Dong-bo Zhou

Dr. Dong-bo Zhou


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
DZDong-bo Zhou
Dong-bo Zhou
XWXueyan Wang
Xueyan Wang
LZLiangjie Zhao
Liangjie Zhao
JSJinxin Shen
Jinxin Shen
YLYuanying Liu
Yuanying Liu
So far, there have been a large number of diaphragm walls in the Yangtze River Delta as engineering examples of deep foundation pit maintenance structures in subway stations, but there is a lack of systematic research and summary on the deformation characteristics of ground connecting walls. This study aimed to clarify the deformation law of the diaphragm wall during the excavation of a deep foundation pit in a soft soil region. Based on the monitoring data of the diaphragm wall of the deep foundation pit of the Hangzhou metro station, the monitoring data of the deep foundation pits of 15 subway stations in Shanghai and Ningbo cities around Hangzhou were considered. Grouping and classification methods were used to analyze the similarities and differences in the deformation characteristics of the diaphragm wall in the three regions. The results indicate the following: the maximum lateral deformation of the diaphragm wall in Hangzhou increases linearly with the relative depth of the maximum lateral deformation. The maximum lateral deformation of the foundation pit in Hangzhou is 0.072% H∼0.459% H, with a mean of 0.173% H. The wall deformation in Hangzhou varies significantly with the depth of the foundation pit, but the influence of the depth of the foundation pit on the wall deformation is considerably less than that in Shanghai and Ningbo. The corresponding position of the maximum lateral deformation in the excavation depth increases linearly with the excavation depth of the foundation pit, and the corresponding position of the lateral deformation of the diaphragm wall in Shanghai is more affected by the excavation depth of the foundation pit. The lateral deformation of the diaphragm wall increases rapidly in the range of 0 H–0.5 H, and the maximum lateral deformation occurs at 0.5 H–1.1 H.

16 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
DZDong-bo Zhou
Dong-bo Zhou
WSWenyan Shi
Wenyan Shi
YZYuhang Zhang
Yuhang Zhang
YZYu Zhang
Yu Zhang
Due to the large cross-section design of large-diameter shield tunnels, most of the rocks and soils it crosses are composite strata with upper soft and lower hard. In order to reduce the construction cost of shield working shafts, large-diameter shield launching is usually buried at a shallow depth. Based on the typical large-diameter slurry shield tunnel, the following research results were obtained according to field monitoring and PLAXIS 3D finite element simulation. (1) The electronic level is used to monitor the surface settlement, and the field monitoring data were obtained; the surface settlement duration curve at the axis of the shield tunnel during the construction period can be divided into four stages: pre-deformation, shield passing, shield tail exit and shield moving away, of which the surface settlement accounts for the largest proportion during the shield passing. (2) In order to ensure the accuracy of the numerical simulation results, the linear shrinkage of the shield needs to be considered in the modeling. (3) The maximum surface settlement value at the center of the tunnel increases with the increase of the support pressure; when the support pressure exceeds 300 kPa, the surface uplift and the settlement caused by the formation loss will offset, and the surface settlement will decrease instead. The maximum surface settlement value is inversely proportional to the grouting pressure, but with the increase of the grouting pressure, the maximum uplift of the surface continues to increase. (4) With the numerical simulation of excavation step construction, the surface uplift increases with the increase of grouting pressure and shield radius, and decreases with the increase of shield buried depth.

1 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
LWLu Wang
Lu Wang
DZDong-bo Zhou
Dong-bo Zhou
LFLiaoyuan Fu
Liaoyuan Fu
Excavations in a soft soil area are usually associated with substantial difficulties. Taking a special‐shaped deep foundation pit in Hangzhou soft clay as the research object, the excavation performances, including groundwater level height, axial force, lateral wall, and soil deflection, and ground surface settlement were monitored and summarized based on the data published in the literature on similar excavations in Hangzhou, P. R. China. The following conclusions are drawn: (1) The axial forces of the struts dynamically change during the excavation and construction or removal of adjacent braces. (2) The ratio between the measured maximum wall deflection and excavation depth (δh−max/He) is 0.14–0.17%, larger than those in Shanghai. (3) The surface settlement behind the wall has an obvious primary influence zone and secondary influence zone, characterized by a “groove shape” and “triangle shape,” respectively. The maximum ground surface settlement δv−max ranges from 0.29% to 0.5% of the excavation depth. (4) The distribution of the ground settlement was analyzed. The relationship between the maximum settlements δv−max is between 1.28 δh−max and 3.72 δh−max. Moreover, ABAQUS software with Mohr–Coulomb soil models was used for model analysis of the construction process. The research results have important significance for the effective prevention of foundation pit accidents and the optimal design of deep foundation pit projects.

8 March 2022 in Frontiers in Earth Science
Verified
Journal Article
Open access
YMYuan Mei
Yuan Mei
DZDong-bo Zhou
Dong-bo Zhou
CHChang-Ming Hu
Chang-Ming Hu
XWXue-Yan Wang
Xue-Yan Wang
YZYuhang Zhang
Yuhang Zhang
WSWenyan Shi
Wenyan Shi
Taking the loess high-fill project of Lv Liang airport in China as the research object, large-scale centrifugal tests were carried out to investigate the deformation characteristics of the collapsible loess ultrahigh-fill slope under natural moisture content and saturated state by using a joint model of undisturbed loess and remolded loess. The results show that the consolidation deformation of the collapsible loess ultrahigh-fill slope is the main factor causing its deformation. The post-construction deformation amount and deformation rate are large in the early stage, and the relationship between the post-construction deformation and thickness of filling body is linear. When the water content of soil increases due to infiltration, the consolidation of the filling body and the collapse of the undisturbed foundation loess will cause settlement and deformation of the slope. The slope may crack along the soft zone formed when the water infiltrates. When failure occurs, the sliding surface will pass through the collapsible soil layer. The contact surface between the collapsible loess layer and the adjacent soil layer is part of the sliding surface, and the contact surface with a relatively low strength will be damaged first. When the strength difference between adjacent soil layers is large, the upper soil layer on the slip surface shows a typical translational sliding mode. The slip surface is approximately arc-shaped, and there is a transition layer with a specific thickness between the slip surface and contact surface. The water content of the high-fill slope has a great influence on the post-construction settlement of the slope crest and slope stability. The post-construction settlement of the slope crest increases with the increase in the water content of the filling body, and the stability coefficient of the slope decreases with the increase in the water content of the filling body. In the saturated state, the sliding force of soil increases, the shear strength decreases, and the stability of high fill slope decreases. Therefore, it is necessary to strengthen the inspection of the rationality of drainage system design in slope construction to ensure slope safety.

28 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
DZDong-bo Zhou
Dong-bo Zhou
HGHang Gong
Hang Gong
XKXin Ke
Xin Ke
WXWangyang Xu
Wangyang Xu
WSWenyan Shi
Wenyan Shi
When large-diameter slurry shields are tunneling in a composite stratum with a high clay content, the cutter head may form a mud cake. After the mud cake is formed, it will cover the cutter and reduce the opening rate of the cutter head, thus reducing the penetration of the cutter and the driving speed. Based on a road upgrading project, this paper studies the prevention and treatment of a mud cake and forms a set of comprehensive treatment methods. For a large mud cake, through theoretical analysis, two calculation methods of the cutter head sealing coefficient are obtained, and the cutter head sealing coefficient relationship model is established. Comparing the calculated cutter head’s actual opening coefficient with the required cutter head opening coefficient can provide a judgment basis for the time of manual warehousing. For medium and small mud cakes, the numerical simulation is carried out based on the cutter head and the scouring system, the distribution characteristics of the flow field near the cutter head are analyzed, and the angle of the central scouring hole is optimized. For a small mud cake, hydrogen peroxide is selected as an additive through microscopic mechanism analysis. The effect of the hydrogen peroxide solution concentration on dissolving a mud cake is obtained through laboratory tests, and its effectiveness is verified through field tests. The research results can provide a reference for the mud cake prevention of slurry shields in similar strata.

7 November 2025 in Buildings
Verified
Journal Article
Open access
PDF file
WXWentian Xu
Wentian Xu
LLLifen Lin
Lifen Lin
NZNengwen Zhu
Nengwen Zhu
YZYan Zhao
Yan Zhao
HYHong Yang
Hong Yang
DZDong-bo Zhou
Dong-bo Zhou
This paper focuses on a deep foundation pit project of a metro shaft constructed by the cover-and-excavation reverse method in a section of Guangzhou Metro Line 13. This study integrates field monitoring data, three-dimensional finite element simulations, and parametric analyses to propose a systematic optimization design framework, providing a more comprehensive and reliable quantitative basis for the design of support structures for deep metro foundation pits constructed using the cut-and-cover top-down method. The study examines the effects of pile diameter, pile spacing, embedment depth, and types of retaining structures on pit deformation. The results indicate that increasing the pile diameter from 800 mm to 1000 mm reduces the maximum lateral displacement of the retaining structure by 30.7%, while decreasing the pile spacing from 2000 mm to 1600 mm results in a 17.5% reduction in deformation. However, beyond these thresholds, the marginal improvement becomes less significant. An embedment depth of 4 m for shallow sections and 2.5 m for deep sections is recommended to balance deformation control and construction economy. Diaphragm walls outperform bored piles and secant piles in deformation control. The optimized design achieves an estimated cost reduction of approximately 15% while maintaining safety requirements. The optimized parameters and comparative conclusions derived from this study can be directly applied to the design of deep foundation pits for metro stations under similar geological conditions. These findings provide crucial data support and theoretical reference for formulating more economical and safer design codes and standards.