This article describes the observed and examined effect of crumb rubber on the strength (compressive, bending and splitting tensile) of concrete. The tests have shown that the change in the strength of concrete with crumb rubber waste additives can be forecasted from exponential equations. These relationships enable to foresee the regularities of strength properties when a certain amount of crumb rubber of a certain size fraction is added to concrete. The obtained exponential equations show that concrete compressive, flexural and splitting tensile strengths decrease with increasing crumbed rubber additive amount. The testing has also shown that the addition of a small amount of crumbed rubber slightly increases (7%) the tensile splitting strength. The reason is better adhesion of the cement stone with rubber particles compared to the adhesion of sand, which was replaced by crumbed rubber. With higher content of crumbed rubber additive in the concrete, the tensile splitting strength decreases due to the significant increase of entrained air content and lower density.
The Smart Readiness Indicator (SRI) is an assessment scheme for the intelligence of buildings, which was introduced by the European Commission in the directive for the Energy Performance of Buildings in 2018. Since its introduction, many activities related to the maturation and employment of the SRI have been initiated. One of the adaptation needs of the SRI, revealed through public consultation with relevant stakeholders, is the requirement for a tailored SRI for different types of buildings. The aim of this study is to analyze possible scenarios to optimize the smartness performance, as addressed by the SRI score, in educational buildings. The subject of this study concerned campus buildings of the Kaunas University of Technology, in Lithuania. For the definition of the SRI, the calculation sheet developed by the European Commission was used. The effect of the improvements in the smartness performance of buildings on their energy efficiency was examined with the use of a whole-building, BIM-based energy assessment tool (IDA-ICE). The findings of this study revealed that despite the improvement in the automation and control levels of the building heating system, the maximum SRI values achieved deviate significantly by a high-smartness level. This study revealed the importance of services at a city level towards achieving the optimal smartness levels at a building unit level. It also delivered useful findings related to the linkage between energy and smartness performance of a building. The policy implication of the study findings also covers topics relevant to utilities management at a district level, as well as on the need for tailored SRI services catalogs for different types of buildings.
Nowadays, companies employ various project management (PM) methodologies to ensure that their projects are effective and successful. It is worth knowing that differences in principles and processes of PM methodologies influence the use of different PMs in managing non-repetitive and repetitive construction projects. This paper presents the selection and application of a rational construction PM methodology to a repetitive construction project after a comparison of two PM methodologies, namely Project Management Body of Knowledge (PMBOK) and Projects IN Controlled Environments (PRINCE2). The object of this study is a repetitive anti-corrosion works project for steel structures conducted at Company X. The research was carried out in two steps. First, a quantitative survey of the respondents from companies involved in the management and execution of construction projects was conducted with the aim to identify a rational approach to construction PM. The questionnaire consisted of fourteen closed-ended questions, six of which were generic and eight were PMBOK- and PRINCE2-specific questions. Companies that took part in the quantitative study identified the PRINCE2 project management approach as the most suitable for managing a repetitive construction project. Using the PRINCE2 PM methodology, the repetitive construction project would aim to provide as much information as possible to the project participants, form a team and assign team leaders responsible for the phases, establish a financial plan, a detailed timetable for the execution of the works, a quality control plan, and a plan of responsible persons, and detail the technological sequencing of the works. Second, a quantitative study on the selection of a rational construction project management approach for a repetitive construction project was pursued, and a qualitative assessment of construction project monitoring trends and actions was conducted. The qualitative research was performed using a structured interview method and asking the representatives of different companies X, Y, and Z the same 15 questions. The results of the qualitative research showed that a successful PM depends on the size of the project team, the PM tools and methodologies used, the PM philosophy, and the frequency of monitoring and discussing the project progress.
In the design of high-energy performance buildings with ventilated facade systems, the evaluation of point thermal bridges is complicated and is often ignored in practice. This paper analyzes the relationship between the point thermal bridges resulting from aluminum fasteners, which are used for installation facades cladding, and the thermal properties of materials that are used in external walls layers and dimension of layers. Research has shown that the influence of the point thermal bridges on the U-value of the entire wall may achieve an average of up to 30% regarding thermal properties of materials of the external wall layers and the dimension of layers. With the increase in thermal conductivity of the bearing layer material and the thickness of the thermal insulation layer, the point thermal transmittance χ-value increased. For this reason, the U-value of the entire wall may increase by up to 35%. With the increase of the thickness of the bearing layer and thermal conductivity value of thermal insulation layer, the point thermal transmittance χ-value decreased by up to 28%. A simplified methodology is presented for the evaluation of point thermal bridges based on the thermal and geometrical properties of external wall layers.
This research presents the influence of ordinary Portland cement (OPC) and/or water glass addition on fly ash alkali-activated mortar and concrete. The results show that fly ash (FA) concrete activated with a NaOH solution and water glass mixture had better resistance to freeze and thaw, carbonation, alkali-silica reaction (ASR) and developed higher compressive strength and static elastic modulus compared with the FA concrete activated only with an NaOH solution. The addition of OPC contributes to the development of a denser microstructure of alkali activated concrete (AAC) samples. In the presence of water glass and OPC, the compressive strength (52.60 MPa) of the samples increased more than two times as compared with the reference sample (21.36 MPa) without OPC and water glass. The combination of OPC and water glass showed the increased strength and enhanced durability of AAC. The samples were more resistant to freeze and thaw, ASR, and carbonation.