28 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YMYuan Mei
Yuan Mei
DZDong-bo Zhou
Dong-bo Zhou
HGHang Gong
Hang Gong
XKXin Ke
Xin Ke
WXWangyang Xu
Wangyang Xu
WSWenyan Shi
Wenyan Shi
When large-diameter slurry shields are tunneling in a composite stratum with a high clay content, the cutter head may form a mud cake. After the mud cake is formed, it will cover the cutter and reduce the opening rate of the cutter head, thus reducing the penetration of the cutter and the driving speed. Based on a road upgrading project, this paper studies the prevention and treatment of a mud cake and forms a set of comprehensive treatment methods. For a large mud cake, through theoretical analysis, two calculation methods of the cutter head sealing coefficient are obtained, and the cutter head sealing coefficient relationship model is established. Comparing the calculated cutter head’s actual opening coefficient with the required cutter head opening coefficient can provide a judgment basis for the time of manual warehousing. For medium and small mud cakes, the numerical simulation is carried out based on the cutter head and the scouring system, the distribution characteristics of the flow field near the cutter head are analyzed, and the angle of the central scouring hole is optimized. For a small mud cake, hydrogen peroxide is selected as an additive through microscopic mechanism analysis. The effect of the hydrogen peroxide solution concentration on dissolving a mud cake is obtained through laboratory tests, and its effectiveness is verified through field tests. The research results can provide a reference for the mud cake prevention of slurry shields in similar strata.

25 December 2025 in Buildings
Verified
Journal Article
Open access
PDF file
XKXin Ke
Xin Ke
XTXinyu Tian
Xinyu Tian
LLLu Lingwei
Lu Lingwei
YRYanmei Ruan
Yanmei Ruan
TCTong Chen
Tong Chen
HYHui ru Yu
Hui ru Yu
As an emerging construction method, the lateral launching technique for shield tunneling can ensure launching safety while significantly reducing disturbances to urban traffic. However, the influence of its design parameters on construction stability and economic performance has not yet been systematically investigated, thereby limiting its broader application in complex urban environments. To address this gap, this study proposes a comprehensive analytical framework integrating field monitoring, numerical modeling, orthogonal experiments, and regression-based optimization. Relying on a shield lateral launching project in a central urban district of Guangzhou, a systematic investigation is conducted. Field monitoring data are used to verify the reliability of the three-dimensional finite element model, confirming that deformations of both the retaining structures and the surrounding ground remain within a stable and controllable range. On this basis, the orthogonal experimental method is, for the first time, introduced into the parameter sensitivity analysis of the shield lateral launching technique. The analysis reveals the influence ranking of support parameters on surface settlement. Key parameters are then selected for optimization design according to the sensitivity order, followed by a comprehensive evaluation of deformation control effectiveness and economic performance of the optimized scheme. The results show that the deformation of both the retaining structures and the ground during construction remains below the control limits, indicating good structural stability. Among the supporting parameters, the sensitivity coefficients from high to low are the diaphragm wall thickness HW, the grouting reinforcement range HG, the initial support thickness of the lateral-shifting tunnel H1, the initial support thickness of the advance launching tunnel H2, and the elastic modulus of the diaphragm wall EW. Based on the sensitivity ranking, the highly sensitive parameters are selected for optimization, and the optimal parameter combination is determined to be a diaphragm wall thickness of 1000 mm, a grouting reinforcement range of 1600 mm, and an initial support thickness of 100 mm for the lateral-shifting tunnel. This combination meets the safety requirements for surface settlement while effectively reducing material consumption and improving economic performance. The study provides technical and theoretical references for shield launching under complex conditions.

29 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
FDFeng Duan
Feng Duan
YCYe Cui
Ye Cui
XXXiaohong Xue
Xiaohong Xue
JWJian Wang
Jian Wang
WKWanliang Kang
Wanliang Kang
XKXin Ke
Xin Ke
Taking the over-track development project of a metro depot in Chongqing as the engineering background, this study investigates the socket-type disc-lock full-hall scaffold system beneath the long-span transfer beam of Tower 9. A finite element model was established using MIDAS Civil to analyze the stress distribution and deformation characteristics of the scaffold system under construction loads, and the model was validated through field monitoring. On this basis, a parametric analysis was conducted to investigate the effects of erection height, step spacing of vertical standards, spacing between vertical standards, sweeping rod height, and joint stiffness on the overall stability of the scaffold system. A fitted analytical model for the buckling eigenvalue was further established. The results show that the scaffold system was mainly subjected to compression during construction. The measured maximum compressive stress of the vertical standards was 90.92 MPa, with an error of 12.50% compared with the finite element result of 80.82 MPa. The measured maximum tensile stress was 22.37 MPa, which was close to the calculated value of 21.96 MPa. The measured maximum average cumulative vertical displacement of the scaffold was 1.69 mm, which did not exceed the allowable deformation range during construction. The parametric analysis indicates that increases in erection height, step spacing of vertical standards, spacing between vertical standards, and sweeping rod height reduce the overall stability of the scaffold system, among which the step spacing of vertical standards has the most significant influence. In contrast, increasing joint stiffness is beneficial for enhancing the stability reserve. In this study, the overall stability of the scaffold system is characterized by the buckling eigenvalue obtained from linear eigenvalue buckling analysis. These findings can provide a reference for parameter selection, scheme comparison, and construction control of similar disc-lock high-formwork support systems for heavily loaded transfer beams. However, the conclusions of this study are mainly based on linear eigenvalue buckling analysis and single-factor parametric investigation, without further consideration of material nonlinearity and multi-parameter interaction effects.

30 April 2026 in Buildings
Verified
Journal Article
Open access
PDF file
JLJian Li
Jian Li
XXXiaohong Xue
Xiaohong Xue
JWJian Wang
Jian Wang
WKWanliang Kang
Wanliang Kang
BZBoyang Zhang
Boyang Zhang
XKXin Ke
Xin Ke
Taking a metro over-track TOD (Transit-Oriented Development) project in Chongqing as the engineering background, this study adopts a combined research approach integrating field measurements and numerical simulation. A coupled finite element model of the train–track–tunnel–soil–building system and a regional acoustic model are established to systematically reveal the vibration response characteristics of building clusters above the depot induced by metro operation, the propagation mechanism of structure-borne secondary noise, and the distribution patterns of the regional acoustic environment, while identifying the areas where vibration and noise exceed the prescribed limits as well as the key influencing factors. On this basis, following a hierarchical mitigation strategy consisting of source control, path interruption, and receiver protection, an integrated control scheme is proposed through the coordinated application of track vibration reduction, building vibration isolation, acoustic environment optimization, and building sound insulation. The engineering applicability and control effectiveness of the proposed scheme are further verified by numerical simulation. The findings of this study can provide theoretical support and technical reference for the refined design and integrated prevention and control of vibration and acoustic environments in similar metro over-track development projects.