Xinyu Yao

Mr. Xinyu Yao

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 October 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
NDNianchun Deng
Nianchun Deng
MYMengsheng Yu
Mengsheng Yu
XYXinyu Yao
Xinyu Yao
In order to control the tower deviation in the cable hoisting process of long-span concrete-filled steel tubular arch bridge during construction monitoring, a practical method of tower deviation correction was studied and established. In the paper, based on the studies about the deviation error formation mechanism of tower in the process of cable lifting, the relevant formulas of the arch rib elevation changes caused by the change of tower state were deduced. The traditional control methods including increase of tower stiffness and strength of the anchor cable, are not effective, costly, and require a longer construction period. To overcome these defects, in virtue of the Beidou GNSS measurement system and hydraulic jack active control system, the active control technology of the CFST (Concrete Filled Steel Tube) arch bridge tower deviation was thoroughly studied. Besides, a perfect active control theory was established. Finally, the author puts forward the idea of reverse pulling tower deviation. The field measurement and comparative study show that after the optimization of this method, the tower deviation is within 2 cm, and the error meets the specification requirements. The proposed method can accurately control the tower deviation in the process of arch bridge cable hoisting, and establish a set of perfect active control related systems and theories, which is especially suitable for the construction monitoring and adjustment in the construction stage of arch bridge, and can provide reference for the construction control of tower deviation of the same type of bridge.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
MYMengsheng Yu
Mengsheng Yu
QCQifeng Chen
Qifeng Chen
XYXinyu Yao
Xinyu Yao
XGXiao Guo
Xiao Guo
THTianzhi Hao
Tianzhi Hao
HWHua Wang
Hua Wang
This paper presents a numerical study on the high‐temperature mechanical properties of a long‐span double‐deck suspension bridge. The main focus of this paper is the behavior analysis of Wuhan Yangtze River Bridge. A three‐dimensional thermal model of the bridge was established by the Fire Dynamics software (FDS) to obtain the 3D temperature field distribution, and the thermal analysis result was then applied to the three‐dimensional finite element model of the suspension bridge. The shortest failure time of the main cable and sling was determined to obtain the rescue time of a bridge fire. According to the calculation results of the suspension bridge under a tanker fire initiated at the upper deck of the bridge, the middle lane in the upper deck of the suspension bridge was determined to be a safe lane. Thus, the tanker should be guided to go in this lane of the bridge. The numerical analysis of the experimental results shows that when the fuel tanker is located on the upper and lower floors of the bridge, the bridge structure is affected by the fire. When the oil tanker burns in the outermost lane of the upper bridge, it will have a great impact on the main cables and slings of the bridge. When the fuel tanker burns in the lower nonmotorized lane of the bridge, it will have a great impact on the upper stiffening beam steel plates and truss rods.

18 May 2025 in Buildings
Verified
Journal Article
Open access
PDF file
MYMengsheng Yu
Mengsheng Yu
XYXinyu Yao
Xinyu Yao
LKLu Ke
Lu Ke
THTianzhi Hao
Tianzhi Hao
XWXirui Wang
Xirui Wang
The behavior of long-span concrete-filled steel tube (CFST) arch bridges during the pouring stage is complex. The coupling effect of the time-varying hydration heat and the evolution of the elastic modulus is crucial for the linear control of the structure. Most of the existing models focus on static self-weight analysis but generally ignore the above-mentioned dynamic heat–force interaction, resulting in significant prediction deviations. In response to this limitation, this paper proposes an analysis method for the injection stage considering the time-varying heat of hydration and elastic modulus of concrete inside the pipe. Firstly, based on the composite index model of the hydration heat and through the reduction of the participating materials, the heat source function of the hydration heat of the arch rib was obtained, and its accuracy was verified by using two test components. Secondly, the equivalent application method of the hydration heat temperature field of the bar system model was proposed. Combined with the modified time-varying model of the elastic modulus at the initial age, the analysis method for the pouring stage of concrete-filled steel tube arch bridges was established. Finally, the accuracy of the proposed method was verified by analysis and calculation combined with engineering examples and comparison with the measured results. The results show that the time-varying heat of hydration and the time-varying elastic modulus during the concrete pouring stage inside the pipe can lead to residual deflection after the arch rib is poured. The calculated value of the example reaches 154 mm, while the influence of the lateral displacement is relatively small and recoverable. The proposed method improves the calculation accuracy by 44.19% compared with the traditional method, which is of great significance for the actual engineering construction control.

30 August 2023 in Buildings
Verified
Journal Article
Open access
PDF file
MYMengsheng Yu
Mengsheng Yu
XYXinyu Yao
Xinyu Yao
NDNianchun Deng
Nianchun Deng
THTianzhi Hao
Tianzhi Hao
LWLonglin Wang
Longlin Wang
HWHua Wang
Hua Wang
For complex structures, the existing optimization method for suspender cable forces involves extensive matrix operations during the solution process, requiring high computational power and time. As a result, obtaining a more accurate solution becomes challenging. To address this issue and improve the stress distribution of suspenders in the completed state, while minimizing the need for frequent cable force adjustments and grid beam elevation changes during construction, a novel method for cable force optimization is proposed. In this study, the Pingnan Third Bridge, which is the world’s longest large span arch bridge with a span of 575 m, is taken as the engineering background. This study combines finite element analysis and multi-objective optimization methods to develop a cable force optimization approach for real-time correction during the panel girder lifting of long-span concrete-filled steel tube (CFST) arch bridges. The optimization method involves treating the panel girder weight and displacement during construction as parameter variables, and considering the displacement and unevenness of the panel girder in the completed state as constraint conditions. The objective equation is defined based on the displacement and cable force during the lifting construction process and, through optimization, the cable forces and displacements of each lifting section are calculated. The results demonstrate the feasibility of integrating optimization theory into the cable force optimization process during panel girder lifting. In this study, we have taken into account the characteristics of real-world engineering and focused on specific key points to reduce the order of the influence matrix. Consequently, the computational costs are reduced, facilitating the development of a multi-objective tension optimization program. By minimizing segment displacement variations and ensuring even cable force distribution in the completed state, the method ensures that the bridge meets the required completion requirements without the need for repetitive iterations or cumbersome calculations. It provides higher optimization efficiency and superior outcomes, offering significant value for cable force calculations during suspender construction of similar bridge types and guiding construction processes.

17 October 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MYMengsheng Yu
Mengsheng Yu
XYXinyu Yao
Xinyu Yao
LWLonglin Wang
Longlin Wang
THTianzhi Hao
Tianzhi Hao
NDNianchun Deng
Nianchun Deng
The construction duration of long-span arch bridges is excessively prolonged due to insufficient closing precision and the non-convergence of traditional cable adjustment calculation methods. This study investigates cable force management in long-span concrete-filled steel tubular (CFST) arch bridges during cable-stayed buckle construction, aiming to improve construction safety and precision in arch rib alignment. Using the Pingnan Third Bridge and Tian’e Longtan Bridge as practical examples, the research develops a multi-objective optimization method for cable forces that integrates influence matrices, constrained minimization, and a forward iterative approach. This method offers a robust strategy for tensioning and cable-stayed buckling, enabling real-time monitoring, calculation, and adjustment during the construction of large-span CFST arch bridges. The results reveal that the iterative approach notably enhances calculation efficiency compared to conventional methods. For instance, field measurements at the Pingnan Third Bridge show a minimal arch closure error of only 3 mm. Additionally, the study addresses concerns about excessive stress in exposed steel tubes during concrete casting. By optimizing the sequence of main arch closure and concrete casting, stress in the exposed steel tube is reduced from 373 MPa to 316 MPa, thus meeting specification requirements. In summary, the multi-objective cable force optimization method demonstrates superior efficiency in determining cable tension and controlling rib alignment during cable-stayed buckle construction of long-span CFST arch bridges.

17 April 2025 in Buildings
Verified
Journal Article
Open access
PDF file
XYXinyu Yao
Xinyu Yao
CLChuanxi Li
Chuanxi Li
This study investigates the Huangdong Daning River Bridge project in Guangxi, where the innovative side-span and mid-span synchronous closure technology for continuous rigid-frame bridges (CRFB) was systematically implemented for the first time in this region of China. A comparative finite element model developed in MIDAS Civil 2024 was employed to analyze the mechanical behavior mechanisms of main girders under span-by-span closure and synchronous closure processes. The numerical simulation results demonstrate that the stress distribution in main girders shows no significant sensitivity (<3%) to closure method differences during both the bridge completion phase and 10-year shrinkage-creep cycle. However, distinct closure sequences (asynchronous vs. synchronous) exhibited notable impacts on the girder alignment at the completion stage. The cumulative deviation induced by differential installation elevations of formwork segments necessitates precise dynamic control during construction monitoring. Furthermore, shrinkage and creep effects manifested differential influences on pier top horizontal displacements and bending moments when employing different closure methods, though all variations remained within 5%. The synchronous multi-span closure technology effectively mitigates structural mutation risks during construction while achieving superior alignment accuracy, rational stress distribution, and accelerated construction progress as verified by field implementation.