Davide Aloisio

Dr. Davide Aloisio

orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2020 in Energy Conversion and Management
Verified
Journal Article
Closed access
GTG. Tumminia
G. Tumminia
FGF. Guarino
F. Guarino
SLS. Longo
S. Longo
DADavide Aloisio
Davide Aloisio
SCS. Cellura
S. Cellura
Marco FerraroMarco Ferraro
Marco Ferraro

10 September 2013 in ChemElectroChem
Verified
Journal Article
Closed access
PDF file
SLSalvatore Gianluca Leonardi
Salvatore Gianluca Leonardi
DADavide Aloisio
Davide Aloisio
NDNicola Donato
Nicola Donato
PRPatrícia Russo
Patrícia Russo
MFMarta C. Ferro
Marta C. Ferro
Giovanni  NeriGiovanni Neri
Giovanni Neri

21 February 2024 in Energies
Verified
Journal Article
Open access
PDF file
Giovanni Lucà TrombettaGiovanni Lucà Trombetta
Giovanni Lucà Trombetta
SLSalvatore Gianluca Leonardi
Salvatore Gianluca Leonardi
DADavide Aloisio
Davide Aloisio
LALaura Andaloro
Laura Andaloro
FSFrancesco Sergi
Francesco Sergi
The emission reductions mandated by International Maritime Regulations present an opportunity to implement full electric and hybrid vessels using large-scale battery energy storage systems (BESSs). lithium-ionion batteries (LIB), due to their high power and specific energy, which allows for scalability and adaptability to large transportation systems, are currently the most widely used electrochemical storage system. Hence, BESSs are the focus of this review proposing a comprehensive discussion on the commercial LIB chemistries that are currently available for marine applications and their potential role in ship services. This work outlines key elements that are necessary for designing a BESS for ships, including an overview of the regulatory framework for large-scale onboard LIB installations. The basic technical information about system integration has been summarized from various research projects, white papers, and test cases mentioned in available studies. The aim is to provide state-of-the-art information about the installation of BESSs on ships, in accordance with the latest applicable rules for ships. The goal of this study is to facilitate and promote the widespread use of batteries in the marine industry.

15 January 2015 in Electroanalysis
Verified
Journal Article
Closed access
PDF file
Leonarda Francesca LiottaLeonarda Francesca Liotta
Leonarda Francesca Liotta
FPF. Puleo
F. Puleo
Valeria La ParolaValeria La Parola
Valeria La Parola
SLSalvatore Gianluca Leonardi
Salvatore Gianluca Leonardi
Nicola DonatoNicola Donato
Nicola Donato
Giovanni  NeriGiovanni Neri
Giovanni Neri

1 April 2020 in Journal of Energy Storage
Verified
Journal Article
Closed access
Marco FerraroMarco Ferraro
Marco Ferraro
GBG. Brunaccini
G. Brunaccini
FSF. Sergi
F. Sergi
DADavide Aloisio
Davide Aloisio
NRN. Randazzo
N. Randazzo
VAV. Antonucci
V. Antonucci

24 April 2023 in Thermal Science and Engineering Progress
Verified
Journal Article
Open access
GFGirolama Airò Farulla
Girolama Airò Farulla
Valeria PalombaValeria Palomba
Valeria Palomba
DADavide Aloisio
Davide Aloisio
GBGiovanni Brunaccini
Giovanni Brunaccini
Marco FerraroMarco Ferraro
Marco Ferraro
FSFrancesco Sergi
Francesco Sergi