This paper investigates the current state of knowledge of the existing compaction testing methods for asphalt and identifies the limitations of these methods in using them during asphalt pavement compaction. Conventional spot tests that are carried out at limited spots for quality control (QC) and quality assurance (QA) of asphalt compaction often fail to ensure the uniformity of compaction. The differential approach using microwave sensors attached to the rollers can qualitatively indicate the optimum density during asphalt compaction; however, it requires spot density measurements to quantify the asphalt density achieved. intelligent compaction (IC) can be used to ensure the uniformity of asphalt compaction and to get real-time feedback. The current IC specifications for soil compaction are not suitable for asphalt compaction due to the viscoelastic nature of asphalt and the variation of asphalt mat temperature during compaction in the field. In addition, the state-of-the-art intelligent compaction measurement value (ICMVs) recorded during asphalt compaction does not correlate well with the asphalt density while it shows a reasonable correlation with asphalt stiffness. The effects of asphalt mat temperature and underlying support on ICMVs measured by IC rollers are identified as the potential causes of the poor correlation between ICMVs and spot density measurements. It is proposed that the relationship between asphalt modulus used in pavement designs and the ICMVs corrected for the effects of asphalt mat temperature and underlying support needs to be investigated in order to establish performance-based specifications for QA/QC of asphalt compaction. The emerging research on using GPR for asphalt density estimation is examined and the factors that affect the GPR measurements during asphalt pavement compaction are identified .
14 April 2023 in International Journal of Pavement Engineering
The main aim of this paper is to analyse the performance of different intelligent compaction measurement values (ICMVs) and compare them with spot test measurements for asphalt pavement. To accomplish this, a two-layer asphalt testbed was constructed using an instrumented double-drum roller. All ICMVs [compaction meter value ( ), compaction control value ( ), roller-integrated stiffness ( ), and vibratory modulus ( )] were calculated using the same accelerometer data collected during the construction of the asphalt testbed. The analysis of ICMV data showed a strong correlation between and , while and demonstrated a strong correlation only when double jump of the roller drum did not occur. Further, none of the ICMVs recorded during the last roller pass of asphalt compaction showed an acceptable correlation with asphalt densities [measured using a non-nuclear density gauge (NNDG)], mainly due to the influences of the underlying support and asphalt temperature on ICMVs. A correction method to decouple the influence of underlying support on was developed and validated using existing data from the literature. The applicability of this method for different field scenarios was demonstrated using numerical modelling.
15 June 2023 in Construction and Building Materials
This paper presents a novel equation (named the ‘STKAR equation’) to predict the average in-depth temperature of asphalt layers in real-time during compaction using the measured surface temperature and the estimated temperature gradient at the asphalt surface. The motivation for the development of this method is the fact that the asphalt surface temperature measured during asphalt compaction using infrared radiation (IR) sensors mounted on state-of-the-art intelligent compaction (IC) rollers does not represent the average temperature in the asphalt layer, which governs its mechanical properties. Further, current asphalt temperature prediction models require the elapsed time since asphalt paving to predict the in-depth temperature of the asphalt layer during compaction. However, the measurement of elapsed time for each spot on the asphalt layer during compaction has practical difficulties in the field. In this study, the STKAR equation was derived from the 1-D diffusion equation for the cooling process of a newly-laid hot asphalt layer during compaction in the field. The developed equation was validated using the temperature data obtained during the construction of a two-layer asphalt testbed in the field. The in-depth temperatures predicted using the STKAR equation showed excellent agreement with the in-depth temperatures measured in asphalt layers during compaction. Further, numerical simulations were carried out to examine the applicability of the STKAR equation to different field scenarios. The numerical results showed that the initial temperature of the asphalt mix, the thermal conductivity of the underlying support material and the initial temperature of the underlying support significantly affect the in-depth temperature profile of asphalt layers, while asphalt density and asphalt specific heat content have negligible effects on the in-depth temperature profile. The STKAR equation was further refined by incorporating the factors which affect the in-depth temperature profile of asphalt layers during compaction.
The main aim of this paper is to analyse the performance of different intelligent compaction measurement values (ICMVs) and compare them with spot test measurements for asphalt pavement. To accomplish this, a two-layer asphalt testbed was constructed using an instrumented double-drum roller. All ICMVs [compaction meter value ( ), compaction control value ( ), roller-integrated stiffness ( ), and vibratory modulus ( )] were calculated using the same accelerometer data collected during the construction of the asphalt testbed. A novel method using the cross-correlation technique was developed to estimate the phase lag between the excitation force of the roller drum and the ground reaction, which is required for and calculations. The analysis of ICMV data showed a strong correlation between and , while and demonstrated a strong correlation only when double jump of the roller drum did not occur. Further, none of the ICMVs recorded during the last roller pass of asphalt compaction showed an acceptable correlation with asphalt densities [measured using a non-nuclear density gauge (NNDG)], mainly due to the influences of the underlying support and asphalt temperature on ICMVs. A correction method to decouple the influence of underlying support on was developed and validated using existing data from the literature. The applicability of this method for different field scenarios was demonstrated using numerical modelling.