Taehun Ha

Dr. Taehun Ha


Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 May 2016 in Applied Sciences
Verified
Journal Article
Open access
PDF file
THTaehun Ha
Taehun Ha
JKJeongwon Ko
Jeongwon Ko
SLSangho Lee
Sangho Lee
SKSeonwoong Kim
Seonwoong Kim
JJJieun Jung
Jieun Jung
Dae-Jin KimDae-Jin Kim
Dae-Jin Kim
This paper presents a case study on the rehabilitation of a fire-damaged structure and describes the results of a site investigation and tests, leading to a plan for the rehabilitation of the structure. The fire took place in the main control room of a thermal power plant and lasted about three hours until it was finally extinguished. To set up a rehabilitation plan for the damaged structure, a visual inspection of the damaged condition was first carried out, which was followed by analysis and on-site material tests indicating the degree of neutralization progress in the remaining structure. Specimens of damaged concrete and reinforcing bars were sampled and tested for their residual strengths. As a conclusion, two methods of rehabilitation were suggested considering the current condition of the structure and the sequence of construction.

30 April 2012 in Journal of the Korea Concrete Institute
Verified
Journal Article
Closed access
SCSungchul Chun
Sungchul Chun
STSo-Young Tak
So-Young Tak
THTaehun Ha
Taehun Ha

30 June 2014 in Journal of the Korea Concrete Institute
Verified
Journal Article
Closed access
SCSungchul Chun
Sungchul Chun
STSo-Young Tak
So-Young Tak
SLSungho Lee
Sungho Lee
KSKwang-Ho Sho
Kwang-Ho Sho
THTaehun Ha
Taehun Ha

30 June 2012 in Journal of the Korea Concrete Institute
Verified
Journal Article
Closed access
SCSungchul Chun
Sungchul Chun
JLJin-Gon Lee
Jin-Gon Lee
THTaehun Ha
Taehun Ha

1 September 2007 in ACI Structural Journal
Verified
Journal Article
Closed access
PDF file
PBPradeep Bhargava
Pradeep Bhargava
MBMikael W. Braestrup
Mikael W. Braestrup
SCShiming Chen
Shiming Chen
SCSungchul Chun
Sungchul Chun
JDJinsheng Du
Jinsheng Du
HSHimat Solanki
Himat Solanki

1 July 2016 in Journal of Structural Engineering
Verified
Journal Article
Closed access
SCSung-Chul Chun
Sung-Chul Chun
THTaehun Ha
Taehun Ha
Reshoring makes a floor support its own weight and decreases the construction load in the lower levels. However, a significant concern regarding reshoring lies in its safety and serviceability when shores are replaced while the construction load of the upper levels is applied. To investigate this concern and compare the construction load in shores and reshores, reinforced concrete (RC) beam-column joints at early ages were tested in the laboratory and were also monitored at a construction site. The specimens at ages of 2 and 3 days showed a shear-compression failure, and the specimens at ages of 7 or more days showed sufficient flexural behaviors. The test also found that the beam-column joints have sufficient stiffness even at the earliest ages that the joint can be safely assumed to be fully restrained regardless of the concrete age. Analysis of the test results showed that reshoring at 5 days of concrete age is 55% safer than keeping the shores until the age of 28 days, and no serviceability pr...