The newly developed RECoverable Autonomous Sonde (RECAS) allows sampling and analysis of subglacial water while the subglacial lake remains isolated from the surface. The sonde was successfully tested in East Antarctica during the 2021–2022 field season: it reached the ice-sheet base at a depth of 200.3 m, sampled basal meltwater and measured its pressure, temperature, pH and conductivity and returned to the ice surface. The average downward penetration rate was 1.85 m h−1, and the average upward penetration rate was 2.94 m h−1. The successful test of a self-melting, recoverable probe in Antarctica marks further progress towards the clean exploration of subglacial water bodies.
28 May 2024 in Science China Technological Sciences
A 198.8 m deep borehole was drilled through ice to subglacial bedrock in the northwestern marginal part of Princess Elizabeth Land, ~12 km south of Zhongshan Station, in January–February 2019. Three years later, in February 2022, the borehole temperature profile was measured, and the geothermal heat flow (GHF) was estimated using a 1-D time-dependent energy-balance equation. For a depth corresponding to the base of the ice sheet, the GHF was calculated as 72.6 ± 2.3 mW m−2and temperature −4.53 ± 0.27°C. The regional averages estimated for this area based, generally, on tectonic setting vary from 55 to 66 mW m−2. A higher GHF is interpreted to originate mostly from the occurrence of metamorphic complexes intruded by heat-producing elements in the subglacial bedrock below the drill site.
As a result of the severe natural environment with oxygen deficit in the Antarctic, using conventional manual work to screw and unscrew the drill pipe increases the labor intensity tremendously and causes an efficiency reduction. Therefore, it would be useful to design a clamper inside the drilling shelter, which could help to assemble and disassemble the ice core barrel with screw connection. This paper describes the design of and experiments with the clamper inside the movable drilling shelter. A related testing stand was also designed and built to experiment on relationships between the clamper motor current versus clamping torque and force. Through experimental data collation and calculation analysis, the following conclusions could be drawn: (1) according to the rotary ability of the Ice and Bedrock Electromechanical Drill (IBED) to calculate and determine the torque of clamper, the clamping torque required to provide by the clamper is 100 N·m; (2) finite element simulation and analysis of the non-standard transmission chain showed that the mechanical reliability of the subparts; (3) the experimental results showed the range of the clamping force and clamping torque of the clamper. The clamping force and clamping torque increased with the increase of clamper DC motor current, presenting proportional linear relationships. The clamper can meet the clamping requirements of IBED for screwing, unscrewing, and clamping, which will be greatly helpful when it is tested in the field.
Hot water drilling is a drilling method that employs high-temperature and high-pressure hot water jetting to achieve ice melting drilling. Characterized by rapid drilling speed and large hole diameter, it is widely used for drilling observation holes in polar ice sheets and ice shelves. Understanding the hole-enlargement process at the bottom of hot water-drilled holes is crucial for rationally designing the structure of hot water drills. However, due to the complexity of heat transfer processes, no suitable theoretical model currently exists to accurately predict this process. To address this, this paper establishes an experimental platform for hot water drilling and conducts 24 sets of experiments under different drilling parameters using visualization techniques. The study reveals the influence mechanisms of drilling speed, hot water flow rate, hot water temperature, downhole drill shape, and nozzle structure on the hole-forming process at the borehole bottom. Experimental results indicate that the primary hole enlargement occurs near the nozzle, achieving 69–81% of the theoretical maximum borehole diameter. The thermal melting efficiency at the borehole bottom is approximately 80%, with about 20% of the input hot water energy heating the surrounding ice. Under identical hot water parameters, jet shapes and drill shapes exhibit minimal impact on borehole geometry. But the improvement of the jet speed and hot water temperature can accelerate the hole-forming process.
Ice cores from ice shelves contain abundant paleoclimatic information and provide essential information concerned with the prediction of future climatic change and global sea level variations. Efficient retrieval of ice cores is always an engineering challenge in polar ice and marine research. Here, we present design and other information of a new hot-water ice-coring drill used in combination with a hot-water drilling system that provides a rapid and environmentally friendly ice coring system. The coring system shares the surface equipment and hydraulic hose with the hot-water drilling system. Tests with the drill were carried out at an ice drill testing facility, and theoretical estimations were performed to predict the rate of penetration (ROP) and water flow rates. The results indicate the optimal water temperature for ice-coring to be 50 °C, and the most suitable water flow rate to be from 42 L/min to 55 L/min. With those drilling parameters, the maximum ROP is 27.8 m/h and the ice cores are 55–59 mm in diameter.