Dejan Stevanovic

Dr. Dejan Stevanovic


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2018 in Advances in Science and Technology Research Journal
Verified
Journal Article
Open access
DSDejan Stevanovic
Dejan Stevanovic
MLMilena Lekic
Milena Lekic
DKDaniel Petar Kržanović
Daniel Petar Kržanović
Ivica RistovicIvica Ristovic
Ivica Ristovic
As the mine planning is one of the most complicated steps, which depends on a lot of factors as geology, economy etc., consequently, the decision-making process is difficult, due to the existence of a lot of factors for choosing the optimal mining system. In this paper, the method and the result...

10 April 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
MČMiodrag Čelebić
Miodrag Čelebić
Dragoljub BajicDragoljub Bajic
Dragoljub Bajic
Sanja BajićSanja Bajić
Sanja Bajić
MBMirjana Banković
Mirjana Banković
DTDuško Torbica
Duško Torbica
DSDejan Stevanovic
Dejan Stevanovic
The selection of the optimal equipment for discontinuous haulage systems is one of the most important decisions that need to be made when an open-pit mine is designed. There are a number of influencing factors, including natural (geological and environmental), technical, economic, and social. Some of them can be expressed numerically, in certain units of measure, while others are descriptive and can be stated by linguistic variables depending on the circumstances of the project. These factors are characterized by a high level of uncertainty, associated with both exploration and mining operations. The experience, knowledge, and expert judgment of engineers and specialists are of key importance for the management of mining processes, consistent with the issues stemming from the dynamic expansion of open-pit mines in space over time. This paper proposes an integrated model that translates all the criteria that affect the selection of the optimal solution into linguistic variables. By employing the multiple-criteria decision-making method and combining it with fuzzy logic, we developed an algorithm that addresses all the above-mentioned uncertainties inherent in various mining processes where the experience of experts forms the basis. The fuzzy analytic hierarchy process is used in order to deal with trending decision problems, such as mining equipment and management system selection. The entire algorithm was applied to a real case study—the Ugljevik East 1 open-pit mine.

31 October 2023 in Minerals
Verified
Journal Article
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
SDSvetozar-Milan Doderovic
Svetozar-Milan Doderovic
SSSasa Stepanovic
Sasa Stepanovic
MBMirjana Banković
Mirjana Banković
DSDejan Stevanovic
Dejan Stevanovic
Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid model for the optimisation of waste dump design and site selection. The model is based on different mathematical methods (Monte Carlo simulation, genetic algorithm, analytic hierarchy process and heuristic methods) adapted to different aspects of the problem. The main objective of the model is to provide a solution (in analytical and graphical form) for the draft waste dump design, on the basis of which the final waste dump design can be defined. The functioning of the model is verified using an example of an existing open pit. In the case study, 2250 members of the initial population (different waste dump variants) were generated, and a total of 110 optimised solutions were obtained using 15 optimisations. The solution with the best value of the objective function is adopted, and the final waste dump design is created.

27 July 2021 in Minerals
Verified
Journal Article
Open access
PDF file
VRVeljko Rupar
Veljko Rupar
VČVladimir Čebašek
Vladimir Čebašek
VMVladimir Milisavljevic
Vladimir Milisavljevic
DSDejan Stevanovic
Dejan Stevanovic
NZNikola Zivanovic
Nikola Zivanovic
This paper presents a methodology for determining the uniaxial and triaxial compressive strength of heterogeneous material composed of dacite (D) and altered dacite (AD). A zone of gradual transition from altered dacite to dacite was observed in the rock mass. The mechanical properties of the rock material in that zone were determined by laboratory tests of composite samples that consisted of rock material discs. However, the functional dependence on the strength parameter alteration of the rock material (UCS, intact UCS of the rock material, and mi) with an increase in the participation of “weaker” rock material was determined based on the test results of uniaxial and triaxial compressive strength. The participation of altered dacite directly affects the mode and mechanism of failure during testing. Uniaxial compressive strength (σciUCS) and intact uniaxial compressive strength (σciTX) decrease exponentially with increased AD volumetric participation. The critical ratio at which the uniaxial compressive strength of the composite sample equals the strength of the uniform AD sample was at a percentage of 30% AD. Comparison of the obtained exponential equation with practical suggestions shows a good correspondence. The suggested methodology for determining heterogeneous rock mass strength parameters allows us to determine the influence of rock material heterogeneity on the values σciUCS, σciTX, and constant mi. Obtained σciTX and constant mi dependences define more reliable rock material strength parameter values, which can be used, along with rock mass classification systems, as a basis for assessing rock mass parameters. Therefore, it is possible to predict the strength parameters of the heterogeneous rock mass at the transition of hard (D) and weak rock (AD) based on all calculated strength parameters for different participation of AD.

26 February 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Petar MarkovićPetar Marković
Petar Marković
DSDejan Stevanovic
Dejan Stevanovic
BKBozo Kolonja
Bozo Kolonja
DSDragana Slavkovic
Dragana Slavkovic
DKDaniel Petar Kržanović
Daniel Petar Kržanović
The strategic planning of open-pit mining projects is highly influenced by geological variability, economic fluctuations, and operational uncertainties. Traditional deterministic optimization models often fail to account for these uncertainties, leading to potentially misleading economic evaluations. This paper proposes a hybrid model that integrates deterministic and stochastic optimization methods, following the principles of the ISO 31000 risk management framework, to comprehensively quantify uncertainty through key parameters affecting strategic mine planning. Monte Carlo simulations were applied to generate probability distributions of input parameters, including metal prices, mining and processing costs, and ore grade variability, allowing for a more robust financial assessment. The results demonstrate that while the deterministic approach estimates an NPV of USD 130.8 million, the stochastic model yields an average NPV of USD 155.5 million with a standard deviation of USD 76.5 million, highlighting the significant variability in financial outcomes. Risk assessment using Value at Risk (VaR) and Conditional Value at Risk (CVaR) further quantifies potential financial losses, revealing a 3% probability of project unprofitability. The developed methodology provides a structured approach to integrating uncertainty into mine planning, enabling more reliable economic evaluations and improving decision-making in strategic mining operations.

24 July 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
SDSvetozar-Milan Doderovic
Svetozar-Milan Doderovic
SSSasa Stepanovic
Sasa Stepanovic
MBMirjana Banković
Mirjana Banković
DSDejan Stevanovic
Dejan Stevanovic
Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. Working with this amount of material usually requires high-capacity systems for excavation and loading, a large fleet of trucks for haulage, construction, and maintenance of a complex roads network, use of a significant area of land in order to achieve the required capacities, etc. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid model for the optimisation of waste dump design and site selection. The model is based on different mathematical methods (genetic algorithm, analytic hierarchy process and heuristic methods) adapted to different aspects of the problem. The main objective of the model is to provide a solution (in analytical and graphical form) for the draft waste dump design, on the basis of which the final waste dump design can be defined.