Pavlo Saik

Dr. Pavlo Saik

Dnipro University of Technology
orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2018 in International Journal of Engineering Research in Africa
Verified
Journal Article
Closed access
PDF file
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Pavlo SaikPavlo Saik
Pavlo Saik
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Kateryna SaiKateryna Sai
Kateryna Sai
YMYevhenii Malanchuk
Yevhenii Malanchuk
In this paper, the geological faults in the zone of stable geodynamic and tectonic activity are studied. The purpose of the analytical research is to establish regularities of rock pressure in the hanging and foot walls of the geological fault and its influence on the state-deformed state of the rock massif. Comprehensive methodology that included analytical calculation will be implemented in the work. Taking into account the complexity of determining the stress-deformed state of the rocks, evaluation method of tension is adopted. Results of previously conducted computer modeling results are compared with analytic data. Conclusions regarding the implementation of the offered method are made on the basis of undertaken investigations. The obtained results with sufficient accuracy in practical application will allow consume coal reserves in the faulting zones.

15 January 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Serhii ZubkoSerhii Zubko
Serhii Zubko
Kateryna SaiKateryna Sai
Kateryna Sai
Pavlo SaikPavlo Saik
Pavlo Saik
The present paper considers aspects of underground iron ore mining in Ukraine, in particular the level of mine production and reserves of basic ore fields. It analyzes and generalizes the practice of using cemented rockfill under difficult mining and hydrogeological conditions of the Pivdenno-Bilozerske high-grade iron ore field. The Belozersky iron ore district is the only one in Ukraine that, without any technological cycle of beneficiation, can provide both domestic and foreign consumers with high-quality raw iron ore as required by world markets. The PJSC Zaporizhzhia iron ore plant extracts iron ore from the Pivdenno-Bilozerske field with an iron content of more than 60% using the low-waste, environmentally friendly technology of backfilling the mined-out area with a hardening mixture. The peculiarities of the technology for steep deposit mining and the main processes of backfilling operations in terms of preparation, transportation, and construction of the backfill mass with its stability assessment are explained in detail in this paper. As a result of using cemented rockfill, rock mass stability is provided, a considerable part of industrial waste is disposed of in the mined-out area, and the earth’s surface subsidence within the area is prevented (in comparison with mining enterprises in other fields).

30 March 2019 in Mining of Mineral Deposits
Verified
Journal Article
Open access
DTDnipro University of Technology
Dnipro University of Technology
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
OKO Kuzmenko
O Kuzmenko
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
VPV Popovych
V Popovych
Pavlo SaikPavlo Saik
Pavlo Saik

29 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
OAOleh Anisimov
Oleh Anisimov
Pavlo SaikPavlo Saik
Pavlo Saik
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Oleksandr AkimovOleksandr Akimov
Oleksandr Akimov
LHLeonid Hrytsenko
Leonid Hrytsenko
In the surface mining of mineral deposits, land resources suitable for agricultural purposes are inappropriately spent in large volumes. When mining deep open pits, overburden rocks are mainly transported to the surface. The optimal solution for reducing the area of disturbed lands is the placement of overburden rocks in internal dumps in the open pit. This is especially suitable when mining a mineral deposit with several open pits where at least one of them is depleted. Therefore, it is important to assess the feasibility of building an internal dump, based on the stability parameters of its slopes and the safe distance for placing mining equipment within its boundaries, which was the focus of this research. Numerical modeling with Slide 5.0 software was used to determine the stability of the dump slope inside the open pit and the safe distance from the upper slope edge for placing mining equipment. This reflected the geomechanical situation occurring within the boundaries of the dump formed in the open-pit field with a high degree of reliability. It was determined that the maximum standard safety factor values of the open-pit slopes are within the limits when the overburden rocks border on the hard bedrock (Ks.s.f ≥ 1.2). Under the condition where the dump slope bordered on sedimentations represented by clays, loams, and sands with a strength of 2–3 on the Mohs scale, the safety factor decreased by 22%. It was determined that the minimum safe distance from the outer contour of the dragline base to the upper edge of a single-tier dump was 15.5 m with a safety factor of 1.21. The maximum safe distance values in the range of 73.5–93 m were concentrated within the boundaries of sections 5–9, with a safety factor from 1.18 to 1.28. When the dragline was located within the boundaries of section 7, the dump construction works should be conducted only if the dump exist for up to 3 years. Based on the identified parameters, on the example of using the ESH-11/70 walking dragline, a technological scheme of its operation was developed with the allocation of safe boundaries for its placement when forming an internal dump. The results obtained are useful for the development of projects for the reclamation of depleted open pits.

25 June 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
ISIvan Sadovenko
Ivan Sadovenko
AZAlina Zahrytsenko
Alina Zahrytsenko
Pavlo SaikPavlo Saik
Pavlo Saik
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
The objective is to analyze the dynamics of the underground water of a mine field based on the study of the geofiltration process of the rock mass disturbed by mining to achieve safe extraction operations as well as subsurface territories at the stage of the mining enterprise closure. Numerical modeling, based on a finite difference method under the conditions of multifactority and definite uncertainty of processes of transformation of technogenic environment of a mine field, helps solve a problem concerning underground water dynamics forecasting. A hydrodynamic model of the M.I. Stashkov mine was developed while solving option series of epignosis problems in terms of the chronology of mine field stoping. The abovementioned made it possible to identify regularities of the history of filtration, the capacity parameters of rock mass and the expansion of areas of heightened hydraulic conductivity as well as to evaluate qualitatively the water balance components of a carbonic watered formation and an overlying one. The stage of mining closure helped obtain the forecasting hydrodynamic solutions. The efficiency of measures, concerning reduction of water ingress into mine workings and the mitigation of surface ecological effects of mine flooding was evaluated quantitatively. It was determined that implementation of the water control procedures makes it possible to perform a 10–38% decrease in water ingress. In this context, they may be applied both independently and simultaneously. In terms of mine closure and flooding, a period of complete underground water recovery takes three years; in the process, surface zones of potential waterlogging and swamping are developed within the floodplain of Samara River, located at the territory of Western Donbas (Ukraine). The scientific novelty is to define regularities of hydraulic conductivity transformation of the rock mass of a mine field starting from the mine working roof fall, up to its compaction during the mine operation period. To do that, nonstationary identification problems were solved, using numerical modeling. The abovementioned makes it possible to improve the reliability of hydrodynamic prognoses and develop technological schemes to control water at the state of the mine closure.

1 January 2020 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
ISIaroslav Shavarskyi
Iaroslav Shavarskyi
Pavlo SaikPavlo Saik
Pavlo Saik
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
VFVolodymyr Falshtynskyi
Volodymyr Falshtynskyi
ECEdgar Caceres Cabana
Edgar Caceres Cabana