Fredy Kristjanpoller

Dr. Fredy Kristjanpoller

orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2013 in International Journal of Mining Science and Technology
Verified
Journal Article
Closed access
RMRodrigo Mena
Rodrigo Mena
Enrico ZioEnrico Zio
Enrico Zio
FKFredy Kristjanpoller
Fredy Kristjanpoller
AAAdolfo Arata
Adolfo Arata

20 January 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
PGPablo Viveros Gunckel
Pablo Viveros Gunckel
Katalina GonzálezKatalina González
Katalina González
RMRodrigo Mena
Rodrigo Mena
FKFredy Kristjanpoller
Fredy Kristjanpoller
JRJavier Robledo
Javier Robledo
Efficiency in supply chains is critically affected by the performance of operations within warehouses. For this reason, the activities related to the disposition and management of inventories are crucial. This work addresses the multi-level storage locations assignment problem for SKU pallets, considering divisible locations in the first level to improve the picking operation and reduce the travel times associated with the routes of the cranes. A mathematical programming model is developed considering the objective of minimizing the total travel distance, and in the background, maximizing the use of storage capacity. To solve this complex problem, we consider its decomposition into four subproblems, which are solved sequentially. To evaluate the performance of the model, two analysis scenarios based on different storage strategies are proposed to evaluate both the entry and exit distance of pallets, as well as the cost associated with the movements.

1 December 2018 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
CNC. Nakousi
C. Nakousi
RPR. Pascual
R. Pascual
ANGELINA ANANIANGELINA ANANI
ANGELINA ANANI
FKFredy Kristjanpoller
Fredy Kristjanpoller
PLP. Lillo
P. Lillo

1 August 2012 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
MMMarco Macchi
Marco Macchi
FKFredy Kristjanpoller
Fredy Kristjanpoller
MGMarco Garetti
Marco Garetti
AAAdolfo Arata
Adolfo Arata
Luca FumagalliLuca Fumagalli
Luca Fumagalli

11 April 2023 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
FKFredy Kristjanpoller
Fredy Kristjanpoller
NPNicolás Javier Cárdenas Pantoja
Nicolás Javier Cárdenas Pantoja
PVPablo Viveros
Pablo Viveros
RPRodrigo Pascual
Rodrigo Pascual

31 October 2011 in Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability
Verified
Journal Article
Closed access
PDF file
PGPablo Viveros Gunckel
Pablo Viveros Gunckel
Enrico ZioEnrico Zio
Enrico Zio
FKFredy Kristjanpoller
Fredy Kristjanpoller
AAA Arata
A Arata
The analysis of a production line requires the consideration of its reliability and productive capacity since they have a direct influence on the expected levels of performance. These factors have an intrinsic stochastic behaviour which must be accounted for in the analysis. This paper proposes an integrated approach based on Monte Carlo simulation which is tested on a case study concerning the production line of a private mining company located in northern Chile. Specifically, the primary, secondary, and tertiary crushing processes are analysed in detail. Actual maintenance and operation data for 16 months of operation are considered in the case study. A tailored simulation model is developed that is able to jointly estimate the reliability and productivity of the process. The integration of these two aspects allows situations in which equipment becomes unavailable to be identified and this can improve business continuity and process productivity.