Mirjana Banković

Prof. Dr. Mirjana Banković

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 April 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
MČMiodrag Čelebić
Miodrag Čelebić
Dragoljub BajicDragoljub Bajic
Dragoljub Bajic
Sanja BajićSanja Bajić
Sanja Bajić
MBMirjana Banković
Mirjana Banković
DTDuško Torbica
Duško Torbica
DSDejan Stevanovic
Dejan Stevanovic
The selection of the optimal equipment for discontinuous haulage systems is one of the most important decisions that need to be made when an open-pit mine is designed. There are a number of influencing factors, including natural (geological and environmental), technical, economic, and social. Some of them can be expressed numerically, in certain units of measure, while others are descriptive and can be stated by linguistic variables depending on the circumstances of the project. These factors are characterized by a high level of uncertainty, associated with both exploration and mining operations. The experience, knowledge, and expert judgment of engineers and specialists are of key importance for the management of mining processes, consistent with the issues stemming from the dynamic expansion of open-pit mines in space over time. This paper proposes an integrated model that translates all the criteria that affect the selection of the optimal solution into linguistic variables. By employing the multiple-criteria decision-making method and combining it with fuzzy logic, we developed an algorithm that addresses all the above-mentioned uncertainties inherent in various mining processes where the experience of experts forms the basis. The fuzzy analytic hierarchy process is used in order to deal with trending decision problems, such as mining equipment and management system selection. The entire algorithm was applied to a real case study—the Ugljevik East 1 open-pit mine.

31 October 2023 in Minerals
Verified
Journal Article
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
SDSvetozar-Milan Doderovic
Svetozar-Milan Doderovic
SSSasa Stepanovic
Sasa Stepanovic
MBMirjana Banković
Mirjana Banković
DSDejan Stevanovic
Dejan Stevanovic
Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid model for the optimisation of waste dump design and site selection. The model is based on different mathematical methods (Monte Carlo simulation, genetic algorithm, analytic hierarchy process and heuristic methods) adapted to different aspects of the problem. The main objective of the model is to provide a solution (in analytical and graphical form) for the draft waste dump design, on the basis of which the final waste dump design can be defined. The functioning of the model is verified using an example of an existing open pit. In the case study, 2250 members of the initial population (different waste dump variants) were generated, and a total of 110 optimised solutions were obtained using 15 optimisations. The solution with the best value of the objective function is adopted, and the final waste dump design is created.

28 February 2024 in Energies
Verified
Journal Article
Open access
PDF file
Miljan GomilanovicMiljan Gomilanovic
Miljan Gomilanovic
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
MBMirjana Banković
Mirjana Banković
Nikola StanicNikola Stanic
Nikola Stanic
SSSasa Stepanovic
Sasa Stepanovic
This paper presents a model for determining the availability of continuous systems at open pits using the neuro-fuzzy system. The concept of availability is divided into partial indicators (synthetic indicators and sub-indicators). The presented model in relation to already existing models for determining availability uses a combination of the advantages of artificial neural networks and fuzzy logic. The case study addressed the I ECC (bucket wheel excavator–conveyors–crushing plant) system of the open pit Drmno, Kostolac. In this paper, in addition to the ANFIS model for determining the availability of continuous systems, a simulation model was developed. The obtained results of the ANFIS model were verified with the help of a simulation model that uses certain assumptions about the distribution of failures. This paper was created as a result of several years of field and theoretical research into the availability of continuous systems in open pits, and completes a cycle that consists of several published articles on the subject of modeling the behavior of these systems in real time using a time picture of the state, expert assessment, simulation and AI models, while respecting the multidisciplinarity of the problem (mining technological, mechanical, and information technological aspects). The developed ANFIS model is a key instrument for improving operational efficiency and resource management in the mining sector. Its ability to accurately predict the availability of the ECC system brings not only operational benefits through reduced downtime and optimized maintenance, but also a potential reduction in overall costs at coal open pits. Such an innovative model marks a significant step forward in the mining industry, especially when it comes to continuous systems in coal open pits.

1 January 2018 in Thermal Science
Verified
Journal Article
Open access
MBMirjana Banković
Mirjana Banković
DSDejan Stevanovic
Dejan Stevanovic
MPMilica Pesic
Milica Pesic
Aleksandra TomaševićAleksandra Tomašević
Aleksandra Tomašević
LKLjiljana Kolonja
Ljiljana Kolonja
The main goal of coal quality control in lignite mines is to supply coal to power plants within certain quality constraints. Coal properties can affect the efficiency, reliability, and availability of both the boiler and the emission control units. This paper presents a new based integrated mine process simulation approach to investigate the variability of the calorific value in exploitation a complex lignite deposits. Results provide valuable insight into the performance of a continuous mining system in terms of controlling coal quality variability.

24 July 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
SDSvetozar-Milan Doderovic
Svetozar-Milan Doderovic
SSSasa Stepanovic
Sasa Stepanovic
MBMirjana Banković
Mirjana Banković
DSDejan Stevanovic
Dejan Stevanovic
Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. Working with this amount of material usually requires high-capacity systems for excavation and loading, a large fleet of trucks for haulage, construction, and maintenance of a complex roads network, use of a significant area of land in order to achieve the required capacities, etc. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid model for the optimisation of waste dump design and site selection. The model is based on different mathematical methods (genetic algorithm, analytic hierarchy process and heuristic methods) adapted to different aspects of the problem. The main objective of the model is to provide a solution (in analytical and graphical form) for the draft waste dump design, on the basis of which the final waste dump design can be defined.

1 January 2021 in Podzemni radovi
Verified
Journal Article
Open access
PDF file
Petar MarkovićPetar Marković
Petar Marković
DSDejan Stevanovic
Dejan Stevanovic
MPMilica Pesic-Georgiadis
Milica Pesic-Georgiadis
MBMirjana Banković
Mirjana Banković
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple process, because it depends on a large number of affecting factors and criteria. This process can be significantly facilitated by the application of multi-criteria analysis methods, which enable establishment of interdependence between the criteria in order to select the optimal solution. This paper presents the possibilities of applying the Analytical Hierarchical Process (AHP) method for selecting the optimal block size for the needs of the coal deposit modelling process and mine planning, as well as the way in which this method can significantly facilitate problem solving, by looking at it from several aspects. The analysis included six criteria and four potential solutions, and the results themselves indicated the advantages and disadvantages of the applied method.