Yuan Mei

Prof. Dr. Yuan Mei


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 May 2019 in Arabian Journal for Science and Engineering
Verified
Journal Article
Closed access
PDF file
YMYuan Mei
Yuan Mei
YLYa-Li Li
Ya-Li Li
XWXue-Yan Wang
Xue-Yan Wang
JWJuan Wang
Juan Wang
CHChang-Ming Hu
Chang-Ming Hu

24 April 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MWMengqi Wang
Mengqi Wang
Jian XuJian Xu
Jian Xu
XZXuejing Zhang
Xuejing Zhang
LTLongzhen Tan
Longzhen Tan
YMYuan Mei
Yuan Mei
The optimal proportion of alkali-activated steel slag–slag cementitious materials is investigated by considering the combined effects of steel slag content, alkali content, water glass modulus, and water–binder ratio using the Box–Behnken design in response surface methodology. Qualitative and semi-quantitative analyses of X-ray diffraction (XRD) patterns and scanning electron microscopy with energy-dispersive spectroscopy (SEM-EDS) images are conducted. The microstructural mechanism is elucidated based on the chemical composition, surface morphology, and microscale pore (crack) structures of the samples. A microreaction model for the alkali-activated steel slag and slag is proposed. The optimal composition for alkali-activated steel slag–slag cementitious materials is as follows: steel slag content, 38.60%; alkali content, 6.35%; water glass modulus, 1.23; and water–binder ratio, 0.48. The strength values predicted by the response surface model are p1d = 32.66 MPa, p7d = 50.46 MPa, and p28d = 56.87 MPa. XRD analysis confirms that the compressive strength of the sample is not only influenced by the amount of gel formed, but also, to a certain extent, by the CaCO3 crystals present in the steel slag, which act as nucleation sites. The SEM-EDS results confirm that the gel phase within the system comprises a hydrated calcium silicate gel formed through the reaction of volcanic ash and geopolymer gel formed through geo-polymerization. Analysis of the pore (crack) structure reveals that the compressive strength of the specimens is primarily influenced by porosity, with a secondary influence of the pore fractal dimension.

16 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
DZDong-bo Zhou
Dong-bo Zhou
WSWenyan Shi
Wenyan Shi
YZYuhang Zhang
Yuhang Zhang
YZYu Zhang
Yu Zhang
Due to the large cross-section design of large-diameter shield tunnels, most of the rocks and soils it crosses are composite strata with upper soft and lower hard. In order to reduce the construction cost of shield working shafts, large-diameter shield launching is usually buried at a shallow depth. Based on the typical large-diameter slurry shield tunnel, the following research results were obtained according to field monitoring and PLAXIS 3D finite element simulation. (1) The electronic level is used to monitor the surface settlement, and the field monitoring data were obtained; the surface settlement duration curve at the axis of the shield tunnel during the construction period can be divided into four stages: pre-deformation, shield passing, shield tail exit and shield moving away, of which the surface settlement accounts for the largest proportion during the shield passing. (2) In order to ensure the accuracy of the numerical simulation results, the linear shrinkage of the shield needs to be considered in the modeling. (3) The maximum surface settlement value at the center of the tunnel increases with the increase of the support pressure; when the support pressure exceeds 300 kPa, the surface uplift and the settlement caused by the formation loss will offset, and the surface settlement will decrease instead. The maximum surface settlement value is inversely proportional to the grouting pressure, but with the increase of the grouting pressure, the maximum uplift of the surface continues to increase. (4) With the numerical simulation of excavation step construction, the surface uplift increases with the increase of grouting pressure and shield radius, and decreases with the increase of shield buried depth.

1 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
LWLu Wang
Lu Wang
DZDong-bo Zhou
Dong-bo Zhou
LFLiaoyuan Fu
Liaoyuan Fu
Excavations in a soft soil area are usually associated with substantial difficulties. Taking a special‐shaped deep foundation pit in Hangzhou soft clay as the research object, the excavation performances, including groundwater level height, axial force, lateral wall, and soil deflection, and ground surface settlement were monitored and summarized based on the data published in the literature on similar excavations in Hangzhou, P. R. China. The following conclusions are drawn: (1) The axial forces of the struts dynamically change during the excavation and construction or removal of adjacent braces. (2) The ratio between the measured maximum wall deflection and excavation depth (δh−max/He) is 0.14–0.17%, larger than those in Shanghai. (3) The surface settlement behind the wall has an obvious primary influence zone and secondary influence zone, characterized by a “groove shape” and “triangle shape,” respectively. The maximum ground surface settlement δv−max ranges from 0.29% to 0.5% of the excavation depth. (4) The distribution of the ground settlement was analyzed. The relationship between the maximum settlements δv−max is between 1.28 δh−max and 3.72 δh−max. Moreover, ABAQUS software with Mohr–Coulomb soil models was used for model analysis of the construction process. The research results have important significance for the effective prevention of foundation pit accidents and the optimal design of deep foundation pit projects.

1 August 2021 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
CHChangming Hu
Changming Hu
JWJuan Wang
Juan Wang
YMYuan Mei
Yuan Mei
Construction project schedule is to bring the completion time and the total cost into balance by allocating resources. In order to shorten the completion time and decrease the total cost as far as possible, three time-resource-cost trade-off models for construction project under uncertain environment, including expected value (E-V) model, chance-constrained (C-C) model and chance maximization (C-M) model, were built by using uncertain theory. The duration time of activities, the allocation time of material resources and human resources are considered as uncertain variables in the three models. The E-V model was to shorten the expected completion time under the chance constraint of cost. The C-C model was to obtain the minimum completion time under the chance constraints of completion time and cost. The C-M model was to maximize the chance that the completion time is not lager than the due date under the chance constraint of cost. For the convenience of calculation, the three models were changed into crisp equivalent form. A practical case study was provided to show the application process of three models and the results can be obtained by using the genetic algorithm. Finally, some extended construction project scheduling models are introduced.

28 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
DZDong-bo Zhou
Dong-bo Zhou
HGHang Gong
Hang Gong
XKXin Ke
Xin Ke
WXWangyang Xu
Wangyang Xu
WSWenyan Shi
Wenyan Shi
When large-diameter slurry shields are tunneling in a composite stratum with a high clay content, the cutter head may form a mud cake. After the mud cake is formed, it will cover the cutter and reduce the opening rate of the cutter head, thus reducing the penetration of the cutter and the driving speed. Based on a road upgrading project, this paper studies the prevention and treatment of a mud cake and forms a set of comprehensive treatment methods. For a large mud cake, through theoretical analysis, two calculation methods of the cutter head sealing coefficient are obtained, and the cutter head sealing coefficient relationship model is established. Comparing the calculated cutter head’s actual opening coefficient with the required cutter head opening coefficient can provide a judgment basis for the time of manual warehousing. For medium and small mud cakes, the numerical simulation is carried out based on the cutter head and the scouring system, the distribution characteristics of the flow field near the cutter head are analyzed, and the angle of the central scouring hole is optimized. For a small mud cake, hydrogen peroxide is selected as an additive through microscopic mechanism analysis. The effect of the hydrogen peroxide solution concentration on dissolving a mud cake is obtained through laboratory tests, and its effectiveness is verified through field tests. The research results can provide a reference for the mud cake prevention of slurry shields in similar strata.