Planning, controlling, monitoring progress are key management functions for effective implementation of construction projects. Commonly used instruments enabling performance of these functions include schedules and budgets, often in the form of a cost estimate. They are created at the initial planning stage to monitor and control cost and time deviations. Moreover, popular monitoring techniques are, for example, observation of milestones and comparative analysis of actual versus planned costs. This article presents a work progress control tool - the Earned Value Method (EVM) - which, despite its benefits, remains relatively unused in construction projects. The impact of the planning phase on the results obtained during the monitoring and control phase when utilizing EVM is discussed. This case study provides practical examples of using EVM in the implementation of construction projects and with the use of computer software. The novelty of the article results from the introduction of additional sensitivity analysis illustrating the impact of factors, such as an increase in costs or a change in delivery dates to the course of deviation curves. Use of sensitivity analysis in relation to the results of the CPI and SPI calculations affords combining control of costs and time with risk monitoring in the project. The findings reveal significant benefits in using EVM to implement construction projects but also highlight some important limitations.
Civil engineering is characterised by high volatility with respect to working conditions, which are the source of many threats to worker life and health and contribute to high accident rates. The purpose of this paper is to analyse and evaluate the phenomenon of accidents in Polish civil engineering and define the direction of changes that should occur in the safety area. The studies included in this research covered the years 2004–2018. The following indicators were used to assess the accident rates: (1) The total number of persons injured in workplace accidents and this total divided into fatal, severe, and minor accidents; (2) indicators of frequency of accidents in total and this total divided into minor, severe, and fatal accidents; (3) and an indicator of the severity of accidents. From the analysis of statistical data for the years 200–2018, the changes in accident rate parameters demonstrate the continuous improvement of workplace safety in the Polish civil engineering sector. From the analysed data from the 15 years, a clear decrease in the value of the applied indicators is apparent, including both the number of people involved in accidents and the frequency and severity of accidents.
Value Engineering is an analytical method used to optimize costs, consisting of negotiations, searching for substitutes and more efficient use of raw materials. It can be an effective support in defining material solutions while designing energy-efficient buildings. The research method adopted in this article is an analysis of the literature on value engineering and on the added value of the construction project and analysis of empirical data concerning an exemplary design solution for external walls in a multi-family building. It has been assumed that the reduction of the projected costs of the construction project (elimination of resources which do not create added value for the client) and at the same time increasing the energy efficiency of the facility are possible under the conditions of applying value engineering. The result of the calculations is the reduction of project costs according to the proposed model of value engineering.
Digital technologies can be used at any stage of the life cycle of a construction project, from the concept of the facility to the final of its operation. Construction companies use more and more available technological solutions, increasing mobility and safety at the construction site and facilitating the construction process. Digitization is increasingly affecting the modernization of the building management and operation process, saving time, making decision-making easier, causing saving financial resources and reducing the costs of energy and materials consumption. Not only investment of construction entrepreneurs in internal start-ups has been observed, but also the reverse phenomenon, involving the interest of technology companies in the construction investment market. The closed-circle economy allows economic growth while reducing and optimizing resource consumption-it deeply transforms patterns of production and consumption chains and designs business models anew. The aim of the article is to present the results of the literature review, from the angle of discussion of issues related to the digital technologies used in various stages of the life cycle of construction projects with the assumptions of a closed-cycle economy. three successive steps were carried out: (1) a search strategy was developed to systematically review the literature and collect a representative set of publications on the relation of circular economy to building and digital technologies applicable to the life cycle of a building facility using Google Scholar; (2) a list of publications in the ad-doc database was prepared in order to synthesize the literature review; (3) a subset of the literature reviews was organized, which enabled the acquisition of quantitative and qualitative data as well as information on the phenomenon of digital construction and the impact of this innovative change on the development of the concept of closed circuit economics.
This study proposes a method for inversely estimating the spatial distribution characteristic of a material’s elastic modulus using the measured value of the observation data and the distance between the measurement points. The structural factors in the structural system possess temporal and spatial randomness. One of the representative structural factors, the material’s elastic modulus, possesses temporal and spatial randomness in the stiffness of the plate structure. The structural factors with randomness are typically modeled as having a certain probability distribution (probability density function) and a probability characteristic (mean and standard deviation). However, this method does not consider spatial randomness. Even if considered, the existing method presents limitations because it does not know the randomness of the actual material. To overcome the limitations, we propose a method to numerically define the spatial randomness of the material’s elastic modulus and confirm factors such as response variability and response variance.