Fabio Bignucolo

Prof. Fabio Bignucolo

Department of Industrial Engineering - University of Padova
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 January 2017 in Energies
Verified
Journal Article
Open access
PDF file
Fabio BignucoloFabio Bignucolo
Fabio Bignucolo
ACAlberto Cerretti
Alberto Cerretti
Massimiliano CoppoMassimiliano Coppo
Massimiliano Coppo
ASAndrea Savio
Andrea Savio
Roberto TurriRoberto Turri
Roberto Turri
The recent growing diffusion of dispersed generation in low voltage (LV) distribution networks is entailing new rules to make local generators participate in network stability. Consequently, national and international grid codes, which define the connection rules for stability and safety of electrical power systems, have been updated requiring distributed generators and electrical storage systems to supply stabilizing contributions. In this scenario, specific attention to the uncontrolled islanding issue has to be addressed since currently required anti-islanding protection systems, based on relays locally measuring voltage and frequency, could no longer be suitable. In this paper, the effects on the interface protection performance of different LV generators’ stabilizing functions are analysed. The study takes into account existing requirements, such as the generators’ active power regulation (according to the measured frequency) and reactive power regulation (depending on the local measured voltage). In addition, the paper focuses on other stabilizing features under discussion, derived from the medium voltage (MV) distribution network grid codes or proposed in the literature, such as fast voltage support (FVS) and inertia emulation. Stabilizing functions have been reproduced in the DIgSILENT PowerFactory 2016 software environment, making use of its native programming language. Later, they are tested both alone and together, aiming to obtain a comprehensive analysis on their impact on the anti-islanding protection effectiveness. Through dynamic simulations in several network scenarios the paper demonstrates the detrimental impact that such stabilizing regulations may have on loss-of-main protection effectiveness, leading to an increased risk of unintentional islanding.

14 January 2017 in Energies
Verified
Journal Article
Open access
PDF file
Fabio BignucoloFabio Bignucolo
Fabio Bignucolo
RCRoberto Caldon
Roberto Caldon
Massimiliano CoppoMassimiliano Coppo
Massimiliano Coppo
FPFabio Pasut
Fabio Pasut
MPMartino Pettinà
Martino Pettinà
The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

29 March 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
MUMuhammad Usman
Muhammad Usman
Massimiliano CoppoMassimiliano Coppo
Massimiliano Coppo
Fabio BignucoloFabio Bignucolo
Fabio Bignucolo
Roberto TurriRoberto Turri
Roberto Turri
ACAlberto Cerretti
Alberto Cerretti

18 March 2017 in Energies
Verified
Journal Article
Open access
PDF file
Fabio BignucoloFabio Bignucolo
Fabio Bignucolo
ACAlberto Cerretti
Alberto Cerretti
Massimiliano CoppoMassimiliano Coppo
Massimiliano Coppo
ASAndrea Savio
Andrea Savio
Roberto TurriRoberto Turri
Roberto Turri
The ever-growing penetration of local generation in distribution networks and the large diffusion of energy storage systems (ESSs) foreseen in the near future are bound to affect the effectiveness of interface protection systems (IPSs), with negative impact on the safety of medium voltage (MV) and low voltage (LV) systems. With the scope of preserving the main network stability, international and national grid connection codes have been updated recently. Consequently, distributed generators (DGs) and storage units are increasingly called to provide stabilizing functions according to local voltage and frequency. This can be achieved by suitably controlling the electronic power converters interfacing small-scale generators and storage units to the network. The paper focuses on the regulating functions required to storage units by grid codes currently in force in the European area. Indeed, even if such regulating actions would enable local units in participating to network stability under normal steady-state operating conditions, it is shown through dynamic simulations that they may increase the risk of unintentional islanding occurrence. This means that dangerous operating conditions may arise in LV networks in case dispersed generators and storage systems are present, even if all the end-users are compliant with currently applied connection standards.

30 March 2021 in Energies
Verified
Journal Article
Open access
PDF file
JSJan Marc Schwidtal
Jan Marc Schwidtal
MAMARCO AGOSTINI
MARCO AGOSTINI
Fabio BignucoloFabio Bignucolo
Fabio Bignucolo
Massimiliano CoppoMassimiliano Coppo
Massimiliano Coppo
PGPatrizia Garengo
Patrizia Garengo
ALArturo Lorenzoni
Arturo Lorenzoni
In light of the advancing energy transition and an increasing amount of intermittent renewable energy to be integrated, flexibility from distributed energy resources will be key. In this paper, the Italian UVAM (Unità Virtuali Abilitate Miste, i.e., virtually aggregated mixed units) project, one of the biggest pilots in Europe to serve this purpose, is critically reviewed and mapped after two years of operation. The pilot is analyzed on a global level as well as the individual participant level. Based on the extensive analysis of actual market data, different strategies of participating companies to obtain capacity in accordance with the pilot project’s design are identified. Furthermore, the specific bidding strategies of individual participating units on the balancing market are outlined. Alongside this, the overall pilot project’s market integration, in terms of offered and accepted bids, is depicted. The thorough data analysis, therefore, serves as an input and fundamental building block for future electricity market modeling. Comprehending specific data from the coronavirus disease 2019 (COVID-19) pandemic, provides insights for future high renewable-energy scenarios. Based on the analysis findings, valuable deliverables are devised for both policy-makers and decision-makers who aim to leverage the flexibility potential of distributed resources.

7 April 2021 in Energies
Verified
Journal Article
Open access
PDF file
PGPierpaolo Garavaso
Pierpaolo Garavaso
Fabio BignucoloFabio Bignucolo
Fabio Bignucolo
JVJacopo Vivian
Jacopo Vivian
GAGiulia Alessio
Giulia Alessio
MCMichele De Carli
Michele De Carli
Energy communities (ECs) are becoming increasingly common entities in power distribution networks. To promote local consumption of renewable energy sources, governments are supporting members of ECs with strong incentives on shared electricity. This policy encourages investments in the residential sector for building retrofit interventions and technical equipment renovations. In this paper, a general EC is modeled as an energy hub, which is deemed as a multi-energy system where different energy carriers are converted or stored to meet the building energy needs. Following the standardized matrix modeling approach, this paper introduces a novel methodology that aims at jointly identifying both optimal investments (planning) and optimal management strategies (operation) to supply the EC’s energy demand in the most convenient way under the current economic framework and policies. Optimal planning and operating results of five refurbishment cases for a real multi-family building are found and discussed, both in terms of overall cost and environmental impact. Simulation results verify that investing in building thermal efficiency leads to progressive electrification of end uses. It is demonstrated that the combination of improvements on building envelope thermal performances, photovoltaic (PV) generation, and heat pump results to be the most convenient refurbishment investment, allowing a 28% overall cost reduction compared to the benchmark scenario. Furthermore, incentives on shared electricity prove to stimulate higher renewable energy source (RES) penetration, reaching a significant reduction of emissions due to decreased net energy import.