The extensive development of high-speed railway (HSR) networks often necessitates construction activities adjacent to operational lines. However, existing studies have mostly focused on the substructure construction phase, lacking systematic consideration of cumulative effects throughout the construction process. This study proposes an integrated framework for risk-informed monitoring throughout the full construction process. The framework integrates the Analytic Hierarchy Process (AHP), triangular fuzzy numbers, and fuzzy comprehensive evaluation to construct a quantitative risk assessment model, decomposing the construction process into hierarchical risk factors and quantifying the weights of each factor. Furthermore, a non-contact real-time monitoring system based on Digital Image Correlation (DIC) is designed and deployed, enabling high-frequency, high-precision three-dimensional pier deformation measurement. Applied to a new bridge crossing the Beijing–Shanghai HSR, the risk model identified pile cap and pier construction as the highest-risk stage (weight: 0.311). The DIC system, validated against total station measurements (relative error < 5%), recorded cumulative pier deformations across 31 construction stages, all remaining within the ±1.2 mm early warning threshold, thereby validating the proposed risk assessment model. The integrated AHP-Fuzzy and DIC framework provides a robust paradigm for proactive risk management, confirming that risk-informed monitoring ensures construction impacts on existing HSR infrastructure remain within safe limits.

27 April 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
XJXuena Jia
Xuena Jia
LXLiang Xu
Liang Xu
FCFengkun Cui
Fengkun Cui
XWXingyu Wang
Xingyu Wang
JYJin Yao
Jin Yao
The proliferation of high-speed railway (HSR) networks necessitates frequent construction activities adjacent to operational lines, posing significant risks to the structural integrity and safety of existing infrastructure. This study addresses the critical need for a comprehensive framework to assess and monitor the deformation of HSR piers throughout the entire construction process of a new, nearby bridge, which includes the cumulative effects of both substructure and superstructure construction. A hybrid methodology integrating quantitative risk assessment and real-time, non-contact monitoring was developed and implemented. A risk evaluation model was established using the Analytic Hierarchy Process (AHP) to structure the problem, combined with Triangular Fuzzy Numbers to handle the inherent uncertainties in expert judgments. The Fuzzy Comprehensive Evaluation method was then employed to quantify the risk levels of various construction stages. Concurrently, a vision-based monitoring system utilizing Digital Image Correlation (DIC) technology was deployed to capture the three-dimensional deformation of adjacent HSR piers with high precision and frequency. The case study, focusing on the construction of a new bridge crossing the operational Beijing-Shanghai HSR, demonstrated the application of this framework. The risk assessment model identified the pile cap and pier construction phase as the highest-risk stage, with a risk weight of 0.311. The DIC monitoring system, validated against total station measurements with a relative error of less than 5%, recorded the cumulative pier deformations throughout 31 distinct construction stages. The maximum recorded deformations in the transverse, longitudinal, and vertical directions were all maintained within the early warning threshold of ±1.2 mm stipulated by railway regulations. The study confirms that the integrated AHP-Fuzzy and DIC framework provides a robust paradigm for proactive risk management in adjacent-line construction projects. The risk model accurately predicted the most critical construction phase, and the DIC system offered a reliable and efficient solution for real-time safety assurance. The findings validate that with appropriate risk-informed monitoring, the impact of new bridge construction on existing HSR infrastructure can be effectively controlled within safe limits, offering a valuable reference for similar engineering projects globally.