Yanfeng Li

Dr. Yanfeng Li

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 July 2024 in Coatings
Verified
Journal Article
Open access
PDF file
JXJin Xin
Jin Xin
HFHaoxuan Fu
Haoxuan Fu
DLDeli Li
Deli Li
YYYe Yang
Ye Yang
YYYanhai Yang
Yanhai Yang
JZJiupeng Zhang
Jiupeng Zhang
To determine the formula for biomimetic warm-mix regeneration and fulfill the requirements of a “high waste asphalt mixture content, high quality, and high level” for its usage in reclaimed asphalt pavement (RAP), this paper first determined the suitable preparation process and formula for biomimetic warm-mix regeneration based on orthogonal experiments and a gray correlation analysis. Then, the optimum dosage of the warm-mix regenerant was determined by a uniaxial penetration test, low-temperature splitting test, and freeze–thaw penetration test. The rutting test was conducted to characterize the high-temperature performance of the asphalt mixture. The Immersion Marshall Test and the freeze–thaw splitting test were used to characterize the water stability of the recycled asphalt mixture. The low-temperature small beam test was employed to study the low-temperature performance of the recycled asphalt mixture. The asphalt’s short-term and long-term aging processes were simulated using the rotary thin-film oven test (RTFOT) and the pressure aging test (PAV). The action mechanism of biomimetic warm-mix regeneration was revealed by Fourier-transform infrared spectroscopy (FTIR). Finally, a comprehensive thermal performance test was conducted on the aged asphalt after biomimetic warm-mix regeneration. The results showed that the self-made biomimetic warm-mix regeneration agent exhibited an excellent regenerative effect on RAP and significantly reduced the mixing temperature of the styrene–butadiene–styrene (SBS)-modified asphalt mixture. In addition, the self-made biomimetic warm-mix regeneration agent effectively improved the high- and low-temperature performance of the recycled asphalt mixture, but had no noticeable effect on the water stability. The suggested dosage of the biomimetic warm-mix regeneration agent was 6%, and the mixing temperature was 130 °C. The microscopic chemical analysis revealed that biomimetic warm-mix regeneration restored the performance of aged asphalt by supplementing the light component. The change rules of the chemical functional groups and the comprehensive thermal properties of the recycled mixture showed a good correlation with the change rules of its high- and low-temperature performance.

30 April 2023 in Stavební obzor - Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
YLYanfeng Li
Yanfeng Li
JLJialong Li
Jialong Li
JZJihe Zhao
Jihe Zhao
TZTongfeng Zhao
Tongfeng Zhao
DGDong Guo
Dong Guo
Long-term health detection of railway-tunnel is the development direction and trend of future railway tunnel research. Based on the actual engineering of a railway tunnel, this study developed a safety evaluation model for railway tunnel structures using a fuzzy comprehensive evaluation method and examined a health state evaluation method suitable for most railway tunnel structures. The results showed that the evaluation method comprehensively reflected the impact of various factors, which had strong practicality. The evaluation results were clear, accurate, and consistent with engineering practice. When using the safety factor index to study the stress of a railway tunnel structure, Midas/civil analysis showed that different levels of the surrounding rock structural vault in railway tunnels were in a tensile, control-bearing capacity state. When calculating safety factors, the range of a 60° central angle of a railway tunnel vault was calculated according to the tensile control-bearing capacity. Theoretical formulas of the range of the center angle φ0 of the vault tension zone were derived and then verified by experiments and numerical analysis.

31 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
YLYanao Liu
Yanao Liu
YLYanfeng Li
Yanfeng Li
GCGuojie Chen
Guojie Chen
YLYuanhui Li
Yuanhui Li
JLJialong Li
Jialong Li
JJJiaxu Jin
Jiaxu Jin
The construction of urban subway tunnels typically induces soil settlement within a specific radius of the surrounding area. However, the accuracy of current methods for predicting ground deformation curves corresponding to the excavation of double-track tunnels with small spacing remains insufficient. Most studies simplify this problem by modeling it as a two-dimensional plane problem; however, the actual ground deformation exhibits pronounced three-dimensional characteristics. Consequently, studying the ground settlement patterns caused by the construction of small-spacing double-track tunnels is crucial. This study is based on the Peck formula, used to calculate surface settlement caused by the excavation of single-track tunnels. By incorporating the maximum settlement offset e and the soil loss rate η(y), the soil displacement calculation formula is derived for small-spacing double-track tunnel excavation. The accuracy of the derived formula is then validated through a case study. The findings provide a theoretical reference for predicting surface settlement induced by the excavation of small-spacing double-track tunnels. Furthermore, the influence of different parameters on ground settlement patterns is explored. The results indicate that appropriately increasing the tunnel spacing, increasing burial depth, and adopting a sequential excavation method for the two tunnels help reduce ground settlement.

12 June 2024 in Coatings
Verified
Journal Article
Open access
PDF file
WPWu Pengfei
Wu Pengfei
振高振波 高
振波 高
JJJiaxu Jin
Jiaxu Jin
FLFengmei Lian
Fengmei Lian
YLYanfeng Li
Yanfeng Li
TLTao Liu
Tao Liu
This paper proposes a new type of gangue filling body (GFB) to address the issues of the low stability, strength, poor shrinkage performance, and inadequate seepage resistance of paste filling materials in overburdened mining conditions, as well as the challenge of fully utilizing solid waste gangue. The coal gangue (CG), U-expanding agent (UEA), and amount of water added were kept constant, and the mass ratio of the various components was adjusted to the design. The standard for filling was assessed using slump tests, uniaxial compression tests, shrinkage tests, and penetration tests. A further microscopic analysis of the pastes with an optimal filling performance was conducted using SEM. The support pressure and overburden migration patterns in the GFBs were evaluated using Flac3D. The results indicate that the GFB with ratio 4 performed best, highlighting the significant role of Portland cement (OPC). The GFB with ratio 3 demonstrated the second-best performance, suggesting that GFBs with a higher early strength should be chosen to fill hollow zones for an effective filling outcome. This study introduced a new type of paste filling material and confirmed the rock transport law of this material under overburdened conditions using Flac3D, offering significant insights for the engineering field.

1 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
YCYing Chen
Ying Chen
JZJiuhong Zhang
Jiuhong Zhang
YLYanfeng Li
Yanfeng Li
JLJialong Li
Jialong Li
By integrating rough set theory and neural network theory, this study combined their advantages. Drawing on the existing theoretical results for bridge influencing factors, a method for numerical simulation and data fusion was used in the application of multifactor data fusion for cable‐stayed bridge safety evaluation. Based on studying existing bridge safety evaluation methods, a neural network and rough set theory were combined to perform a safety evaluation of PC cable‐stayed bridge cables, which provided a new means for bridge safety evaluation. First, a cable‐stayed bridge in Shenyang was used as the engineering background, the safety level of its cables was divided into five levels, and a safety evaluation database was established, clustered by a Kohonen neural network. This provided specific evaluation indicators corresponding to the five safety levels. A rough neural network algorithm integrating the rough set and neural network was applied to data fusion of the database, with the attribute‐reduction function of the rough set used to reduce the input dimension of the neural network. Conclusions. The neural network was then trained and the resulting trained network was applied to the safety evaluation of the cables of the cable‐stayed bridge. Four specific attribute index values, corresponding to the bridge cables, were directly input to obtain the safety status of the bridge and provide corresponding management suggestions.

24 June 2021 in Archives of Civil Engineering
Verified
Journal Article
Open access
PDF file
YLYanfeng Li
Yanfeng Li
JZJihe Zhao
Jihe Zhao
YXYing Xiong
Ying Xiong
Qinghe WangQinghe Wang
Qinghe Wang
A theoretical formula for large-diameter rock-socket depth is developed to support pail embedding in a large bridge pile foundation project. There is a horizontal additional stress concentration at the place where the soil around the rock-socketed pile meets the soil layer under the horizontal load. When the rock-socketed tip stress and bending moment of the pile are relatively small, the pile shows favourable embedment effect and the pile foundation can be considered safe. The function curve of soil resistance around the pile under the action of horizontal force was obtained by finite element analysis. The force characteristics reveal the depth of the largediameter rock-socketed pile under the horizontal load. As the rock-socketed pile rotates under the action of horizontal force, the rock mass resistance around the pile changes according to the cosine. The distribution of pileside soil resistance is proportional to the displacement and distributed according to the sine. A comprehensive correction coefficient of pile shaft resistance beta is introduced to deduce the theoretical formula of the depth r h of the large-diameter rock-socketed pile embedded in the bedrock. It is verified through both experiments and numerical analysis.