Jesús María López-Lezama

Prof. Jesús María López-Lezama

Universidad de Antioquia (Colombia)
orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 May 2022 in IEEE Access
Verified
Journal Article
Open access
LGLuis Alfonso Gallego
Luis Alfonso Gallego
Jesús María López-LezamaJesús María López-Lezama
Jesús María López-Lezama
OCOscar Gómez Carmona
Oscar Gómez Carmona
Optimal capacitor placement and network reconfiguration are well-known methods to minimize losses, enhance reliability, and improve the voltage profile of electric distribution networks (EDNs). Distribution network reconfiguration (DNR) consists of altering the system topology by changing the states of ties and sectionalizing switches, while the optimal placement of capacitors (OPCAs) involves sizing and finding the optimal location of capacitor banks within the distribution network for reactive power control. DNR and OPCAs are challenging optimization problems involving both integer and continuous decision variables. Due to the nature of these problems (combinatorial optimization problems), most approaches that deal with DNR and OPCAs resort to metaheuristic techniques, and they are limited to applications in small-size distribution networks. Although these techniques have proven to be effective when dealing with non-convex optimization problems, their main drawbacks lie in the fact that they require the fine-tuning of several parameters and do not guarantee the finding of a globally optimal solution. This paper presents a mixed-integer linear programming (MILP) model to solve simultaneous DNR and OPCAs in radial distribution networks. The proposed model can be solved by commercially available software; it guarantees to obtain globally optimal solutions and requires low computational effort when compared with metaheuristic techniques employed for the same purpose. Several tests were carried out on seven benchmark EDNs ranging from 33 to 417 buses. In all cases, the proposed methodology was able to replicate the results reported in the specialized literature. Regarding the DNR alone, a novel solution was found for the 119-bus test system which is 1.86 % better than that previously reported in the specialized literature. Furthermore, new solutions are reported for the simultaneous optimal DNR and OPCAs for medium and large-size EDNs. The power loss reduction in the test system ranged from 21.12 % to 68.93 % evidencing the positive impact of the proposed approach in EDNs.

1 July 2013 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
MRMarcos J. Rider
Marcos J. Rider
Jesús María López-LezamaJesús María López-Lezama
Jesús María López-Lezama
JCJavier Contreras
Javier Contreras
APAntonio Padilha‐Feltrin
Antonio Padilha‐Feltrin
In this study, a novel approach for the optimal location and contract pricing of distributed generation (DG) is presented. Such an approach is designed for a market environment in which the distribution company (DisCo) can buy energy either from the wholesale energy market or from the DG units within its network. The location and contract pricing of DG is determined by the interaction between the DisCo and the owner of the distributed generators. The DisCo intends to minimise the payments incurred in meeting the expected demand, whereas the owner of the DG intends to maximise the profits obtained from the energy sold to the DisCo. This two‐agent relationship is modelled in a bilevel scheme. The upper‐level optimisation is for determining the allocation and contract prices of the DG units, whereas the lower‐level optimisation is for modelling the reaction of the DisCo. The bilevel programming problem is turned into an equivalent single‐level mixed‐integer linear optimisation problem using duality properties, which is then solved using commercially available software. Results show the robustness and efficiency of the proposed model compared with other existing models. As regards to contract pricing, the proposed approach allowed to find better solutions than those reported in previous works.

10 May 2010 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Jesús María López-LezamaJesús María López-Lezama
Jesús María López-Lezama
APAntonio Padilha-Feltrin
Antonio Padilha-Feltrin
JCJavier Contreras
Javier Contreras
JMJosé Ignacio Muñoz
José Ignacio Muñoz
This paper proposes a bilevel programming approach to determine the optimal contract price of dispatchable distributed generation (DG) units in distribution systems. Two different agents are considered in the model, namely, the distribution company (DisCo) and the owner of the DG. The former seeks the minimization of the payments incurred in attending the forecasted demand, while the latter seeks the maximization of his profit. To meet the expected demand, the DisCo has the option to purchase energy from any DG unit within its network and directly from the wholesale electricity market. A traditional distribution utility model with no competition among DG units is considered. The proposed model positions the DG owner in the outer optimization level and the DisCo in the inner one. This last optimization problem is substituted by its Karush-Kuhn-Tucker optimality conditions, turning the bilevel programming problem into an equivalent single-level nonlinear programming problem which is solved using commercially available software. Tests are performed in a modified IEEE 34-bus distribution network.

1 March 2012 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Closed access
Jesús María López-LezamaJesús María López-Lezama
Jesús María López-Lezama
JCJavier Contreras
Javier Contreras
APAntonio Padilha-Feltrin
Antonio Padilha-Feltrin

22 April 2022 in Energies
Verified
Journal Article
Open access
PDF file
LGLuis Alfonso Gallego
Luis Alfonso Gallego
Jesús María López-LezamaJesús María López-Lezama
Jesús María López-Lezama
OCOscar Gómez Carmona
Oscar Gómez Carmona
Distributed generation (DG) aims to generate part of the required electrical energy on a small scale closer to the places of consumption. Integration of DG into an existing electric distribution network (EDN) has technical, economic, and environmental benefits. DG placement is typically determined by investors and local conditions such as the availability of energy resources, space, and licenses, among other factors. When the location of DG is not a decision of the distribution network operator (DNO), the simultaneous integration of distribution network reconfiguration (DNR) and DG placement can maximize the benefits of DG and mitigate eventual negative impacts. DNR consists of altering the EDN topology to improve its performance while maintaining the radiality of the network. DNR and optimal placement of DG (OPDG) are challenging optimization problems since they involve integer and continuous variables subject to nonlinear constraints and a nonlinear objective function. Due to their nonlinear and nonconvex nature, most approaches to solve these problems resort to metaheuristic techniques. The main drawbacks of such methodologies lie in the fact that they are not guaranteed to reach an optimal solution, and most of them require the fine-tuning of several parameters. This paper recasts the nonlinear DNR and OPGD problems into linear equivalents to obtain a mixed-integer linear programming (MILP) model that guarantees global optimal solutions. Several tests were carried out on benchmark EDNs evidencing the applicability and effectiveness of the proposed approach. It was found that when no DG units are considered, the proposed model can find the same results reported in the specialized literature but in less computational time; furthermore, the inclusion of DG units along with DNR usually allows the model to find better solutions than those previously reported in the specialized literature.

19 February 2020 in Energies
Verified
Journal Article
Open access
PDF file
SSSergio Saldarriaga
Sergio Saldarriaga
Jesús María López-LezamaJesús María López-Lezama
Jesús María López-Lezama
Nicolás Muñoz-GaleanoNicolás Muñoz-Galeano
Nicolás Muñoz-Galeano
The optimal coordination of overcurrent relays (OCRs) has recently become a major challenge owing to the ever-increasing participation of distributed generation (DG) and the multi-looped structure of modern distribution networks (DNs). Furthermore, the changeable operational topologies of microgrids has increased the complexity and computational burden to obtain the optimal settings of OCRs. In this context, classical approaches to OCR coordination might no longer be sufficient to provide a reliable performance of microgrids both in the islanded and grid-connected operational modes. This paper proposes a novel approach for optimal coordination of directional OCRs in microgrids. This approach consists of considering the upper limit of the plug setting multiplier (PSM) as a variable instead of a fixed parameter as usually done in traditional approaches for OCRs coordination. A genetic algorithm (GA) was implemented to optimize the limits of the maximum PSM for the OCRs coordination. Several tests were performed with an IEC microgrid benchmark network considering several operational modes. Results showed the applicability and effectiveness of the proposed approach. A comparison with other studies reported in the specialized literature is provided showing the advantages of the proposed approach.