Metal content determination is one of the critical aspects of preparing electronic waste for metal recycling. In spite of the fact that end-of-life printed circuit boards are considered to be a secondary resource reservoir, no standard procedure exists for determining the total metal content in this heterogeneous multicomponent material containing plastics, metals, alloys and ceramics. We investigated the utilization of United States Environmental Protection Agency (US EPA) microwave acid digestion (Method 3052) and various modifications of this procedure for effective releasing of Cu, Fe, Ni, Pb and Zn from waste printed circuit boards (WPCBs) from mobile phones. The maximum contents of Cu (22.6 wt.%), Fe (5.0 wt.%), Ni (2.0 wt.%) and Zn (2.6 wt.%) were obtained using the standard (unmodified) US EPA 3052 digestion procedure, but the total digestion of PCB material was not achieved. The solid residue material after digestion by means of the US EPA 3052 method consisted predominantly of oxides (Ca, Mg and Al) and fluorides (Ca and Mg), and some particles contained minor amounts of Fe and Cu.
Neutral leaching or water washing is used for Cl− and partially Ca2+ ion removal in order to save the leaching reagents for the next steps in hydrometallurgical treatment of electric arc furnace dust. This pre-treatment of the material leads to the generation of strong alkaline (pH = 11.9–12.7) leachate (wastewater), which underlies precipitation of Ca and other accompanying metals. This work presents results from the study of various economically differing (cost and time) techniques for elimination of these disadvantageous phenomena. The aim of the experimental study was to obtain water suitable for reuse in the leaching or for discharge into a recipient in accordance with valid legislation. The experiments were focused on the removal of precipitates, or metals which create the precipitates, and pH decreasing. Our results indicate that five-minute agitation of 4 g solid NaHCO3 and 1 L of neutral leachate and subsequent ion exchange in the sequence of strong-acid cation and strong-base anion exchange treatment led to the acquisition of water without creation of precipitates, with pH below 8.5 and conductivity approx. 0.03 mS. The removal of Cl− ions was not complete.
During hot-dip galvanization, wastes such as bottom dross, zinc ash, spent pre-treatment solutions, and galvanizing flue dust (GFD) are generated. In scientific publications, research devoted to GFD waste recycling is absent, and companies generating this waste require a solution to this complex problem. GFD is often landfilled in hazardous waste landfills. However, it is possible to process this waste hydrometallurgically, where GFD is first leached, the solution is refined, and finally, zinc metal is obtained by electrowinning. During specific environmentally friendly leaching, not all solid GFD is dissolved, and the aim of this study is to process the remaining solid GFD residue. The analysis shows that the GFD residue material mainly contains zinc (42.46%) in the form of oxides, but there is also a small amount of polluting elements such as Al, Fe, and Pb. This study examines the leaching of the samples in HCl and H2SO4 under different conditions with the aim of obtaining a solution with a high concentration and high leaching efficiency of zinc. The L/S ratio of 3, 4 M H2SO4, and ambient temperature proved to be optimal for the leaching of the GFD residue, where 96.24% of zinc was leached out, which represents a zinc concentration of 136.532 g/L.
21 February 2018 in Environmental Monitoring and Assessment
In metallurgical practice, the material is considered of adequate quality if it meets the customer’s expectations. It is necessary to take representative samples and perform quality testing to avoid financial and intangible losses. Sample contamination and matrix and surface quality play a significant role in the accuracy of chemical analyses. The purpose of this paper is to point out the advantages of specific methods of taking samples, such as immersion and spoon sampling of molten metal, and, in the experimental part, to assess the impacts of factors affecting the quality of the sampling. The influence of time of final sampling on determining the true amount of magnesium during a single melt and the influence of duration of mixing of molten cast iron on the accuracy of chemical analysis of the control sample were investigated. It is important that the time between the modification and casting of the liquid cast iron from the casting ladle be as short as possible. This is because the magnesium burns out and thus the chemical analysis of the sample taken is not accurate. Another important factor is ensuring the melt before sampling is homogenized and has the minimum prescribed temperature (1420 °C). Increasing sample collection time will cause changes in its chemical composition.