Energy communities (ECs) are becoming increasingly common entities in power distribution networks. To promote local consumption of renewable energy sources, governments are supporting members of ECs with strong incentives on shared electricity. This policy encourages investments in the residential sector for building retrofit interventions and technical equipment renovations. In this paper, a general EC is modeled as an energy hub, which is deemed as a multi-energy system where different energy carriers are converted or stored to meet the building energy needs. Following the standardized matrix modeling approach, this paper introduces a novel methodology that aims at jointly identifying both optimal investments (planning) and optimal management strategies (operation) to supply the EC’s energy demand in the most convenient way under the current economic framework and policies. Optimal planning and operating results of five refurbishment cases for a real multi-family building are found and discussed, both in terms of overall cost and environmental impact. Simulation results verify that investing in building thermal efficiency leads to progressive electrification of end uses. It is demonstrated that the combination of improvements on building envelope thermal performances, photovoltaic (PV) generation, and heat pump results to be the most convenient refurbishment investment, allowing a 28% overall cost reduction compared to the benchmark scenario. Furthermore, incentives on shared electricity prove to stimulate higher renewable energy source (RES) penetration, reaching a significant reduction of emissions due to decreased net energy import.
Multi-Energy Microgrids (MEMGs) offer great opportunities for enhancing energy systems efficiency and penetration of renewable energy sources (RESs). By coupling traditionally independent electrical and thermal networks with binding components such as Combined Heat and Power (CHP) units, system operators can benefit from higher energy utilization efficiency. However, MEMGs' operation is severely compromised by uncertainties existing in RES generation and electric loads, which can never be perfectly predicted. This affects considerably the MEMG day-ahead dispatch and poses major challenges on how to maintain reliable operating conditions. This work proposes a coordinated dispatch strategy to minimize the operating costs of a network-constrained MEMG consisting of combined electrical and thermal distribution networks when multiple uncertain parameters are considered. To capture uncertainty variability, the operation method was modeled as a stochastic programming problem. Moreover, the Monte Carlo sampling technique was used to generate a large number of random scenarios. The proposed stochastic operation method was tested on a 14-bus system to find the optimal day-ahead scheduling operation. A feasibility check of the stochastic and deterministic methods was then carried out based on a new set of uncertainties realizations. Results indicated the proposed operation model to minimize the operating costs and guarantee strong robustness against uncertainties' realizations.