Alaa Khasawneh

Mrs. Alaa Khasawneh

Albalqa Applied University
orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 October 2021 in Energies
Verified
Journal Article
Open access
PDF file
Alaa KhasawnehAlaa Khasawneh
Alaa Khasawneh
MQMoh'd Zaidan Qawaqzeh
Moh'd Zaidan Qawaqzeh
VKVladislav Kuchanskyy
Vladislav Kuchanskyy
Olena RubanenkoOlena Rubanenko
Olena Rubanenko
Oleksandr MiroshnykOleksandr Miroshnyk
Oleksandr Miroshnyk
MDMarcin Drechny
Marcin Drechny
During the design of extra-high-voltage transmission lines, studies of the influence of asymmetry due to the phase difference of the parameters on its processes and the electrical network were performed. To compensate for this source of asymmetry for transmission lines longer than 100 km, a relatively simple technical means was proposed and implemented—phase transposition (change of the mutual location of phase wires in space). However, at the same time transposition causes additional capital costs in construction and reduces reliability during operation, so when designing a specific transmission line, extra-high-voltage is desirable to evaluate the effectiveness of the use of this measure in the real electricity network. Thus, under certain conditions, even for a transmission line 600 km in length, it was possible to perform either an incomplete transposition cycle, or abandon this measure altogether.

24 May 2021 in Energies
Verified
Journal Article
Open access
PDF file
HAHuthaifa Al_Issa
Huthaifa Al_Issa
MQMoh'd Zaidan Qawaqzeh
Moh'd Zaidan Qawaqzeh
Alaa KhasawnehAlaa Khasawneh
Alaa Khasawneh
RBRoman Buinyi
Roman Buinyi
VBViacheslav Bezruchko
Viacheslav Bezruchko
Oleksandr MiroshnykOleksandr Miroshnyk
Oleksandr Miroshnyk
The article discusses the selection of cables for power lines connecting wind turbine generators at the wind power plant. The screen cross-section of these cables should be selected considering the value of the screen current at double line-to-earth fault. To calculate this current, the dimensions of the cable should be known. However, these parameters are hidden and cannot be used during designing. Therefore, a highly simplified method is currently used in practice. It is shown that the errors from the highly simplified method are up to 33%. Authors propose a simplified method based on open data of cable manufacturers. The proposed method is compared with simulation results of a common model of cable power line and takes into account self and mutual inductances of the cores and screens. It is shown that the error of the proposed method is smaller than 4.0% for real cable power lines at wind power plants. However, for a long section of cable power line (2.5 km) the error of calculation might increase up to 6.3%. This allows us to use the proposed method for designing. In addition, the authors show how the results of the highly simplified method can be corrected to improve accuracy.

28 April 2026 in PRZEGLĄD ELEKTROTECHNICZNY
Verified
Journal Article
Closed access
LHLina H. Hussienat
Lina H. Hussienat
HAHuthaifa Al_Issa
Huthaifa Al_Issa
MQMoh'd Zaidan Qawaqzeh
Moh'd Zaidan Qawaqzeh
Alaa KhasawnehAlaa Khasawneh
Alaa Khasawneh
ITIryna Trunova
Iryna Trunova
PKPaweł KIEŁBASA1
Paweł KIEŁBASA1
Recommendations for the use of engineering management using the example of business analysis elements of the project of an automated quality management system for maintenance of distribution networks are proposed. A scheme for using databases of Distribution System Operators in the automated quality management system for maintenance of distribution networks has been developed to monitor achieved results, stimulate the achievement of better results and optimize the planning of technical operation works.