Zahid Khand

Zahid Khand


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 August 2021 in Journal of Control, Automation and Electrical Systems
Verified
Journal Article
Closed access
PDF file
VBVeer Bhan
Veer Bhan
Shoaib AhmedShoaib Ahmed
Shoaib Ahmed
ZKZahid Khand
Zahid Khand
TATofique Ahmed
Tofique Ahmed
LKLiaquat Ali Khan
Liaquat Ali Khan
Abdul Majeed ShaikhAbdul Majeed Shaikh
Abdul Majeed Shaikh

14 January 2021 in Electronics
Verified
Journal Article
Open access
PDF file
SKSunny Katyara
Sunny Katyara
Muhammad Fawad ShaikhMuhammad Fawad Shaikh
Muhammad Fawad Shaikh
Shoaib AhmedShoaib Ahmed
Shoaib Ahmed
ZKZahid Khand
Zahid Khand
LSLukasz Staszewski
Lukasz Staszewski
Zbigniew LeonowiczZbigniew Leonowicz
Zbigniew Leonowicz
With the rising load demand and power losses, the equipment in the utility network often operates close to its marginal limits, creating a dire need for the installation of new Distributed Generators (DGs). Their proper placement is one of the prerequisites for fully achieving the benefits; otherwise, this may result in the worsening of their performance. This could even lead to further deterioration if an effective Energy Management System (EMS) is not installed. Firstly, addressing these issues, this research exploits a Genetic Algorithm (GA) for the proper placement of new DGs in a distribution system. This approach is based on the system losses, voltage profiles, and phase angle jump variations. Secondly, the energy management models are designed using a fuzzy inference system. The models are then analyzed under heavy loading and fault conditions. This research is conducted on a six bus radial test system in a simulated environment together with a real-time Power Hardware-In-the-Loop (PHIL) setup. It is concluded that the optimal placement of a 3.33 MVA synchronous DG is near the load center, and the robustness of the proposed EMS is proven by mitigating the distinct contingencies within the approximately 2.5 cycles of the operating period.