Planning, controlling, monitoring progress are key management functions for effective implementation of construction projects. Commonly used instruments enabling performance of these functions include schedules and budgets, often in the form of a cost estimate. They are created at the initial planning stage to monitor and control cost and time deviations. Moreover, popular monitoring techniques are, for example, observation of milestones and comparative analysis of actual versus planned costs. This article presents a work progress control tool - the Earned Value Method (EVM) - which, despite its benefits, remains relatively unused in construction projects. The impact of the planning phase on the results obtained during the monitoring and control phase when utilizing EVM is discussed. This case study provides practical examples of using EVM in the implementation of construction projects and with the use of computer software. The novelty of the article results from the introduction of additional sensitivity analysis illustrating the impact of factors, such as an increase in costs or a change in delivery dates to the course of deviation curves. Use of sensitivity analysis in relation to the results of the CPI and SPI calculations affords combining control of costs and time with risk monitoring in the project. The findings reveal significant benefits in using EVM to implement construction projects but also highlight some important limitations.
The thermal and moisture properties of building envelope materials determine their performance over many years of use. Moisture has a particularly negative impact, impairing all the technical parameters and adversely affecting the microclimatic conditions inside the building. This article presents research and analysis on the moisture behavior of partitions made of autoclaved aerated concrete. Autoclaved aerated concrete is a very popular material for building external walls because of its relatively good thermal insulation and sufficient strength, if it is not subjected to increased moisture. This study investigated how the moisture content of this material changes with the change in relative air humidity. The four most popular density classes were studied. The sorption isotherms were determined by the static gravimetric method throughout the whole hygroscopic range. Moreover, the applicability of various models to describe sorption isotherms of this material group has been extensively evaluated. The tested models (Peleg, Redlich, Chen, Oswin, Henderson, Lewicki, Caurie, and GAB) all provided a very good fit with the experimental results for the tested material group (R2 ranged from 0.9599 to 0.9978). This paper indicates that the use of two additional approximation parameters (SSE and RMSE) allows a more precise assessment of the quality of individual models.
1 September 2018 in International Journal of Heat and Mass Transfer
Moisture in porous building materials significantly affects all their technical parameters. For this reason, it is important to accurately determine coefficients that describe moisture transport inside these materials. The main parameters concerning the hygroscopic range are as follows: water vapor permeability δ, water vapor resistance factor μ, and water vapor diffusion coefficient D. Autoclaved aerated concrete (AAC), one of the most popular materials used for the construction of external walls, was tested. The study focused on the four density classes: 400, 500, 600, and 700. Using a modified cup method, measurements of the corresponding coefficients δ, μ, D were carried out in six ranges of relative air humidity: 11–30, 30–54, 54–60, 60–75, 75–85, 85–98%. The results prove that not only the level of humidity tested, but also the structure within the same material group has a significant impact on all parameters, strongly differentiating their values. In this regard, precise numerical simulations concerning moisture transport processes in autoclaved aerated concrete must take into account both its density class and the moisture range in which these processes occur.
This article presents the mind mapping technique which, despite many potential benefits, is still infrequently used in project management. The case study provides practical examples for use of the mind mapping technique when implemented in construction projects. The results of this study showed that the mind mapping technique helps project managers solve problems, define the scope of a project, schedule packages, and manage teams more effectively. Further, mind maps are useful for creating project plans, and for analysing existing plans so that they are easily understandable. This study concludes that the mind mapping technique is a creative and useful tool for project managers. The mind mapping technique enables the project manager to gather, manage, share, and communicate information quickly and easily.