Muhamad Azry Khoiry

Muhamad Azry Khoiry


Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2011 in Procedia Engineering
Verified
Journal Article
Open access
NHN. Hamzah
N. Hamzah
MKMuhamad Azry Khoiry
Muhamad Azry Khoiry
IAI. Arshad
I. Arshad
NTN.M. Tawil
N.M. Tawil
AAA.I. Che Ani
A.I. Che Ani
Delay can be defined as time overrun or extension of time to complete the project. Construction delay is something that cannot avoided especially in government agencies in Malaysia. Therefore delay is a situation when the actual progress of a construction project is slower than the planned schedule or late completion of the projects. The causes of delay are taken from the pass literature review. There are two main type of delay: excusable delay and non-excusable delay. The literature reviews are summarized and the delay framework is constructed based on the literature review summary in context of public higher learning institutio

14 July 2022 in Buildings
Verified
Journal Article
Open access
PDF file
RBRami A. Bahamid
Rami A. Bahamid
SDSHU ING DOH
SHU ING DOH
MKMuhamad Azry Khoiry
Muhamad Azry Khoiry
Mukhtar A. KassemMukhtar A. Kassem
Mukhtar A. Kassem
Mohammed A. Al-SharafiMohammed A. Al-Sharafi
Mohammed A. Al-Sharafi
Construction is a critical sector of any economy in terms of value production, labor, and contributing to the gross national product. Managing risk is a relatively young area in Yemen’s construction sector, but it is gaining traction as building activity and competition rise. Construction firms mitigate risk by using a variety of risk management methods. Therefore, there is a need to assess these procedures in order to detect shortcomings. This research aims to establish the existing risk management strategies used in Yemeni building projects. Survey questionnaires were used to collect data. Respondents were drawn from Yemeni construction businesses. Risk management is not executed systematically, intentionally, or continuously, and most firms’ risk management procedures are reactive, semipermanent, informal, and unstructured, with no or few dedicated resources to address risks. This strategy is inconsistent with generally accepted risk management principles. Nonetheless, the findings suggest a general understanding of risk management and a willingness to learn from previous errors. The study of the findings suggests that risk identification approaches such as judgment and historical data are employed for risk analysis, and that the industry typically attempts to avoid or transfer risks in Yemeni building projects. The results shed light on the shortcomings of Yemen’s project management practices. To guarantee that construction projects obtain maximum value for money, project managers of big construction businesses in Yemen need a strong understanding of and training in globally accepted systematic risk management procedures. Finally, this study can help future stakeholders determine how to work together to manage risk.

9 June 2022 in Buildings
Verified
Journal Article
Open access
PDF file
MAMohammed Izrai AbdRazak
Mohammed Izrai AbdRazak
MKMuhamad Azry Khoiry
Muhamad Azry Khoiry
WBWan Hamidon Wan Badaruzzaman
Wan Hamidon Wan Badaruzzaman
AHAfifuddin Husairi Hussain
Afifuddin Husairi Hussain
To improve the performance of the construction industry, innovative methods were introduced to make them better. Industrialised building systems (IBS) and prefabrication construction are the popular methods used and studied. However, these methods are still unable to meet the demands of the stakeholders. Design for manufacturing and assembly (DfMA) is a design principle that is seen as capable of improving the situation. The uptake of DfMA in the construction industry needs to be analysed to obtain a better picture of the existing condition of the method and its manner of implementation it going forward, but there are still too few studies performed on this topic. This paper gathers relevant articles from the previous studies on DfMA. With the available data, the main benefits, hindrance factors, and enabling factors for DfMA uptake in the construction industry were identified in this study. The authors also identified the research trend among the research themes and the benefits of building information modelling (BIM) integration with DfMA. By synthesising the information from previous studies, a conceptual framework was developed. Knowledge gaps and future potential research topics are also discussed in this paper, forming a simple research framework for future effort guidance. With a suitable strategy and guidelines, the application of DfMA could improve the performance of the construction industry in Malaysia and other places with similar construction environments and approaches.

4 November 2019 in International Journal of Energy Sector Management
Verified
Journal Article
Closed access
Mukhtar A. KassemMukhtar A. Kassem
Mukhtar A. Kassem
MKMuhamad Azry Khoiry
Muhamad Azry Khoiry
NHNoraini Hamzah
Noraini Hamzah
Purpose: This study aims to investigate the risk factors in construction projects in oil and gas processing facilities in Yemen and serves as a case study for developing countries. Design/methodology/approach: By using a questionnaire, data were collected from 201 project managers and engineers employed in different sectors in the oil and gas industry in Yemen. Findings: The survey analysis based on Kruskal–Wallis test method shows a high degree of agreement on the perceptions of risk factors depending on categories of companies. In other words, the tested risk factors exist in all sectors of oil companies in Yemen and are valid as a measure of risk factors in construction projects in oil and gas organizations in general. Although no evidence suggests that the risk factors differ significantly according to job title, the result of identifiable risk factors according to experience shows a statistically significant difference among participants in terms of their experience. The relative importance of the ranking of risk factors was obtained by the statistical analysis of responses on the impact and likelihood of occurrence of these risks. Findings show that internal risks are the greatest influential factors in construction projects in the oil and gas sector, followed by changes during construction project, government instability, incorrect project cost estimation, government delay in decision making, incorrect project schedule estimation, and political situation and war in the country. Originality/value: These findings are valuable to organizations that are planning to conduct construction projects for oil and gas processing facilities in Yemen and other nations with similar environments, such as developing countries.

1 April 2021 in Brazilian Journal of Operations & Production Management
Verified
Journal Article
Open access
PDF file
MEMaryam Elmezain
Maryam Elmezain
WBWan Hamidon Wan Badaruzzaman
Wan Hamidon Wan Badaruzzaman
MKMuhamad Azry Khoiry
Muhamad Azry Khoiry
Goal: This study seeks to examine project success in relation to project managers’ factors. Pertaining to research questions, we highlighted: “do project manager’s technical, conceptual, political and human skills are significantly related to project success?, and does project manager’s age play a significant role in achieving project success? Design / Methodology / Approach: This research employed a quantitative research method using survey questionnaires to collect data from 400 project managers working in five well-known construction companies in Cairo, Egypt. Descriptive statistics using Relative Importance Index (RII) were employed to rank the dimensions of project manager’s skills: conceptual, technical, human and political skills; and project success dimensions: cost, schedule and quality. Multiple regression analysis was used to identify the impact of project managers’ skills on project success while simple linear regression was used to examine the relationship between project manager’s age and project success Results: The results of RII revealed that project managers maintain a competitive level of technical, conceptual, political and human skills, and emphasize on specific aspects of cost, schedule, and quality dimensions of project success. The regression analysis revealed that 49.2% of the explained variation in project success can be accounted for technical, political, human and conceptual skills at coefficient of determination values of 0.611, 0.506, 0.431 and 0.407 respectively while the project manager’s age had no association with project success with a P value 0.694 at alpha level of 0.05. Limitations of the investigation: Generalizing research findings might be challenged because sample size was randomly selected due lack of identifying the exact size target population. Practical implications: The managerial implication of this study lies in the need for construction companies not to consider project manager’s age as a significant factor for project success, instead they need to ensure that project managers possess a competitive level of conceptual, technical, political and human skills. Originality / Value: Pertaining to contribution to academia, this research argues that project success subject to a set of comprehensive set of project managerial skills namely conceptual, technical, political and human. Further, it is essential to distinguish between project manager’s age and experience and not to consider project manager’s age as a determinant of a project success.

25 October 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Fazilah hatta antahFazilah hatta antah
Fazilah hatta antah
MKMuhamad Azry Khoiry
Muhamad Azry Khoiry
Khairul Nizam Abdul MauludKhairul Nizam Abdul Maulud
Khairul Nizam Abdul Maulud
Azlina AbdullahAzlina Abdullah
Azlina Abdullah
Airborne light detection and ranging (LiDAR) surveying technology plays an important role in road design, and it is increasingly implemented in the design stage. The ability of LiDAR as a remote sensing technology to be used in non-accessible places (i.e., hilly terrain, steep slope) makes it a powerful tool, and it has the potential to provide benefits that simplify existing design processes for designers and practitioners. This paper reviews the application of airborne LiDAR in road design and factors including items from the perceived usefulness of technology. The context of the future direction of LiDAR technology is highlighted in civil engineering road design, roadway inspection and as-built documentation. The implementation of this technology is expected to assist the end-users in developing more manageable planning for road construction and thus to ensure the usage of LiDAR technology is enhanced from time to time, especially in Malaysia.