In the present research, industrial wastes, e.g., fly ash (FA), lithium slag (LS), ground granulated blast furnace slag (GGBS), and red mud (RM) were utilized to prepare the magnesium phosphate cement (MPC)-based grouting material by a two-component grouting method. Successive additions of GGBS within 40% (C1–C5) led to reduced fluidity, increased pH value, and shortened setting time. The compressive strength increased first and then decreased. The strength value reached the maximum at a 20% dosage (C3). Increasing the content of RM from 0% (C4) to 25% (C9) resulted in prolonged setting time and an increased pH value. The fluidity and compressive strength increased first and then decreased. The fluidity and strength value became the highest at a 15% additive ratio (C7). GGBS can significantly improve the strength and water resistance at 7 days and 28 days by the potential hydraulic property. RM has a smaller particle size than MP, making the microstructure denser by the pore-filling effect. Thus, the drying shrinkage was increased after adding GGBS, while it was decreased when incorporating RM. The MPC-based grouting material has a controllable short setting of 3–21 min, self-leveling fluidity above 200 mm, a near-neutral pH value, high early strength (1 day compressive strength of 5 MPa), minor drying shrinkage (one-tenth of OPC), and excellent water resistance (over 85%), which is much superior to traditional grouting materials.
31 January 2022 in Advances in Materials Science and Engineering
Waste sediment (WS) is a solid waste produced from subway construction. In the present work, high-volume WS was upcycled to prepare grouting material.The results showed that the working performances (consistency, fluidity, setting time, bleeding ratio, and stone ratio)of WS-based grouting material were significantly affected by the mass concentration of solid components, binder to WS ratio, and steel slag addition. This material can meet the engineering requirement by adjusting these parameters. The WS-based grouting material exhibited superior performance compared to traditional grouting materials. It achieved self-leveling (160 mm fluidity) and wassuitable for grouting (consistency within 100-130 mm, 95.0% stone ratio). Amorphous phases were formed in the hardened sample. The addition of a suitable amount of steel slag (10%) can reduce the total porosity, and also promote the hydration degree and increase the mechanical properties of cement matrix.The strength development can be attributed to the formation of hydration products and the cementation between hydrates and sediment particles.
The proliferation of high-speed railway (HSR) networks necessitates frequent construction activities adjacent to operational lines, posing significant risks to the structural integrity and safety of existing infrastructure. This study addresses the critical need for a comprehensive framework to assess and monitor the deformation of HSR piers throughout the entire construction process of a new, nearby bridge, which includes the cumulative effects of both substructure and superstructure construction. A hybrid methodology integrating quantitative risk assessment and real-time, non-contact monitoring was developed and implemented. A risk evaluation model was established using the Analytic Hierarchy Process (AHP) to structure the problem, combined with Triangular Fuzzy Numbers to handle the inherent uncertainties in expert judgments. The Fuzzy Comprehensive Evaluation method was then employed to quantify the risk levels of various construction stages. Concurrently, a vision-based monitoring system utilizing Digital Image Correlation (DIC) technology was deployed to capture the three-dimensional deformation of adjacent HSR piers with high precision and frequency. The case study, focusing on the construction of a new bridge crossing the operational Beijing-Shanghai HSR, demonstrated the application of this framework. The risk assessment model identified the pile cap and pier construction phase as the highest-risk stage, with a risk weight of 0.311. The DIC monitoring system, validated against total station measurements with a relative error of less than 5%, recorded the cumulative pier deformations throughout 31 distinct construction stages. The maximum recorded deformations in the transverse, longitudinal, and vertical directions were all maintained within the early warning threshold of ±1.2 mm stipulated by railway regulations. The study confirms that the integrated AHP-Fuzzy and DIC framework provides a robust paradigm for proactive risk management in adjacent-line construction projects. The risk model accurately predicted the most critical construction phase, and the DIC system offered a reliable and efficient solution for real-time safety assurance. The findings validate that with appropriate risk-informed monitoring, the impact of new bridge construction on existing HSR infrastructure can be effectively controlled within safe limits, offering a valuable reference for similar engineering projects globally.