MANSOOR SOOMRO

Mr. MANSOOR SOOMRO

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 April 2023 in Energies
Verified
Journal Article
Open access
PDF file
MSMANSOOR SOOMRO
MANSOOR SOOMRO
ZMZubair Ahmed Memon
Zubair Ahmed Memon
MBMazhar H. Baloch
Mazhar H. Baloch
NMNayyar Hussain Mirjat
Nayyar Hussain Mirjat
Laveet KumarLaveet Kumar
Laveet Kumar
GAETANO ZIZZOGAETANO ZIZZO
GAETANO ZIZZO
The doubly fed induction generator (DFIG)-based wind energy conversion system (WECS) suffers from voltage and frequency fluctuations due to the stochastic nature of wind speed as well as nonlinear loads. Moreover, the high penetration of wind energy into the power grid is a challenge for its smooth operation. Hence, symmetrical faults are most intense, inflicting the stator winding to low voltage, disturbing the low-voltage ride-through (LVRT) functionality of a DFIG. The vector control strategy with proportional–integral (PI) controllers was used to control rotor-side converter (RSC) and grid-side converter (GSC) parameters. During a symmetrical fault, however, a series grid-side converter (SGSC) with a shunt injection transformer on the stator side was used to keep the rotor current at an acceptable level in accordance with grid code requirements (GCRs). For the validation of results, the proposed scheme of PI + SGSC is compared with PI and a combination of PI with Dynamic Impedance Fault Current Limiter (DIFCL). The MATLAB simulation results demonstrate that the proposed scheme provides superior performance by providing 77.6% and 20.61% improved performance in rotor current compared to that of PI and PI + DIFCL control schemes for improving the LVRT performance of DFIG.

4 August 2024 in Wind Engineering
Verified
Journal Article
Closed access
MSMANSOOR SOOMRO
MANSOOR SOOMRO
ZMZubair Ahmed Memon
Zubair Ahmed Memon
MKMahesh Kumar
Mahesh Kumar
MBMazhar H. Baloch
Mazhar H. Baloch
NMNayyar Hussain Mirjat
Nayyar Hussain Mirjat
LKLaveet Kumar
Laveet Kumar
The doubly fed induction generator (DFIG) is the most popular induction generator for onshore wind energy conversion system (WECS). Therefore, the purpose of research is to optimize power transfer from DFIG to power grid which requires frequency and voltage stability in power converters. Hence, the single-stage and multistage power converter topologies associated with grid-integrated DFIG are thoroughly examined in this work. In the single stage, a matrix converter and cycloconverter are used. Whereas, the multistage topologies include two-level back-to-back (2L-B2B) converter, Z-source converter, and multilevel converters. Furthermore, three-level neutral point clamped (3L-NPC) voltage source converters with battery energy storage systems (BESS) and modified superconducting fractional order terminal sliding mode controllers (MSTFOTSMC) have been used with multilevel converter both at rotor side converter (RSC) and grid side converter (GSC) for stabilized generated voltage and higher power output. The MATLAB simulation results demonstrate that the system effectively controls fluctuations in voltage and current thereby improving the power quality in unbalanced situations.

2 November 2024 in Energies
Verified
Journal Article
Open access
PDF file
MSMANSOOR SOOMRO
MANSOOR SOOMRO
RARiaz Abbasi
Riaz Abbasi
MBMazhar H. Baloch
Mazhar H. Baloch
STSohaib Tahir
Sohaib Tahir
MSMokhi Maan Siddiqui
Mokhi Maan Siddiqui
Due to the economic and environmental concerns associated with fossil fuels, many government and private organizations are progressively shifting towards the integration of solar farms with Utility Grids. However, these systems are facing insulation failure issues due to internal and external transient overvoltage’s, in which their shape, magnitude, and duration are unpredictable, and consequently, the insulation stress also becomes unpredictable. To ensure the safety and integrity of the system against any transient overvoltage event, it is important to carry out an insulation coordination analysis. The primary goal of this research work is to achieve this optimization in an economically viable manner, ensuring both operational stability and cost-effectiveness in the design of electrical equipment like surge Arresters. The research work presented in the literature does not fully evaluate all International Electrotechnical Commission (IEC) overvoltage classes as specified in the insulation coordination standards for Utility Grids integrated with solar farms. Therefore, this research paper investigates the impact of various transient and switching overvoltage conditions, as defined in the IEC 60071.4 Insulation Coordination Standard at the Solar and Utility Grid Electrical power system using PSCAD 4.6/EMTP Software. Five distinct simulation scenarios were developed to assess the systems’ resilience against insulation stress events. The proposed system was also examined with and without the application of a lightning surge arrester.

15 September 2026 in Energies
Verified
Journal Article
Open access
PDF file
Honnurvali Mohamed ShaikHonnurvali Mohamed Shaik
Honnurvali Mohamed Shaik
BWBadar AL Washahi
Badar AL Washahi
MBMazhar H. Baloch
Mazhar H. Baloch
TJTouqeer Jumani
Touqeer Jumani
Abdul Manan SheikhAbdul Manan Sheikh
Abdul Manan Sheikh
Syed Abdul MoizSyed Abdul Moiz
Syed Abdul Moiz
The increasing use of rooftop photovoltaic (PV) systems in distribution networks can lead to operational challenges, including feeder overloading, reverse power flow, fluctuating net-load characteristics, and future hosting-capacity constraints. This research presents an integrated data-driven approach for the holistic evaluation of the impacts of rooftop PV on the Sohar Grid Station (GSS) distribution network in Oman. The proposed framework integrates spatial feeder-loading analysis, PV adoption assessment, net-load and duck-curve evaluation, reverse-power-flow detection, PV performance analysis under dust conditions, machine learning-based net-load forecasting, hosting-capacity screening, and SHAP-based explainability. The framework is based on operational feeder data, Sahim PV installation and export data, meteorological factors, irradiance, and dust-related metrics. The findings demonstrate that the present network is already under operational stress, with 10 out of 35 feeders exceeding the 100% loading reference limit, including two feeders that reached loading levels of 192.8% and 183.3%, respectively. The present PV penetration of the Sahim system causes a modest decrease in net daytime demand and localised reverse-power-flow effects on feeders with higher PV-to-load ratios. The hosting-capacity study identified a PV accommodation potential of 27.11 MWp DC, compared with an existing installed capacity of 2.037 MWp DC, indicating substantial screening-level potential for additional PV deployment, although the available capacity varies across feeders and should not be interpreted as a definitive interconnection limit. Among the evaluated forecasting methods, the combined convolutional neural network and long short-term memory (CNN-LSTM) model achieved the lowest root mean square error (0.063 MW) and the highest coefficient of determination (0.984). In addition, SHAP analysis of the Random Forest model showed that recent and weekly historical net-load values were the dominant predictors. The proposed framework provides a useful decision-support tool for reliable rooftop PV integration and distribution network planning.