bridges. The optimization method involves treating the panel girder weight and displacement during construction as parameter variables, and considering the displacement and unevenness of the panel girder in the completed state as constraint conditions. The objective equation is defined based on the displacement and cable force during the lifting construction process and, through optimization, the cable forces and displacements of each lifting section are calculated. The results demonstrate the feasibility of integrating optimization theory into the cable force optimization process during panel girder lifting. In this study, we have taken into account the characteristics of real-world engineering and focused on specific key points to reduce the order of the influence matrix. Consequently, the computational costs are reduced, facilitating the development of a multi-objective tension optimization program. By minimizing segment displacement variations and ensuring even cable force distribution in the completed state, the method ensures that the bridge meets the required completion requirements without the need for repetitive iterations or cumbersome calculations. It provides higher optimization efficiency and superior outcomes, offering significant value for cable force calculations during suspender construction of similar bridge types and guiding construction processes.
In view of the limitations of the existing optimization method of suspender cable force, in order to improve the stress of suspender under completion state and avoid frequent adjustment of cable force and grid beam elevation during construction, a new method of cable force optimization is proposed. The article takes the longest large span arch bridge in the world, Pingnan Third Bridge, a Concrete-filled steel tube (CFST) arch bridge with a span of 575m as the engineering background combined with the finite element analysis and multi-objective optimization method. One cable force optimization method that suspender “Real-time correction during construction, in the process variable optimal and results reliable” during panel girder lifting of long span CFST arch bridges is clarified. Taking the panel girder weight and displacement during the construction as parameter variables, the displacement and unevenness of the panel girder under completion state as constraint conditions, the displacement and cable force during the hoisting construction as the objective equation, through the optimization of the objective equation, the suspender cable force and dis-placement of each hoisting section are calculated. The results show that it is feasible to introduce the optimization theory into the cable force optimization when lifting the panel girder. the segment displacement variation is minimized to meet the destination. The cable force distributed evenly under completion state of the bridge that further making sure the completion state satisfies the requirements. No repeating iteration is needed, thus avoiding cumberso me calculation, getting cable force once. With higher optimization efficiency and better effects, the method provides high value for the cable force calculation of same type bridge suspender construction and for guiding construction.
The construction duration of long-span arch bridges is excessively prolonged due to insufficient closing precision and the non-convergence of traditional cable adjustment calculation methods. This study investigates cable force management in long-span concrete-filled steel tubular (CFST) arch bridges during cable-stayed buckle construction, aiming to improve construction safety and precision in arch rib alignment. Using the Pingnan Third Bridge and Tian’e Longtan Bridge as practical examples, the research develops a multi-objective optimization method for cable forces that integrates influence matrices, constrained minimization, and a forward iterative approach. This method offers a robust strategy for tensioning and cable-stayed buckling, enabling real-time monitoring, calculation, and adjustment during the construction of large-span CFST arch bridges. The results reveal that the iterative approach notably enhances calculation efficiency compared to conventional methods. For instance, field measurements at the Pingnan Third Bridge show a minimal arch closure error of only 3 mm. Additionally, the study addresses concerns about excessive stress in exposed steel tubes during concrete casting. By optimizing the sequence of main arch closure and concrete casting, stress in the exposed steel tube is reduced from 373 MPa to 316 MPa, thus meeting specification requirements. In summary, the multi-objective cable force optimization method demonstrates superior efficiency in determining cable tension and controlling rib alignment during cable-stayed buckle construction of long-span CFST arch bridges.