The recovery of gold by ore leaching is influenced by the size of the particles and the chemical environment. The effect of particle size on the dissolution of gold is usually studied using mono-size particles as the gold in solution comes from the ore of a unique leached particle size. This paper proposes a method to estimate the gold dissolution as a function of particle size using a bulk ore sample, i.e., with the dissolved gold coming from the various sizes of particles carried by the ore. The results are consistent with the fact that gold dissolution increases with the decreasing particle size but results also indicate that gold dissolution of the ore within a size interval is not significantly affected by the grinding time used for the ore size reduction. Results also show a good dissolution of the gold contained in the fine-size fractions without oxidation and lead nitrate pre-treatment for an ore that is known to require such pre-treatment.
The separation of Rare Earth Elements (REEs) is an important step in the valorization of REE ore and aims at producing individual rare earth compounds for the market. The separation is carried out industrially by solvent extraction (SX) using interconnected circuits consisting of cascades of mixer-settlers. The design of a REE separation circuit implies the selection of the operating conditions and of the number of mixer-settlers required to achieve a target degree of purity for the separated elements. This design work is either carried out by piloting a circuit or using a mathematical simulation. Independent of the method, the world expertise in this area is limited. This paper describes a simulation method requiring a minimum of calibration effort, which can be used to design a complete REE separation plant. The simulation enables assessment of the effect of the number of mixer-settlers per extraction, the scrubbing and stripping stage, as well as the pH of the aqueous solution and organic-phase contents of free and loaded extractant on the purity of the separated REEs. The simulation tool presented here has been developed from a fundamental analysis of the chemical reactions involved in the solvent extraction process. Unlike most of the simulation methods documented in the literature, the method requires no empirical calibration. The proposed method is validated using data from laboratory batch tests and with published data from continuous pilot and industrial REE separation circuits. The application of the simulation tool is illustrated with the planning of the test conditions for a forthcoming pilot test work and with the simulation of a 9-REE product SX separation plant.
A full factorial experimental design was conducted to investigate the effect of temperature and depressants on the flotation of monazite and bastnaesite from carbonate gangue minerals. Temperature, sodium silicate, and guar gum dosage were examined. Mineral reconstruction from energy-dispersive x-ray fluorescence (EDXRF) data was performed to quantify bastnaesite, monazite, and gangue mineral recoveries. Bastnaesite and monazite both follow first-order rates of recovery, with bastnaesite recovering faster and to a larger extent than monazite. The main gangue minerals were depressed together. Optimal separation efficiency was achieved using a larger Na2SiO3 dosage (2400 g/t), no guar gum addition, and a high temperature (75 °C). The rate of bastnaesite recovery increased with the temperature, while sodium silicate improved the ultimate recovery. An economic analysis was performed to evaluate the impact of increasing Rare Earth Element (REE) recovery by allowing a lower grade concentrate to be generated. Despite the high value of REEs, increasing recovery by producing a concentrate bearing more than 68 wt % carbonaceous gangue was uneconomical.
The electrolytic production of metallic zinc from processing zinc sulfide concentrates generates a residue containing cadmium, copper, and cobalt that need to be removed from the electrolytic zinc solution because they are harmful to the zinc electro-winning process. This residue is commonly sent to other parties that partly recover the contained elements. These elements can generate revenues if recovered at the zinc plant site. A series of laboratory tests were conducted to evaluate a method to process a zinc plant residue with the objective of recovering cobalt into a salable product. The proposed process comprises washing, selective leaching, purifying and precipitation of cobalt following its oxidation. The process allows the production of a cobalt rich hydroxide precipitate assaying 45 ± 4% Co, 0.8 ± 0.2% Zn, 4.4 ± 0.7% Cu, and 0.120 ± 0.004% Cd at a 61 ± 14% Co recovery. Replicating the whole process with different feed samples allowed the identification of the critical steps in the production of the cobalt product; one of these critical steps being the control of the oxidation conditions for the selective precipitation step.