Roman Dychkovskyi

Prof. Dr. Roman Dychkovskyi

Dnipro University of Technology
orcid

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 September 2022 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
ISIaroslav Shavarskyi
Iaroslav Shavarskyi
VFVolodymyr Falshtynskyi
Volodymyr Falshtynskyi
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
Oleksandr AkimovOleksandr Akimov
Oleksandr Akimov
Dariusz SALADariusz SALA
Dariusz SALA
VBValentyn Buketov
Valentyn Buketov
Purpose is to study influence of a longwall face advance on the geomechanical situation in the neighbourhood of a mining site based upon determination of changes in standard and critical subsidence of the immediate roof rocks. Methods. To study a geomechanical situation in the neighbourhood of a mining site the authors have applied software product GeoDenamics Lite developed at Dnipro University of Technology. The software product relies upon a calculation procedure of stress-strain state of rocks by Professor O.V. Savostianov. Expediency of the software selection is based upon the supported control and adaptation of a coal mining technique to changes in geodynamic stress fields in the anisotropic rock-coal medium impacting temporal and spatial changes in the technological parameters. Findings. The basic problems have been singled out connected with certain changes in a longwall face advance. For the first time, an analytical scheme of tangential stresses within the immediate roof rocks has been developed for Lisova mine of SE Lvivvuhillia under the conditions of coal seam mining by means of the paired longwalls which makes it possible to determine both physical and geometrical parameters of standard loads within the formation. Originality. Dependencies of temporal and spatial changes in subsidences and horizontal displacements of rock layers of the immediate roof have been defined being 5.2 m for the upper rock pack and 3.9 m for the lower pack if the longwall longwall face advance is 1.9 up to 4.8 m/day. Both physical and geometrical parameters of the reference pressure have been defined as well as the parameters of lower sandstone pack in the process of the main roof subsidence. Impact of the extra pressure forces on the immediate roof rocks has been analyzed at the moment of critical lowerings of the immediate roof rocks. In this context, standard loading from the overlying formation in addition to tangential stresses in the roof result in rock failure due to vertical cracks above a longwall face. Practical implications. The engineering methods have been developed making it possible to identify impact parameters of a longwall face advance on the geomechanical situation in the neighbourhood of a mining site. In future, it will help forecast changes in the reference pressure around a longwall face while preventing emergency settlement of the powered support.

25 June 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
ISIvan Sadovenko
Ivan Sadovenko
AZAlina Zahrytsenko
Alina Zahrytsenko
Pavlo SaikPavlo Saik
Pavlo Saik
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
The objective is to analyze the dynamics of the underground water of a mine field based on the study of the geofiltration process of the rock mass disturbed by mining to achieve safe extraction operations as well as subsurface territories at the stage of the mining enterprise closure. Numerical modeling, based on a finite difference method under the conditions of multifactority and definite uncertainty of processes of transformation of technogenic environment of a mine field, helps solve a problem concerning underground water dynamics forecasting. A hydrodynamic model of the M.I. Stashkov mine was developed while solving option series of epignosis problems in terms of the chronology of mine field stoping. The abovementioned made it possible to identify regularities of the history of filtration, the capacity parameters of rock mass and the expansion of areas of heightened hydraulic conductivity as well as to evaluate qualitatively the water balance components of a carbonic watered formation and an overlying one. The stage of mining closure helped obtain the forecasting hydrodynamic solutions. The efficiency of measures, concerning reduction of water ingress into mine workings and the mitigation of surface ecological effects of mine flooding was evaluated quantitatively. It was determined that implementation of the water control procedures makes it possible to perform a 10–38% decrease in water ingress. In this context, they may be applied both independently and simultaneously. In terms of mine closure and flooding, a period of complete underground water recovery takes three years; in the process, surface zones of potential waterlogging and swamping are developed within the floodplain of Samara River, located at the territory of Western Donbas (Ukraine). The scientific novelty is to define regularities of hydraulic conductivity transformation of the rock mass of a mine field starting from the mine working roof fall, up to its compaction during the mine operation period. To do that, nonstationary identification problems were solved, using numerical modeling. The abovementioned makes it possible to improve the reliability of hydrodynamic prognoses and develop technological schemes to control water at the state of the mine closure.

1 January 2020 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
ISIaroslav Shavarskyi
Iaroslav Shavarskyi
Pavlo SaikPavlo Saik
Pavlo Saik
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
VFVolodymyr Falshtynskyi
Volodymyr Falshtynskyi
ECEdgar Caceres Cabana
Edgar Caceres Cabana

7 September 2018 in Rudarsko-geološko-naftni zbornik
Verified
Journal Article
Open access
PDF file
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
OVOleksandr Vladyko
Oleksandr Vladyko
DMDmytro Maltsev
Dmytro Maltsev
ECEdgar Caceres Cabana
Edgar Caceres Cabana
Sometimes in mining it is necessary to combine different extracting technologies within one enterprise. So, in the paper the analysis of scientific and technical mining operations with combined technologies is carried out, the search for...

30 June 2018 in Mining of Mineral Deposits
Verified
Journal Article
Open access
NUNational Mining University
National Mining University
VFV Falshtynskyi
V Falshtynskyi
Pavlo SaikPavlo Saik
Pavlo Saik
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo

30 December 2023 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
Pavlo SaikPavlo Saik
Pavlo Saik
OCOleksii Cherniaiev
Oleksii Cherniaiev
OAOleh Anisimov
Oleh Anisimov
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
AAAndrii Adamchuk
Andrii Adamchuk
Purpose. The research purpose is to study the conditions for mining deposits of metamorphic and igneous origin to produce crushed stone products in conditions of limited electricity supply. Methods. The research uses an integrated approach, including data analysis on quarry field spatial dimensions and the overburden rock thickness, which provides the basis for identifying deposits into basic groups. For the identified groups of deposits, taking into account the hydrological characteristics of non-metallic deposits and their parameters, patterns have been determined that characterize the change in the normative atmospheric precipitation inflow, based on the quarry field area and the change in the specific costs for water drainage depending on the studied quarry field type. Based on data on technical characteristics of mobile and semi-stationary units and aggregates, the parameters of physical-mechanical properties of granites and diorites, technical-technological solutions for the formation of complexes for processing raw materials for the production of crushed stone products are proposed. Findings. Problems arising during mining operations under conditions of limited electricity supply, which is caused by mass attacks on Ukraine’s energy infrastructure, have been revealed. A systematization of deposits of igneous and metamorphic origin for mining of rock building materials, which are the basis for the production of crushed stone products, has been developed. The rates of water inflow into the mined-out space depending on the quarry field spatial parameters and the depth of mining operations have been studied. Technological schemes of the apparatuses of a complex for processing raw materials for production of crushed stone products and the apparatuses of a complex for processing siftings are proposed. Originality. Dependences of possible water inflow into the mined-out space of the quarry and change in energy consumption for water drainage have been determined, taking into account the accepted classification criteria, namely the quarry field spatial dimensions, the overburden rock thickness and the quarry depth. Practical implications. The obtained data on the possible water inflow into the mined-out space of the quarry and change in energy consumption for water drainage make it possible to assess the efficiency of pumping units. The proposed technical-technological solutions on formation of complexes for processing raw materials to produce crushed stone products have been developed in accordance with the fundamental provisions of the Law of Ukraine “On approval of the National program for the development of the mineral resource base of Ukraine for the period up to 2030”.