Milica Pesic-Georgiadis

Ms. Milica Pesic-Georgiadis


Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 July 2016 in Energies
Verified
Journal Article
Open access
PDF file
Ranka StankovićRanka Stanković
Ranka Stanković
NVNikola Vulović
Nikola Vulović
NLNikola Lilic
Nikola Lilic
IOIvan Obradović
Ivan Obradović
RTRadule Tosovic
Radule Tosovic
MPMilica Pesic-Georgiadis
Milica Pesic-Georgiadis
This paper presents the development of a WebGIS application aimed at providing safe and reliable data needed for reclamation of abandoned mines in national parks and other protected areas in Vojvodina in compliance with existing legal regulations. The geodatabase model for this application has been developed using UML and the CASE tool Microsoft Visio featuring an interface with ArcGIS. The WebGIS application was developed using GeoServer, an open source tool in the Java programming language, with integrated PostgreSQL DB and the possibility of generating and publishing WMS, WFS and KML services. The WebGIS application is publicly available, based on an appropriate central database, which for the first time encompasses all available data on abandoned mines in Vojvodina, and as such may serve as a model for similar databases on the territory of the Republic of Serbia.

1 January 2021 in Podzemni radovi
Verified
Journal Article
Open access
PDF file
Petar MarkovićPetar Marković
Petar Marković
DSDejan Stevanovic
Dejan Stevanovic
MPMilica Pesic-Georgiadis
Milica Pesic-Georgiadis
MBMirjana Banković
Mirjana Banković
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple process, because it depends on a large number of affecting factors and criteria. This process can be significantly facilitated by the application of multi-criteria analysis methods, which enable establishment of interdependence between the criteria in order to select the optimal solution. This paper presents the possibilities of applying the Analytical Hierarchical Process (AHP) method for selecting the optimal block size for the needs of the coal deposit modelling process and mine planning, as well as the way in which this method can significantly facilitate problem solving, by looking at it from several aspects. The analysis included six criteria and four potential solutions, and the results themselves indicated the advantages and disadvantages of the applied method.