Petlovanyi Mykhailo

Dr. Petlovanyi Mykhailo

Dnipro University of Technology
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 December 2022 in Energies
Verified
Journal Article
Open access
PDF file
Adam SmolińskiAdam Smoliński
Adam Smoliński
DMDmyto Malashkevych
Dmyto Malashkevych
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Kanay RysbekovKanay Rysbekov
Kanay Rysbekov
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Kateryna SaiKateryna Sai
Kateryna Sai
Backfilling technology is not always used by mining enterprises, which is conditioned by technological and economic factors, such as the need for high mining rates and costs for the technological processes of transporting backfill materials from the daylight surface to the mined-out space. This concerns the underground mining of hard coal, which is a strategic energy resource, in the mines of Ukraine. This paper aims to study the effect of leaving the waste bottom rocks in the mined-out space of the longwall face without their drawing to the earth’s surface on the geomechanical state of the rocks surrounding the longwall face. The geomechanical assessment of the stress state of the rock mass surrounding the longwall face, when leaving the waste rocks from the seam bottom rocks in the mined-out space, is performed by the finite element method using the Ansys software package. A geomechanical model has been developed and substantiated, which adequately reflects the mining-geological conditions for seam mining within the extraction site, the actual structure and properties of the coal-bearing rock stratum, the parameters of the longwall face and the modified powered support for the processes of leaving the rocks in the mined-out space. The values and patterns have been determined of the decrease in the stress intensity concentrations in the coal-bearing roof mass in the frontal bearing pressure zone and destressing zone with an increase in the ratio of the rock pack thickness to the extracting seam thickness. The relative indicators of the load on the powered support section and the lowering of its roof have been determined by the ratio of the thickness of the rock pack formed in the mined-out space to the extracting seam thickness. The proposed mining method is of significant commercial and research interest for owners of coal mines developing thin coal seams because environmental costs for placing waste on the surface are reduced, and the energy potential of coal is increased due to the separation of waste rocks from coal in underground conditions. The need for a cycle of beneficiation of mined mass is eliminated and the geomechanical conditions of coal mining processes are improved.

15 January 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Serhii ZubkoSerhii Zubko
Serhii Zubko
Kateryna SaiKateryna Sai
Kateryna Sai
Pavlo SaikPavlo Saik
Pavlo Saik
The present paper considers aspects of underground iron ore mining in Ukraine, in particular the level of mine production and reserves of basic ore fields. It analyzes and generalizes the practice of using cemented rockfill under difficult mining and hydrogeological conditions of the Pivdenno-Bilozerske high-grade iron ore field. The Belozersky iron ore district is the only one in Ukraine that, without any technological cycle of beneficiation, can provide both domestic and foreign consumers with high-quality raw iron ore as required by world markets. The PJSC Zaporizhzhia iron ore plant extracts iron ore from the Pivdenno-Bilozerske field with an iron content of more than 60% using the low-waste, environmentally friendly technology of backfilling the mined-out area with a hardening mixture. The peculiarities of the technology for steep deposit mining and the main processes of backfilling operations in terms of preparation, transportation, and construction of the backfill mass with its stability assessment are explained in detail in this paper. As a result of using cemented rockfill, rock mass stability is provided, a considerable part of industrial waste is disposed of in the mined-out area, and the earth’s surface subsidence within the area is prevented (in comparison with mining enterprises in other fields).

30 March 2018 in International Journal of Engineering Research in Africa
Verified
Journal Article
Closed access
PDF file
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Pavlo SaikPavlo Saik
Pavlo Saik
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Kateryna SaiKateryna Sai
Kateryna Sai
YMYevhenii Malanchuk
Yevhenii Malanchuk
In this paper, the geological faults in the zone of stable geodynamic and tectonic activity are studied. The purpose of the analytical research is to establish regularities of rock pressure in the hanging and foot walls of the geological fault and its influence on the state-deformed state of the rock massif. Comprehensive methodology that included analytical calculation will be implemented in the work. Taking into account the complexity of determining the stress-deformed state of the rocks, evaluation method of tension is adopted. Results of previously conducted computer modeling results are compared with analytic data. Conclusions regarding the implementation of the offered method are made on the basis of undertaken investigations. The obtained results with sufficient accuracy in practical application will allow consume coal reserves in the faulting zones.

30 March 2019 in Mining of Mineral Deposits
Verified
Journal Article
Open access
DTDnipro University of Technology
Dnipro University of Technology
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
OKO Kuzmenko
O Kuzmenko
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
VPV Popovych
V Popovych
Pavlo SaikPavlo Saik
Pavlo Saik

1 January 2019 in Rudarsko-geološko-naftni zbornik
Verified
Journal Article
Open access
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
PSPavlo Saik
Pavlo Saik
KSKateryna Sai
Kateryna Sai
The development of iron-ore deposits is accompanied by the excavation formation of considerable dimensions in the underground space and to ensure high technical and economic indicators of extraction, especially when developing high-grade iron ore, it is necessary to take into account the nature of the geological structure of the massif on the indicators of their dilution. It is established that when the chambers are worked out on a junction with hanging wall waste, the indices of ore dilution with the adjacent strata are 1.7 times higher than on a junction with the foot wall of the deposit. The tendencies and causes of variability of volume of extracted ore dilution with the adjacent strata in different geological structure parts of the ore deposits are revealed, the ore basin across the pitch is characterized by a general evolving trend of the rock strength of the hanging wall and ore basin angle of incidence decreasing and increasing the thickness of the deposit from the northern side to the southern one. It has been established that the concentration of hanging rocks caving and extracted ore dilution indices is enhanced by changing their morphological composition, reducing the strength and stability of these rocks, reducing the ore basin angle of incidence, and increasing the ore deposit thickness. The obtained results allow us to lay the foundations for optimizing the parameters of the development system and the rational procedure for breaking up ore reserves in the chambers under the changing mining and geological conditions of field development.

1 November 2018 in International Journal of Mining Science and Technology
Verified
Journal Article
Open access
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
PSPavlo B. Saik
Pavlo B. Saik
KSKateryna S. Sai
Kateryna S. Sai